(1)
Chandrasekaran Balaji Venkateswaran; Rajiah Murugasan. Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India. JCDC 2017, 22 (Supp. 1), 79–96. https://doi.org/10.21315/Jcdc2017.22.Supp1.5.