A Dynamic Model of Contractor-Induced Delays in India

Main Article Content

Dillip Kumar Das
Fidelis Emuze

Abstract

To understand delays in the Indian construction context, an exploratory survey was conducted as a precursor to the development of simulation models. System Dynamics (SD) was used to visualise the pivotal feedback relations that cause delays to evolve mechanisms that reduce it. A community development construction project in India serves as the case for modelling. Findings of the study suggest that definite causal feedback relations exist among difficulties in financing the project, ineffective planning and scheduling, poor communication and coordination by the contractor, conflict between the contractor and other stakeholders and use of inappropriate construction methods and construction delays. However, the modelling efforts reveal that the use of these best practices can reduce delay significantly: provision of adequate project finances and cash flow, effective planning and scheduling, adoption of appropriate construction methods and contingencies for rework in the schedule.

Article Details

How to Cite
Dillip Kumar Das, and Fidelis Emuze. 2017. “A Dynamic Model of Contractor-Induced Delays in India”. Journal of Construction in Developing Countries 22 (1): 21–39. https://doi.org/10.21315/jcdc2017.22.1.2.
Section
Articles

References

Ahsan, M.K. and Gunawan, I. (2010). Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28(1): 68–78. https://doi.org/10.1016/j.ijproman.2009.03.005.

Aibinu, A.A. and Odeyinka, H.A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7): 667–677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667).

Alaghbari, W., Razali, M., Kadir, S. and Ernawat, G. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2): 192–206. https://doi.org/10.1108/09699980710731308.

Al-Khalil, M. and Al-Ghafly, M. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5): 647–655. https://doi.org/10.1080/014461999371259.

Al-Kharashi, A. and Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1): 3–23. https://doi.org/10.1080/01446190802541457.

Assaf, S.A. and Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010.

Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995). Causes of delay in large building construction projects. ASCE Journal of Management in Engineering, 11(2): 45–50. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45).

Aswathi, R. and Thomas, C. (2013). Development of a delay analysis system for a railway construction project. International Journal of Innovative Research in Science, Engineering and Technology, 2(1): 531–541.

BIS (Bureau of Indian Standards). (2013). Indian Standard Construction Project Management- Guidelines: IS 15883 (Part 2 Time Management). New Delhi: Bureau of Indian Standards, 1–28.

Braimah, N. (2013). Construction delay analysis techniques: A review of application issues and improvement needs. Buildings, 3(3): 506–531. https://doi.org/10.3390/buildings3030506.

Chan, D.W. and Kumaraswamy, M.M.A. (1997). Comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7.

Day, J. and Bobeva, M. (2005). A generic toolkit for the successful management of Delphi studies. The Electronic Journal of Business Research Methodology, 3(2): 103–116.

Desai, M. and Bhatt, R. (2013). Critical causes of delay in residential construction projects: Case study of Central Gujarat Region of India. International Journal of Engineering Trends and Technology (IJETT), 4(4): 762–768.

Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12): 1245–1263. https://doi.org/10.1080/01446190903394541.

Doloi, H., Sawhney, A. and Iyer, K.C. (2012). Structural equation model for investigating factors affecting delay in Indian construction projects. Construction Management and Economics, 30(10): 869–884. https://doi.org/10.1080/01446193.2012.717705.

Doloi, H., Sawhney, A., Iyer, K.C. and Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4): 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.

Donohoe, H.M. and Needham, R.D. (2009). Moving best practice forward: Delphi characteristics, advantages, potential problems and solutions. International Journal of Tourism Research, 11(5): 415–437. https://doi.org/10.1002/jtr.709.

El-Razek, A.M.E., Bassioni, H.A. and Mobarak, A.M. (2008). Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11): 831–841. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831).

Han, S., Love, P.E.D. and Feniosky, P. (2013). A system dynamics model for assessing the impacts of design errors in construction projects. Mathematical and Computer Modelling, 57(9–10): 2044–2053. https://doi.org/10.1016/j.mcm.2011.06.039.

Hwang, B.G. and Leong, L.P. (2013). Comparison of schedule delay and causal factors between traditional and green construction projects. Technological and Economic Development of Economy, 19(2): 310–330. https://doi.org/10.3846/20294913.2013.798596.

Hwang, B.G. and Yang, S. (2014). Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2): 190–205. https://doi.org/10.1108/ECAM10-2012-0101.

Hwang, B.G., Zhao, X. and Tan, L.L.G. (2015). Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(3): 327–346. https://doi.org/10.1108/ECAM-07-2014-0095.

Lo, T.Y., Fung, I.W.H. and Tung, K.C.F. (2006). Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6): 636–649. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636).

Lyneis, J.M. and Ford, D.N. (2007). System dynamics applied to project management. System Dynamics Review, 23(1): 157–189. https://doi.org/10.1002/sdr.377.

Ndekugri, I., Braimah, N. and Gameson, R. (2008). Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9): 692–700. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(692).

Odeh, A.M. and Battaineh, H.T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1): 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.

Olawale, Y.A. and Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5): 509–526. https://doi.org/10.1080/01446191003674519.

Paleneeswaran, E. and Kumaraswamy, M. (2008). An integrated decision support system for dealing with time extention entitlements. Automation in Construction, 17(4): 425–438. https://doi.org/10.1016/j.autcon.2007.08.002.

Pandey, M.K., Dandotiya, A., Trivedi, M.K., Bhadoriya, S.S. and Ramasesh, G.R. (2012). Delay computation using fuzzy logic approach. International Journal of Intelligent Systems and Applications, 11(1): 84–90.

Pandza, K. (2008). Delphi method. In R. Thorpe and R. Holt (eds.). The SAGE Dictionary of Qualitative Management Research. London: Sage Publications.

Pongpeng, J. and Liston, J. (2003). Contractor ability criteria: A view from the Thai construction industry. Construction Management and Economics, 21(3): 267–282. https://doi.org/10.1080/0144619032000049647.

Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5): 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.

Satyanarayana, K.N. and Iyer, K.C. (1996). Evaluation of delays in Indian construction contracts. Journal of the Institution of Engineers (India), 77: 14–22.

Semple, C., Hartman, F. and Jergeas, G. (1994). Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4): 785–795. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785).

Sterman, J. (2000). Business Dynamics: Systems Thinking and Modelling for a Complex World. Boston: McGraw-Hill, 982.

Stumpf , G. (2000). Schedule delay analysis. Cost Engineering Journal, 42(7): 32–43.

Terry, W. (2003). Assessing extension of time delays on major projects. International Journal of Project Management, 21(1): 19–26. https://doi.org/10.1016/S0263-7863(01)00060-6.