[1]
Sitwala Simushi and Jan Wium, “Time and Cost Overruns on Large Projects: Understanding the Root Cause”, JCDC, vol. 25, no. 1, pp. 129–146, Jul. 2020, doi: 10.21315/jcdc2020.25.1.7.