Published: 18-12-2023

Critical Delay Factors in Typical Physical Projects: The Case of the Ministry of Home Affairs in Malaysia

Aishatul Izwani Aminorlah, Noorlizawati Abd Rahim, Zainai Mohamed, Ain Naadia Mazlan

57–79

Applications and Challenges of Adopting the Internet of Things (IoT) in the Rwandan Construction Industry

Oluwaseun Sunday Dosumu, Constant Mahame, Simon Niyitegeka, Jean Aime Hahiirwuwambaza

81–100

Responsiveness of the Construction Sector to Fiscal Policy in Nigeria

Ademola Eyitope Ojo, Ditimi Ammasoma, Johnson Ojo Adelakun

121–137

Perspective of Construction Building Professionals on Low-Carbon Materials in Malaysia

Mohd Rohim Omar, Afizah Ayob, Mohd Hafiz Zakaria, Nur Soleha Abdul Rahim, Hamizah Mokhtar, Hafnidar A. Rani, Farahiyah Abdul Rahman

139–162