Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach
Main Article Content
Abstract
The technical performance requirements of projects posed a challenge to the sustainable development of small size local government projects particularly in developing countries. Studies in the past focused mainly on the performance of major foreign construction firms mostly owned and operated by expatriates. Very few researches however, have been conducted to assess the relationship between major cost factors affecting technical performance of small size local government projects. This study is aimed at assessing the relationship between major cost factors that affect technical performance of small size local government projects in Nigeria. Survey instruments were administered to major stakeholders in the construction industry comprising of project clients, contractors and consultants using proportionate stratified random sampling method. A Warp partial least square-structural equation modeling (PLS-SEM) software algorithm was used for the analysis of collected data. The software is one of the powerful software for data analysis and has an advantage of providing p values based on the structure of the research model. The study concluded that cash flow problem, fraudulent practice and nature of construction environment are the major factors affecting technical performance of local government projects in Nigeria and further recommended the use of mediator variables like pay for performance and advance payment policy to minimise such negative effects. Governments in developing countries should devise a good cash flow policy and impose stringent penalties against any party involved in fraudulent activity.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Addo, J.N. (2015). Delay and its effect on the delivery of construction projects in Ghana. African Journal of Applied Research (AJAR), 1(1): 236–246.
Agostini, L.C., Federico, F.R., Nosella, A.K.C. and Kalantaridis, C. (2015). Does patenting influence SME sales performance?: A quantity and quality analysis of patents in Northern Italy. European Journal of Innovation Management, 18(2): 238–257. doi: 10.1108/EJIM-07-2013-0071.
Akanni, P.O., Oke, A.E. and Akpomiemie, O.A. (2015). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1): 91–97. doi: 10.1016/j.hbrcj.2014.02.010.
Ali, A., Kamaruzzaman, S., Sulaiman, R. and Cheong, P.Y. (2010). Factors affecting housing maintenance cost in Malaysia. Journal of Facilities Management, 8(4): 285–298. doi: 10.1108/14725961011078990.
Amoah, P., Ahadzie, D.K. and Dansoh, A. (2011). The factors affecting construction performance in Ghana: The perspective of small-scale building contractors. The Ghana Surveyor, 4(1): 41–48.
Bagozzi, R.P. and Yi, Y. (1988). On the evaluation of structural equation models. Journal of the Academy of Marketing Science, 16(1): 74–94. doi: 10.1007/BF02723327.
Brown, J., Loosemore, M., Thomson, D. and Hartmann, T. (2015). Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(4): 372–389. doi: 10.1108/ECAM-03-2015-0034.
Chan, A.P.C. and Chan, A.P.L. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2): 203– 221.
Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences. 2nd Ed. New Jersey: Lawrence Earlbaum Associates Inc.
Doloi, H., Iyer, K.C. and Sawhney, A. (2011). Structural equation model for assessing impacts of contractor's performance on project success. International Journal of Project Management, 29(6): 687–695. doi: 10.1016/j.ijproman.2010.05.007.
Doloi, H., Sawhney, A., Iyer, K.C. and Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4): 479–489. doi: 10.1016/j.ijproman.2011.10.004.
Elger, D. (2008). Theory of performances. In Faculty Guidebook: A Comprehensive Tool for Improving Faculty Performance. Sunnyvale, CA: Pacific Crest, 11–14.
Elinwa, A.U. and Buba, S.A. (1993). Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4): 698–713. doi: 10.1061/(ASCE)0733-9364(1993)119:4(698).
Ezeh, M.E. (2013). Public procurement reform strategies: Achieving effective and sustainable outcomes. Paper presented at the CIPS Pan Africa Conference. National Theatre, Accra, Ghana, 21–22 May.
Field, A. (2009). Discovering Statistics Using SPSS. London: Sage Publications Ltd. Fornell, C. and Larcker, D.F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1): 39–50. doi: 10.2307/3151312.
Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study. International Journal of Project Management, 21(5): 321–326. doi: 10.1016/S0263-7863(02)00055-8.
Gambo, N. and Ilias, S. (2014). A conceptual framework for improving cost and building contractor performances in developing countries. Paper presented at the 7th International Real Estate Research Symposium (IRERS) 2014. National Institute of Valuation (INSPEN), Selangor, Malaysia, 29–30 April.
Giudici, P. (2003). Applied Data Mining Statistical Method for Business and Industry. London: John Wiley and Sons Ltd.
Hair, J.F., Sarstedt, M., Ringle, C.M. and Mena, J.A. (2012). An assessment of the use of partial least squares structural equation modeling in marketing research. Journal of the Academy of Marketing Science, 40(3): 414–433. doi: 10.1007/s11747-011-0261-6.
Hayes, A.F. (2009). Beyond Baron and Kenny: Statistical mediation analysis in the new millennium. Communication Monographs, 76(4): 408–420. doi: 10.1080/03637750903310360.
Haz?r, Ö., Haouari, M. and Erel, E. (2015). Robust optimization for the discrete timecost tradeoff problem with cost uncertainty. In Handbook on Project Management and Scheduling. Vol. 2. Cham, Switzerland: Springer, 865–874. doi: 10.1007/978-3-319-05915-0_9.
He, Q., Luo, L., Hu, Y. and Chan, A.P.C. (2015). Measuring the complexity of mega construction projects in China: A fuzzy analytic network process analysis. International Journal of Project Management, 33(3): 549–563. doi: 10.1016/j.ijproman.2014.07.009.
Hulland, J. (1999). Use of partial least squares (PLS) in strategic management research: A review of four recent studies. Strategic Management Journal, 20(2): 195–204. doi: 10.1002/(SICI)1097-0266(199902)20:23.0.CO;2-7.
Inuwa, I.I., Usman, N.D. and Dantong, J.S.D. (2015). The effects of unethical professional practice on construction projects performance in Nigeria. African Journal of Applied Research (AJAR), 1(1): 72–88.
Jafari, A. (2013). A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7): 746–760. doi: 10.1080/01446193.2013.825045.
Kshetri, N. (2015). Success of crowd-based online technology in fundraising: An institutional perspective. Journal of International Management, 21(2): 100– 116. doi: 10.1016/j.intman.2015.03.004.
Kurul, E., Zhou, L. and Keivani, R. (2013). Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3): 232–250. doi: 10.1108/JFMPC-08-2012-0032.
Liang, Y. and Gan, S. (2015). Empirical study on institutional investors, free cash flow and corporate performance. Paper presented at the 2015 International Conference on Education Technology, Management and Humanities Science (ETMHS 2015). Xian, Shaan, China, 21–22 March. Amsterdam: Atlantis Press. doi: 10.2991/etmhs-15.2015.61.
Local Government Monitoring and Evaluation Committee (LGMEC). (2009). Monitoring of local government projects. Bauchi, Nigeria: 2008–2009 Report. Bauchi, Nigeria: LGMEC.
Luu, V.T., Kim, S. and Huynh, T. (2008). Improving project management performance of large contractors using benchmarking approach. International Journal of Project Management, 26(7): 758–769. doi: 10.1016/j.ijproman.2007.10.002.
Mahesh, M.G. (2012). Study of the factors affecting labour productivity at a building construction projects in USA: Web survey. MSc diss. North Dakota State University of Agriculture and Applied Science.
Matthew, K., Patrick, K. and Denise, K. (2013). The effects of fraudulent procurement practices on public procurement performances. International Journal of Business and Behavioural Sciences, 3(1): 17–27.
Memon, A.H., Ismail, A.R., Ade Asmi, A.A. and Nor Hazana, A. (2013). Using structural equation modelling to assess effects of construction resource related factors on cost overrun. World Applied Sciences Journal, 21(5): 6–15. doi: 10.5829/idosi.wasj.2013.21.mae.9995.
Memon, A.H., Ismail, A.R., Mohd Razaki, A. and Ade Asmi, A.A. (2010). Factors affecting construction cost in Mara large construction project: Perspective of project management consultant. International Journal of Sustainable Construction Engineering and Technology, 1(2): 41–54.
Mohit, M.A., Ibrahim, M. and Rashid, Y.R. (2010). Assessment of residential satisfaction in newly designed public low-cost housing in Kuala Lumpur, Malaysia. Habitat International, 34(1): 18–27. doi: 10.1016/j.habitatint.2009.04.002.
Mortimer, D. and Mortimer, S.T. (2015). Quality and Risk Management in the IVF Laboratory. Cambridge: Cambridge University Press. doi: 10.1017/CBO9781139680936.
National Population Commission. (2000). Nigeria Demographic and Health Survey 1999. Calverton, MD: National Population Commission and ORC/Macro.
Ngacho, C. and Das, D. (2015). A performance evaluation framework of construction projects: Insights from literature. International Journal of Project Organisation and Management, 7(2): 151–173. doi: 10.1504/IJPOM.2015.069616.
Odeyinka, H.A., Lowe, J. and Kaka, A. (2008). An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1): 5–17. doi: 10.1108/13664380810882048.
Ogwueleka, A. (2011). The critical success factors influencing project performance in Nigeria. International Journal of Management Science and Engineering Management, 6(5): 343–349.
Oppenheim, A.N. (2000). Questionnaire Design, Interviewing and Attitude Measurement. New York: Continuum International Publishing Group.
Oslo and Paris Conventions for the Protection of Marine Environments (OSPAR) Commission. (2008). Background Document for the EcoQo on Plastic Particles in Stomach of Sea Birds. London: OSPAR Commission.
Oyewobi, L.O. and Ogunsemi, D.R. (2010). Factors influencing reworks occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1): 1–20.
Pallant, J. (2010). SPSS Survival Manual: A Step By Step Guide to Data Analysis Using SPSS. Berkshire, UK: Open University Press.
Qu, Y., Liu, Y., Nayak, R.R. and Li, M. (2015). Sustainable development of ecoindustrial parks in China: Effects of managers' environmental awareness on the relationships between practice and performance. Journal of Cleaner Production, 87: 328–338. doi: 10.1016/j.jclepro.2014.09.015.
Roldán, J.L. and Sánchez-Franco, M.J. (2012). Variance-based structural equation modeling: Guidelines for using partial least squares in information systems research. In M. Mora, O. Gelman, A. Steenkamp and M. Raisinghani (eds.). Research Methodologies, Innovations and Philosophies in Software Systems Engineering and Information Systems. Hershey, PA: Information Science Reference, 193–221. doi: 10.4018/978-1-4666-0179-6.ch010.
Russell, H. (2010). Cash Flow Problems in a Business. Available at: http://www.smallbusiness.chron.com/cash-flow-problems-business4916.html.
Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5): 517–526. doi: 10.1016/j.ijproman.2006.11.007.
Samuel, E.I. and Ovie, A.I. (2015). Iterating a stationary cause of cost overruns in construction projects. International Journal of Construction Engineering and Management, 4(2): 52–59.
Sekaran, U. and Bougie, R. (2011). Research Methods for Business: A Skill Building Approach. New Jersey: John Wiley and Sons Ltd.
Songer, A.D. and Molenaar, K.R. (1997). Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1): 34–40. doi: 10.1061/(ASCE)0733-9364(1997)123:1(34).
Stevens, C. and Fuentes-George, K. (2015). The Green Economy as an opportunity to improve US biodiversity assistance. In A. Gasparatos and K.J. Willis (eds.). Biodiversity in the Green Economy. Abingdon, UK: Routledge, 360.
Takim, R. and Akintoye, A. (2002). Performance indicators for successful construction project performance. In D. Greenwood (ed.). Proceedings: 18th Annual ARCOM Conference. Vol. 2. Newcastle, UK: Association of Researchers in Construction Management, 545–555. Team Leadership. (2010). The Five Levels of Teams: Where are You on the Team Curve? Part 3. 26 February. Available at: http://www.changingwinds. wordpress.com/2010/02/26/the-five-levels-of-teams-where-are-you-on-theteam-curve-part-three-of-a-series/.
Vilanova, M.R.N., Filho, P.M. and Balestieri, J.A.P. (2015). Performance measurement and indicators for water supply management: Review and international cases. Renewable and Sustainable Energy Reviews, 43: 1–12. doi: 10.1016/j.rser.2014.11.043.
Wasi, D. and Skitmore, M. (2001). Factors affecting the performance of small indigenous contractors in Papua New Guinea. Australasian Journal of Construction Economics and Building, 1(1): 80–90. doi: 10.5130/ajceb.v1i1.2282.
Winch, G.M. (2010). Managing Construction Projects. New Jersey: John Wiley and Sons Ltd.
Xiao, H. and Proverbs, D. (2002). The performance of contractors in Japan, the UK and the USA: An evaluation of construction quality. International Journal of Quality and Reliability Management, 19(6): 672–687. doi: 10.1108/02656710210429564.
Yasamis, F., Arditi, D. and Mohammadi, J. (2002). Assessing contractor quality performance. Construction Management and Economics, 20(3): 211–223. doi:10.1080/01446190110113693.