Causes of Discrepancies between Design and Construction in the Pakistan Construction Industry

Main Article Content

Rafiq Muhammad Choudhry
Hamza Farooq Gabriel
Mustafa Kamal Khan
Salman Azhar

Abstract

In building construction, discrepancies frequently occur between design and construction in relation to architectural details, structural details, materials, and quality of construction. The objective of this paper is to identify the major causes of discrepancies in building construction. A questionnaire was utilised that contained 65 potential causes of discrepancies classified into 4 categories: design, tendering, construction, and overall project. The data was from Pakistan and the response rate was excellent (80.6%). The collected data was analysed and important causes of discrepancies were identified. The results indicate that the provision of incomplete data to designers, lack of interest by approving authorities to carefully check the design, and owner-proposed changes due to financial problems are the top three causes of discrepancies. Insights and discussion are included in the paper. This work provides a basis to minimise discrepancies in the construction industry and help reduce rework, delays, and defects in construction.

Article Details

How to Cite
Rafiq Muhammad Choudhry, Hamza Farooq Gabriel, Mustafa Kamal Khan, and Salman Azhar. 2017. “Causes of Discrepancies Between Design and Construction in the Pakistan Construction Industry”. Journal of Construction in Developing Countries 22 (2): 1-18. https://doi.org/10.21315/Jcdc2016.22.2.1.
Section
Articles

References

Alarcón, L.F. and Mardones, D.A. (1998). Improving the design-construction interface. 6th Annual Conference of the International Group for Lean Construction. Guarujá, Brazil, 13–15 August 1998. Available at: http://www.iglc.net/Papers/Details/34 [Accessed on 12 February 2015].

Al-Hammad, A.M. (2000). Common interface problems among various construction parties. Journal of Performance of Constructed Facilities, 14(2): 71–74. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(71)

Alnuaimi, A.S., Taha, R.A., Al-Mohsin, M. and Al-Harthi, A.S. (2010). Causes, effects and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5): 615–622. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000154

Andi and Minato, T. (2003). Design documents quality in the Japanese construction industry: Factors influencing and impacts on construction process. International Journal of Project Management, 21(7): 537–546. https://doi.org/10.1016/S0263-7863(02)00083-2

Arain, F.M. and Pheng, L.S. (2005). How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3): 181–196. https://doi.org/10.1080/17452007.2005.9684592

Arain, F.M., Pheng, L.S. and Assaf, S.A. (2006). Contractors' views of the potential causes of inconsistencies between design and construction in Saudi Arabia. Journal of Performance of Constructed Facilities, 20(1): 74–83. https://doi.org/10.1061/(ASCE)0887-3828(2006)20:1(74)

Assaf, S.A. and Al-Hammad, A.M. (1988). The effect of economic changes on construction cost. Transactions of the American Association of Cost Engineers. Morgantown, West Virginia: American Association of Cost Engineers, 63–67. Available at: http://search.proquest.com/openview/d6e91366a767cd389143e5db8090a7a1/1?pq-origsite=gscholar&cbl=27161 [Accessed on 12 February 2015].

Assaf, S.A., Al-Hammad, A.M. and Al-Shihah, M. (1996). Effects of faulty design and construction on building maintenance. Journal of Performance of Constructed Facilities, 10(4): 171–174. https://doi.org/10.1061/(ASCE)0887-3828(1996)10:4(171)

Chan, D.W.M. and Kumaraswamy, M.M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7

Clough, R.H., Sears, G.A. and Sears, S.K. (2015). Construction contracting: A practical guide to company management, 8th Ed. New York: John Wiley & Sons Inc.

Grau, D., Back, W.E., and Prince, J.R. (2012). Benefits of on-site design to project performance measures. Journal of Management in Engineering, 28(3): 232– 242. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000097

Han, S., Lee, S. and Peña-Mora, F. (2012). Identification and quantification of nonvalue-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1): 98– 109. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000406

Han, S., Love, P. and Peña-Mora, F. (2013). A system dynamics model for assessing the impact of design error in construction projects. Mathematical and Computer Modelling, 57(9–10): 2044–2053. https://doi.org/10.1016/j.mcm.2011.06.039

Hauck, G. (1983). Hyatt-Regency walkway collapse: Design alternates. Journal of Structural Engineering, 109(5): 1226–1234. https://doi.org/10.1061/(ASCE)0733-9445(1983)109:5(1226)

Hinton, P.R., Brownlow, C., McMurray, I. and Cozens, B. (2004). SPSS explained. New York: Routledge.

Kish, L. (1995). Survey sampling, 65th Ed. New York: John Wiley and Sons Inc.

Kong, A.T. and Gray, J.M. (2006). Problems with traditional procurement in the Malaysian construction industry – A survey. In G. Runeson and R. Best (eds.). Proceedings of Australasian Universities Building Educators Association Annual Conference. University of Technology, Sydney, 12–14 July, 1–21.

Lee, S., Peña-Mora, F. and Park, M. (2006a). Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5): 452–464. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(452)

Lee, S., Peña-Mora, F. and Park, M. (2006b). Web-enabled system dynamics model for error and change management on concurrent design and construction projects. Journal of Computing in Civil Engineering, 20(4): 290–300. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:4(290)

Leech, N.L., Barrett, K.C. and Morgan, G.A. (2005). SPSS for intermediate statistics: Use and interpretation, 2nd Ed. Mahwah, New Jersey: Lawrence Erlbaum Associates Inc.

Lopez, R. and Love, P. (2012). Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5): 585–593. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000454

Lopez, R., Love, P., Edwards, D. and Davis, P. (2010). Design error classification, causation, and prevention in construction engineering. Journal of Performance of Constructed Facilities, 24(4): 399–408. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000116

Love, P., Edwards, D., Irani, Z. and Walker, D. (2009). Project pathogens: The anatomy of omission errors in construction and resource engineering project. IEEE Transactions on Engineering Management, 56(3): 425–435. https://doi.org/10.1109/TEM.2008.927774

Mendelsohn, R. (1997). The constructability review process: A constructor's perspective. Journal of Management in Engineering, 13(3): 17–19. https://doi.org/10.1061/(ASCE)0742-597X(1997)13:3(17)

Ministry of Finance (MOF). (2015). Pakistan Economic Survey 2014-15. Islamabad: Ministry of Finance, Government of Pakistan. Available at: http://www.finance.gov.pk/survey_1415.html [Accessed on 9 November 2015].

Mohamad, M.I., Nekooie, M.A. and Al-Harthy, A.B.S. (2012). Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2): 23–44.

Mohammed, N., Che Ani, A.I., Rakmat, R.A.O.K. and Yusof, M.A. (2010). Investigation on the causes of variation orders in the construction of building project – A study in the state of Selangor, Malaysia. Journal of Building Performance, 1(1): 73–82.

Okpala, D.C., and Aniekwu, A.N. (1988). Causes of high costs of construction in Nigeria. Journal Construction Engineering and Management, 114(2): 233– 244. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:2(233)

Oyewobi, L.O., Ibironke, O.T., Ganiyu, B.O. and Ola-Awo, A.W. (2011). Evaluating rework cost – A study of selected building projects in Niger State, Nigeria. Journal of Geography and Regional Planning, 4(3): 147–151.

Pakistan Engineering Council (PEC). (2014). Contractors/Firms. Available at: http:// www.pec.org.pk/ [Accessed on 8 January 2014].

Sun, M. and Meng, X. (2009). Taxonomy for change causes and effects in construction projects. International Journal of Project Management, 27(6): 560–572. https://doi.org/10.1016/j.ijproman.2008.10.005

Tenah, K.A. (2001). Project delivery systems for construction: An overview. Cost Engineering, 43(1): 30–36.

Thomas, H.R., Horman, M.J., De Souza, U.E.L. and Zav?ski, I. (2002). Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2): 144–154. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(144)

Tribelsky, E. and Sacks, R. (2010). Measuring information flow in the detailed design of construction projects. Research in Engineering Design, 21(3): 189–206. https://doi.org/10.1007/s00163-009-0084-3

Wang, T., Tang, W., Qi, D., Shen, W. and Huang, M. (2016). Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001082

Wang, Y. (2000). Coordination issues in Chinese large building projects. Journal of Management in Engineering, 16(6): 54–61. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:6(54)

Wantanakorn, D., Mawdesley, M. and Askew, W. (1999). Management errors in construction. Engineering, Construction and Architectural Management, 6(2): 112–120. https://doi.org/10.1108/eb021104