The Case for a Construction Industry Council in Ghana
Main Article Content
Abstract
The Ghanaian construction industry faces major problems that undermine its potential and contribution to overall national development. There is a general acceptance of the need to develop structures and improve regulations within the Ghanaian construction industry. However, the fragmentation of stakeholders has resulted in the absence of a clear agenda within the industry to address apparent problems that affect performance within the industry. Whilst there have been previous initiatives to help deliver industry-wide improvements in the Ghanaian construction industry, they have not received direct sustained attention from a single organisation with broad stakeholder participation. This undermines progress in the efforts to improve the overall environment and performance in the industry. This paper explores the development of a multi-stakeholder representative body for the Ghanaian construction industry to provide leadership in the pursuit of reform in the Ghanaian construction industry. The literature on developments within the global construction industry and industry initiatives to improve performance have been reviewed. This provides new pathways to ongoing efforts to achieve industry-wide regulation. It has been recognised in this paper that the ultimate objective towards the attainment of industrywide improvements in the Ghanaian construction industry remains the establishment of an Industry Development Agency.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abd El-Razek, M.E., Bassioni, H.A. and Mobarak, A.M. (2008). Causes of delays in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11): 831–841. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831).
Adams, F.K. (2008). Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in developing countries. International Journal of Project Management, 26(2): 138–148. http://dx.doi.org/10.1016/j.ijproman.2007.05.007.
Ahadzie, D.K. (2009). The Case for a Construction Industry Development Agency for Ghana. Available at: www.ghanaweb.com [Accessed on 20 October 2009].
Ahadzie, D.K. (2007). A model for predicting the performance of project managers in mass housing building projects in Ghana. PhD diss. University of Wolverhampton.
Ahmed, S.M., Azhar, S., Kappagntula, P. and Gollapudil, D. (2003). Delays in construction: A brief study of Florida construction industry. Proceedings of the 39th Annual ASC Conference. Clemson University, Clemson, South Carolina, 10–12 April, 257–266.
Alaghbari, W., Kadir, M.R.A., Salim, A. and Ernawati (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2): 192–206. http://dx.doi.org/10.1108/09699980710731308.
Ankomah, B., Boakye, N.A. and Fugar, F. (2010). Safety on construction sites: The role of the employer and employee. Proceedings of the West Africa Built Environment Research (WABER) Conference. Reading, UK: University of Reading, 477–498.
Assaf, S.A. and AlHejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4): 349–357. http://dx.doi.org/10.1016/j.ijproman.2005.11.010.
Badu, E., Edwards, P. and Owusu-Manu, D. (2012). Trade credit and supply chain delivery in the Ghanaian construction industry: Analysis of vendor interactions with small to medium enterprises. Journal of Engineering, Design and Technology, 10(3): 360–379. http://dx.doi.org/10.1108/17260531211274729.
Badu, E. and Owusu-Manu, D. (2010). Improving Access to construction finance in Ghana: Empirical descriptions of constraints and antidotes. Journal of Business and Enterprise Development, 2(1): 111–129.
Badu, E., Owusu-Manu, D., Edwards, D.J. and Holt, G.D. (2011). Innovative financing (IF) of infrastructure projects delivery in Ghana: Conceptual and empirical observations. Engineering Project Organization Journal, 2(2): 1–14.
Chileshe, N. and Yirenkyi-Fianko, A.B. (2012). An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3): 306–329. http://dx.doi.org/10.1108/17260531211274693.
Constructing Excellence. (2011). Construction KPIs 2011. London: Constructing Excellence . Available at: www.constructingexcellence.org.uk [Accessed on 30 December 2011].
Construction Industry Council (CIC). (2014). Homepage. Available at: www.cic.org.uk [Accessed on 7 January 2015].
Construction Task Force. (1998). Rethinking Construction. London: UK Department of Trade and Industry.
Crosthwaite, D. (2000). The global construction market: A cross-sectional analysis. Construction Management and Economics, 18(5): 619–627. https://doi.org/10.1080/014461900407428.
Daabu, A.M. (2012). Contracts for Oil Infrastructure Awarded. Accra, Ghana: myjoyonline.com. Available at: www.myjoyonline.com [Accessed on 7 August 2012].
Dansoh, A. (2005). Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(2): 163–168. http://dx.doi.org/10.1080/0144619042000241435.
Department for Business, Innovation and Skills (DBIS). (2009). The 2009 Value Added Scoreboard. London: DBIS.
Department of Environment Transport and the Regions (DETR). (1998). Rethinking Construction. London: DETR.
Department of Finance and Personnel Northern Ireland (DFPNI). (2007). Northern Ireland Guide to Expenditure Appraisal and Evaluation. Belfast, Northern Ireland: DFPNI. Available at: www.eag.dfpni.org.uk [Accessed on 20 October 2007].
Dogbegah, R. Owusu-Manu, D. and Omoteso, K. (2011). A principal component analysis of project management competencies for the Ghanaian construction industry. Australian Journal of Construction Economics and Building, 11(1): 26–40. http://dx.doi.org/10.5130/ajceb.v11i1.1680.
Donkor-Hyiaman, K.A. (2014). Towards establishing the "construction industry development authority" in Ghana. Modern Ghana, 18 July. Available at: https://www.modernghana.com/news/557132/towards-establishing-theconstruction-industry-development.html [Accessed on 28 October 2015].
Duke, S. (2011). Lenders face loss on loans to property. Daily Mail, 18 March, 31.
Frimpong, Y. and Oluwoye, J. (2003). Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 1(2): 175–187. http://dx.doi.org/10.1142/S1609945103000418.
Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). Causes of delay and cost overruns in construction of ground water projects in developing countries: Ghana as a case study. International Journal of Project Management, 21(1): 321–326. http://dx.doi.org/10.1016/S0263-7863(02)00055-8.
Fugar, F.D.K. and Agyakwah-Baah, A.B. (2010). Delays in building construction projects in Ghana. Australian Journal of Construction Economics and Building, 10(1&2): 103–116. http://dx.doi.org/10.5130/ajceb.v10i1/2.1592.
Ghana Investment Promotion Centre (GIPC). (2012). Top 100 Companies in Ghana 2011. Accra, Ghana: GIPC. Available at: www.gipcghana.com [Accessed on 20 June 2012].
Ghana News Agency (GNA). (2012). Construction of Oil Infrastructure to Begin. Accra, Ghana: GNA. Available at: www.ghananewsagency.org [Accessed on 7 August 2012].
Ghana Stock Exchange (GSE). (2012). Listed Firms on the Ghana Stock Exchange. Accra, Ghana: GSE. Available at: www.gse.com.gh [Accessed on 20 May 2012]. Green Building Index (GBI). (2012). Homepage. Available at: www.greenbuildingindex.org [Accessed on 15 November 2012].
Hong Kong Construction Industry Council (HKCIC). (2012). Homepage. Available at: www.hkcic.org [Accessed on 15 November 2012].
International Federation of Consulting Engineers (FIDIC). (2006). Quality of Construction. Geneva: FIDIC. Available at: www.fidic.org [Accessed on 30 August 2006].
Kpamma, Z. and Adjei-Kumi, T. (2010). The Lean Project Delivery System (LPDS): Application at the design and documentation stage for construction projects in Ghana. Proceedings of the West Africa Built Environment Research (WABER) Conference. Reading, UK: University of Reading, 597–604.
Laryea, S. (2010). Challenges and opportunities facing contractors in Ghana. Proceedings of the West Africa Built Environment Research (WABER) Conference Ghana. Reading, UK: University of Reading, 215–226.
Latham, M.S. (1994). Constructing the Team. London: Her Majesty's Stationery Office (HMSO).
Martell, C. and Guess, G.M. (2006). Development of local government debt financing markets: Application of a market-based framework. Public Budgeting and Finance, 26(1): 88–119. http://dx.doi.org/10.1111/j.1540-5850.2006.00840.x.
Kumaraswamy, M.M. (2006). Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1): 73–94.
Murray, M. and Langford, D., eds. (2003). Construction Reports 1944–98. Oxford: Blackwell Science Ltd.
National Audit Office. (2001). Modernising Construction. London: The Stationery Office.
Office for National Statistics (ONS). (2010). Construction Statistics Annual 2010. Newport, South Wales: ONS. Available at: http://www.statistics.gov.uk/downloads/theme_commerce/CSA-2010/Opening.pdf [Accessed on 18 November 2010].
Ofori, G. (2012). Developing the Construction Industry in Ghana: The Case for a Central Agency. Singapore: National University of Singapore.
Ofori, G. (1993). Managing Construction Industry Development: Lessons from Singapore's Experience. Singapore: National University of Singapore Press.
Ofori, G., Ai Lin, E. and Tjandra, I. (2012). Construction industry development initiatives: Lessons for Ghana from overseas. International Conference on Infrastructure and Development. Kumasi, Ghana: College of Architecture and Planning, Kwame Nkrumah University of Science and Technology, 12– 17.
Ofori, G. and Toor, S. (2012). Leadership and construction industry development in developing countries. Journal of Construction in Developing Countries, 17(Supp. 1): 1–21.
Ofori-Kuragu, J.K. (2013). Enabling world-class performance in Ghanaian contractors: A framework for benchmarking. PhD diss. Kwame Nkrumah University of Science and Technology.
Ofori-Kuragu, J.K., Baiden, B. and Badu, E. (2014). Factors affecting Ghanaian contractor performance. Proceedings for the CIB W107 2014 International Conference. Lagos, Nigeria: International Council for Research and Innovation in Building and Construction, 275–285.
Osam, I.E. (2012). Danger on Construction Site. Available at: www.citifmonline.com [Accessed on 28 February 2012].
Owusu-Manu, D. and Badu, E. (2011). Capital Structure, Investment Strategy And Financial Decisions: The Perspective of Large Construction Enterprises in Developing Countries. Saarbrücken, Germany: Lambert Academic Publishing.
Parliament of Ghana. (2015). Engineering Council Bill 2010. Available at: http://www.parliament.gh/assets/file/Bills/Engineering%20Council%20Bill,%202010.pdf [Accessed on 12 October 2015].
Platz, D. (2009). Infrastructure finance in developing countries: The potential of subsovereign bonds. DESA Working Paper No. 76ST/ESA/2009/DWP/76, July. New York: Department of Economic and Social Affairs (DESA), United Nations. Available at: http://www.un.org/esa/desa/papers/2009/wp76_2009.pdf [Accessed on February 2011].
Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5): 517–526. http://dx.doi.org/10.1016/j.ijproman.2006.11.007.
School of Construction and Property Management (SCPM). (2011). Homepage. Available at: www.revaluingconstruction.scpm.salford.ac.uk/ [Accessed on 4 November 2011].
Singapore Institute of Building (SIB). (2012). Homepage. Available at: http://www.sib.com.sg/site [Accessed on 14 November 2012].
Tawiah, O. (1999). Factors affecting the performance of Ghanaian owned construction firms. MSc diss. Kwame Nkrumah University of Science and Technology.
Vulink, M. (2004). Technology transfer in the construction industry of Ghana. MSc diss. Technische Universiteit Eindhoven.