[1]
Prasanna Venkatesan Ramani et al. 2022. Application of Linear Scheduling in Water Canal Construction with a Comparison of Critical Path Method. Journal of Construction in Developing Countries. 27, 1 (Jun. 2022), 189–212. DOI:https://doi.org/10.21315/jcdc2022.27.1.11.