[1]
Adnan Enshassi et al. 2013. Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip. Journal of Construction in Developing Countries. 18, 1 (Jun. 2013), 73–94. DOI:https://doi.org/10.21315/.