Hamed Samarghandi (2016) “Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran”, Journal of Construction in Developing Countries, 21(1), pp. 51–84. doi:10.21315/Jcdc2016.21.1.4.