[1]
Puti Marzuki et al. 2026. Interface Problems in Change Order-Challenged Projects. Journal of Construction in Developing Countries. 24, 2 (Sep. 2026), 1–22. DOI:https://doi.org/10.21315/Jcdc2019.24.2.1.