[1]
Hamed Samarghandi et al. 2016. Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran. Journal of Construction in Developing Countries. 21, 1 (Jul. 2016), 51–84. DOI:https://doi.org/10.21315/Jcdc2016.21.1.4.