(1)
Adnan Enshassi; Sherif Mohamed; Munther Abdel-Hadi. Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip. JCDC 2013, 18 (1), 73–94. https://doi.org/10.21315/.