Adnan Enshassi, Sherif Mohamed, & Munther Abdel-Hadi. (2013). Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), 73–94. https://doi.org/10.21315/