Cost Shares and Factor-Cost Ratios in Owner-Built Incremental Housing in Dar Es Salaam, Tanzania
Main Article Content
Abstract
The adoption of incremental owner-built techniques in housing construction relies on the associated lower cost compared to developer-built approaches. The mechanism that lowers cost is however, not obvious. This study is based on survey data that were collected using questionnaires which were distributed to 200 respondents in Dar es Salaam, Tanzania with response rate of 22.5%. The analysis results, based on descriptive statistics and regression analysis indicate that an incremental house-builder targeting an additional bedroom incrementally spends 28% lower annual construction cost and each additional square meter built, is associated with 0.4% lower cost. However, such lower cost comes at a 5%–10% longer completion time. These observations suggest that spreading costs over time reduces construction cost through multiple cost-saving channels opened up by time itself and factor intensity. The intensity of incremental housing construction favours increasing expenditure on labour than capital yielding a 5% reduction in annual cost but the greatest cost reduction benefit of up to 26% is realised through increasing expenditure on "capital" with fixed spending on materials during construction.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abdul Aziz, A.R. (2012). Control mechanisms exercised in Malaysian housing public private partnerships. Construction Management and Economics, 30(1): 37– 55. doi: 10.1080/01446193.2011.654129.
Abdul Rashid, K. (2007). Private Finance Initiative (PFI): Concept and Method of Procurement for Construction Projects with Specific Reference to Malaysia. Kuala Lumpur: International Islamic University Malaysia.
Abdullah, N., Sufian, A., Asenova, D. and Bailey, S.J. (2012). PPP/PFI in Malaysian development plans: Purpose, structure, implementation, financing and risk transfer. Journal of Risk and Governance, 3(2): 69.
Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1): 77–89. doi: 10.1080/014461900370979.
Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1): 25–35. doi: 10.1016/j.ijproman.2004.04.006.
Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E. and Asenova, D. (2003). Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5): 461–470. doi: 10.1080/0144619032000087285.
Asian Development Bank (ADB). (2008). Public-Private Partnership Handbook. September. Manila: ADB.
Bartlett, M.S. (1954). A note on the multiplying factors for various chi square approximations. Journal of the Royal Statistical Society, 16(Series B): 296–298.
Booth, K. and Skilling, H. (2007). Structuring a PPP: Selecting the Option. Manila: ADB. Available at: http://www.adb.org/sites/default/files/institutionaldocument/31484/public-private-partnership.pdf [Accessed on 12 August 2013].
Bourne, L. (2005). Project relationship management and the stakeholder circle. PhD diss. RMIT University.
Brinkerhoff, D.W. and Brinkerhoff, J.M. (2011). Public–private partnerships: Perspectives on purposes, publicness and good governance. Public Administration and Development, 31(1): 2–14. doi: 10.1002/pad.584.
Brown, T. and Potoski, M. (2003). Managing contract performance: A transaction cost approach. Journal of Policy Analysis and Management, 22(2): 275–297. doi: 10.1177/1530957603026004003.
Canadian Council for PPP. (2001). 100 Projects: Selected Public–Private Partnerships. Ottawa: Canadian Council for PPP.
Cates, T., Overby, J., Robbins, S.P. and Coulter, M. (2002). Management: Test Item File 2. Upper Saddle River, NJ: Prentice Hall.
Chowdhury, A.B.U., Orr, R.J. and Settel, D. (2009). Multilaterals and infrastructure funds: A new era. Journal of Structured Finance, 14(4): 68–74. doi: 10.3905/JSF.2009.14.4.068.
Chowdhury, A.N., Chen, P.H. and Tiong, R.L. (2011). Analysing the structure of public–private partnership projects using network theory. Construction Management and Economics, 29(3): 247–260. doi: 10.1080/01446193.2010.537354.
Devkar, G.A. and Kalidindi, S.N. (2013). External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1): 58–73. doi: 10.1108/BEPAM-05-2012-0023.
Economic Planning Unit (EPU). (2006). Ninth Malaysia Plan (2006–2010). Putrajaya: EPU. Available at: http://www.epu.jpm.my/rm9/html/english.htm [Accessed on 12 April 2012].
El-Gohary, N.M., Osman, H. and El-Diraby, T.E. (2006). Stakeholder management for public private partnerships. International Journal of Project Management, 24(7): 595–604. doi: 10.1016/j.ijproman.2006.07.009.
Gomez, C.P. and Gambo, M.M. (2013). Structuring best value delivery process of PPP infrastructure projects in Malaysia. The Construction, Building and Real Estate Research Conference of the Royal Institute of Chartered Surveyors. New Delhi: Royal Institute of Chartered Surveyors.
Gunawasa, A. (2012). Public private partnerships for major infrastructure projects in developing countries. In G. Ofori (ed.). Contemporary Issues in Construction in Developing Countries. London: Spon Press.
Harris, S. (2003). Public Private Partnerships: Delivering Better Infrastructure Services. Washington DC: Inter-American Development Bank. Available at: http://www.alide.org/DataBank2007/RecInformation/2APP_Infraestructure/41PublicPPharrisBID.pdf [Accessed on 10 March 2013].
HM Treasury. (2006). Value for Money Assessment Guidance. London: HM Treasury.
Huang, T., Shen, L.Y., Yam, C.H. and Zhao, Z.Y. (2005). An analysis to the existing practice of managing government-invested project in China. Construction Economics: 16–20.
Ismail, K., Takim, R. and Nawawi, A.H. (2011). The evaluation criteria of value for money (VfM) of public private partnership (PPP) bids. International Conference on Intelligent Building and Management. Singapore: IACSIT Press, 349–355.
Ismail, S. and Pendlebury, M. (2006). The private finance initiative (PFI) in schools: The experiences. Financial Accountability and Management, 22(4): 381– 404. doi: 10.1111/j.1468-0408.2006.00431.x.
Koch, C. and Buser, M. (2006). Emerging metagovernance as an institutional framework for public private partnership networks in Denmark. International Journal of Project Management, 24(7): 548–556. doi:10.1016/j.ijproman.2006.07.001.
Li, B., Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005). Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5): 459–471. doi:10.1080/01446190500041537.
Mathur, V.N., Price, A.D. and Austin, S. (2008). Conceptualizing stakeholder engagement in the context of sustainability and its assessment. Construction Management and Economics, 26(6): 601–609. doi: 10.1080/01446190802061233.
Mistarih, A., Al Refai, M., Al Qaid, B. and Qeed, M. (2012). Competency requirements for managing public private partnerships. International Journal of Business Management, 7(12): 60–73.
Mizrachi, Y. and Ben-Attar, D. (2011). "Downtown" and "suburbia" public-private partnerships (PPP) in the application of information and communication technologies for development (ICT4D). In H.S. Desivilya (ed.). The Paradox in Partnership: The Role of Conflict in Partnership Building. Sharjah, UAE: Bentham Science Publishers Ltd.
Neely, A. (1999). The performance measurement revolution: Why now and what next? International Journal of Operations and Production Management, 19(2): 205–228. doi: 10.1108/01443579910247437.
Norusis, M.J. (1992). SPSS for Windows: Base System User's Guide. New York: SPSS Incorporated.
Pallant, J. (2010). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS. Berkshire, UK: McGraw-Hill International.
Peterson, T.O. and Van Fleet, D.D. (2004). The ongoing legacy of RL Katz: An updated typology of management skills. Management Decision, 42(10): 1297–1308. doi: 10.1108/00251740410568980.
PFI Report. (2002). Super Contractors for Super Hospitals. London: National Audit Office.
Quium, A. (2011). A Guidebook on Public-Private Partnership in Infrastructure. Bangkok: United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP).
Robinson, H.S. and Scott, J. (2009). Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2):181–197. doi: 10.1080/01446190802614163.
Rosenau, P.V. (ed.). (2000). Public-Private Policy Partnerships. Cambridge, US: MIT Press.
Royal Institution of Chartered Surveyors (RICS) Project Management Forum. (2003). PFI and the Skills of a Manager. London: RICS.
Salleh, D. and Siong, H.C. (2008). The involvement of private sector in local infrastructure development in Malaysia. Jurnal Alam Bina, 11(2): 74–100.
Shaoul, J. (2002). New developments: A financial appraisal of the London underground public-private partnership. Public Money and Management, 22(2): 53–60. doi: 10.1111/1467-9302.00308.
Takim, R., Ismail, K., Nawawi, A.H. and Jaafar, A. (2009). The Malaysian private finance initiative and value for money. Asian Social Science, 5(3): 103–111. doi: 10.5539/ass.v5n3p103.
Turner, J.R. (2004). Farsighted project contract management: Incomplete in its entirety. Construction Management and Economics, 22(1): 75–83. doi: 10.1080/0144619042000186077.
Unit Kerjasama Awam Swasta (UKAS). (2009). Garis Panduan Kerjasama Awam Swasta (Guideline on PPP). Putrajaya, Malaysia: UKAS. Available at: http://www.ukas.gov.my/c/document_library/get_file?uuid=02f1ea81-8075-4387-8b69-ebb2120292f1&groupId=15223 [Accessed on 15 September 2012].
Walker, C.T. (1995). Privatized Infrastructure: The Build Operate Transfer Approach. London: Thomas Telford. doi: 10.1680/pitba.20535.
Whetten, D. (2005). Developing Managerial Skills. Chennai, India: Pearson Education India.
Woodhouse, E. (2006). IPP study case selection and project outcomes: An additional note. Working Paper: Program on Energy and Sustainable Development at the Center for Environmental Science and Policy. Stanford, CA: Stanford University. Available at: http://pesd.fsi.stanford.edu/sites/default/files/IPP_Study_-_Country_and_Project_Annex.pdf [Accessed on 20 November 2014].
Zhang, X. (2005). Critical success factors for public–private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1): 3–14. doi: 10.1061/(ASCE)0733-9364(2005)131:1(3).