Mediating Effects of Enforcement on Public Procurement Guidelines' Compliance Barriers and Cost Performance of Construction Projects in Nigerian Federal Universities: A Process Macro Approach

Main Article Content

Abdullahi Nafiu Zadawa
Abdul Aziz Hussin
Atasya Osmadi

Abstract

"Mediation analysis" is considered as an important research concept in constructionresearch clusters. In this study, we tested the mediation effects' of enforcement as a compliance mechanism on influencing projects' award considered as public procurement guidelines' (PPGs) compliance barriers that affect the cost performance of construction projects. Compliance with PPGs provided within the context of the Public Procurement Act (PPA) 2007 in Nigeria has been a subject of debate. Data for this study was collected from the procurement stakeholders and construction project parties of nine randomly selected Nigerian federal universities using survey questionnaires. They included project clients, contractors registered with the procurement entities, project management consultants and professional consultants selected using the stratified proportionate random sampling method. The data collected was analysed and tested for mediation effects with Process Macro. The results obtained indicated that enforcement as a compliance mechanism has mediated the large negative effects of influencing project award as PPGs' compliance barriers that affects construction project cost performance. Thus, the study concluded that influencing projects award were identified as one of the major PPGs' compliance barriers affecting the cost performance of construction projects in Nigeria. In addition, enforcement was tested and verified as an effective mediator that mitigates the effects of the influencing projects award on construction project cost performance. The study recommends the prompt implementation of enforcement actions in the form of penalties and strict measures against any defaulting stakeholders and construction project parties. Actions to establish the National Council of Public Procurement (NCPP) as provided by the PPA 2007 are also recommended to ensure practicable enforcement actions.

Article Details

How to Cite
Abdullahi Nafiu Zadawa, Abdul Aziz Hussin, and Atasya Osmadi. 2026. “Mediating Effects of Enforcement on Public Procurement Guidelines’ Compliance Barriers and Cost Performance of Construction Projects in Nigerian Federal Universities: A Process Macro Approach”. Journal of Construction in Developing Countries 23 (1): 81–102. https://doi.org/10.21315/jcdc2018.23.1.5.
Section
Articles

References

Abdullahi, N.Z., Hussin, A.A. and Osmadi, A. (2015). Determinants of compliance with public procurement guidelines in the Nigerian construction industry. Jurnal Teknologi, 75(9): 107–110.

Ademola, E.O. and Ajibola, M.G. (2014). An assessment of non-compliance with procurement proceedings in procurement of works in Nigeria. International Journal of Economic and Business Management, 2(3): 25–34.

Akech, J. (2006). Development partners and governance of public procurement in Kenya: Enhancing democracy in the administration of aid. New York University Journal of International Law and Politics, 37(4): 829.

Akinsiku, O.E. and Iyagba, O.A. (2014). Cost and time performance of construction projects: A comparative study of Southern Peninsular Malaysia and Lagos, Nigeria. Palgo Journal of Education Research, 2(2): 75–82.

Ameyaw, C., Mensah, S. and Osei-Tutu, E. (2011). Challenges facing the smooth implementation of Ghana's Public Procurement Law 2003, Act 663. Proceedings: West Africa Built Environment Research (WABER) Conference. Accra, Ghana, 19–21 July.

Azhar, N., Farooqui, R.U. and Ahmed, S.M. (2008). Cost overrun factors in construction industry of Pakistan. Paper presented at the First International Conference on Construction in Developing Countries (ICCIDC–I): Proceedings on Advancing and Integrating Construction Education, Research and Practice. Karachi, Pakistan, 4–5 August.

Baron, R.M. and Kenny, D.A. (1986). The moderator–mediator variable distinction in social psychological research: Conceptual, strategic and statistical considerations. Journal of Personality and Social Psychology, 51(6): 1173– 1182. https://doi.org/10.1037/0022-3514.51.6.1173.

Bolton, P. and Dewatripont, M. (2005). Contract Theory. Cambridge, MA: MIT Press. Cooke-Davies, T. (2002). The "real" success factors on projects. International Journal of Project Management, 20(3): 185–190. https://doi.org/10.1016/S0263-7863(01)00067-9.

Cornalba, C. and Giudici, P. (2004). Statistical models for operational risk management. Physica A: Statistical Mechanics and Its Applications, 338: 166–172. https://doi.org/10.1016/j.physa.2004.02.039.

Dahiru, A. (2014). Conflict of interests in public procurement management in Nigeria. Paper presented at the NIQS National Seminar on Procurement of Construction Works and Services: Adapting to Contemporary Challenges.

Gombe, Nigeria, 11–12 June. Dalenius, T. and Hodges Jr, J.L. (1959). Minimum variance stratification. Journal of the American Statistical Association, 54(285): 88–101. https://doi.org/10.1080/01621459.1959.10501501.

Dulaimi, M.F. and Shan, H.G. (2002). The factors influencing bid mark-up decisions of large-and medium-size contractors in Singapore. Construction Management and Economics, 20(7): 601–610. https://doi.org/10.1080/01446190210159890.

Eshofonie, F.P. (2008). Factors affecting Cost of Construction in Nigeria. Lagos, Nigeria: University of Lagos.

Eyaa, S. and Oluka, P.N. (2011). Explaining non-compliance in public procurement in Uganda. International Journal of Business and Social Science, 2(11): 35–44.

Fayomi, I.O. (2013). Public procurement and due process policy in Nigeria: Thrust, prospects and challenges. Peak Journal of Social Sciences and Humanities, 1(4): 39–45.

Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study. International Journal of Project Management, 21(5): 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8.

Gambo, N. and Said, I. (2014). A conceptual framework for improving cost and building contractor performances in developing countries. Paper presented at the 7th International Real Estate Research Symposium (IRERS) 2014. National Institute of Valuation (INSPEN), Selangor, Malaysia, 29–30 April.

Gambo, N., Said, I. and Ismail, R. (2016). Influences of cost factors affecting technical performance of local government projects in Nigeria: A partial least square-structural equation modeling (PLS-SEM) approach. Journal of Construction in Developing Countries, 21(1): 85–111. https://doi.org/10.21315/jcdc2016.21.1.5.

Gunningham, N. and Kagan, R.A. (2005). Regulation and business behavior. Law and Policy, 27(2): 213–218. https://doi.org/10.1111/j.1467-9930.2005.00197.x.

Hair, J.F., Black, W.C., Babin, B.J., Anderson, R.E. and Tatham, R.L. (2006). Multivariate Data Analysis. Upper Saddle River, NJ: Pearson Prentice Hall.

Hayes, A.F. (2013a). Introduction to Mediation, Moderation and Conditional Process Analysis: A Regression-Based Approach. New York: Guilford Press.

———. (2013b). Model Templates for PROCESS for SPSS and SAS [White Paper]. Available at: http://www.afhayes.com/ [Accessed on 7 March 2016].

———. (2012). Process: A Versatile Computational Tool for Observed Variable Mediation, Moderation and Conditional Process Modeling [White Paper]. Available at: http://www.afhayes.com/public/process2012.pdf.

Hayes, A.F. and Preacher, K.J. (2014). Statistical mediation analysis with a multicategorical independent variable. British Journal of Mathematical and Statistical Psychology, 67(3): 451–470. https://doi.org/10.1111/bmsp.12028.

Hui, S.W., Radiah, O., Normah, H.O., Rashidah, A.R. and Nurul, H.H. (2011). Procurement issues in Malaysia. International Journal of Public Sector Management, 24: 567–593. https://doi.org/10.1108/09513551111163666.

Imperato, G.L. (2005). Corporate crime, responsibility, compliance and governance. Journal of Health Care Compliance, 3(7): 11–19.

Jacob, O. (2010). Procurement law in Nigeria: Challenge for attainment of its objectives. University of Botswana Law Journal, 4(1): 131–151.

Jibrin, M.S., Ejura, S.B. and Augustine, N.I. (2014). The public procurement reforms in Nigeria: Implementation and compliance challenges. Journal of Asian Business Strategy, 4(11): 149–162.

Kangogo, J. and Kiptoo, E.J. (2013). Factors affecting ethical standards in public procurement in Kenya. International Journal of Management Science, 1(3): 90–99.

Koelmans, R. (2004). Project success and performance evaluation. International Platinum Conference: Platinum Adding Value. Johannesburg: South African Institute of Mining and Metallurgy.

Low, S.P. and Quek, T.C. (2006). Environmental factors and work performance of project managers in the construction industry. International Journal of Project Management, 24(1): 24–37. https://doi.org/10.1016/j.ijproman.2005.06.001.

MacKinnon, D.P., Lockwood, C.M. and Williams, J. (2004). Confidence limits for the indirect effect: Distribution of the product and resampling methods. Multivariate Behavioral Research, 39(1): 99–128. https://doi.org/10.1207/s15327906mbr3901_4.

Migosi, J.A., Ombuki, C.N., Ombuki, K.N. and Evusa, Z. (2013). Determinants of noncompliance of public procurement regulations in Kenyan secondary schools. International Journal of Educational Administration and Policy Studies, 5: 154– 159.

National Population Commission (2000). Nigeria Demographic and Health Survey 1999. Calverton, Maryland: National Population Commission and ORC/ Macro.

National Universities Commission (NUC) (2015). Procurement Entities of Federal Universities. Abuja, Nigeria: NUC.

Ng, S.T., Palaneeswaran, E. and Kumaraswamy, M.M. (2002). A dynamic e-Reporting system for contractor's performance appraisal. Advances in Engineering Software, 33(6): 339–349. https://doi.org/10.1016/S0965-9978(02)00042-X.

Ojo, E. and Gbadebo, A. (2014). An assessment of non-compliance with procurement proceedings in procurement of works in Nigeria. International Journal of Economic and Business Management, 2(3): 25–34.

Okeahalam, C.C. (2004). Corporate governance and disclosure in Africa: Issues and challenges. Journal of Financial Regulation and Compliance, 12(4): 359–370.

Onchweri, N.N. and Muturi, W. (2015). Determinants of compliance in public procurement regulations in the public sector: A case study of Kisii Country. Kenya International Journal of Economics, Commerce and Management, 3(10): 749–758.

Onyinkwa, J. (2013). Factors influencing compliance to procurement regulations in public secondary schools in Kenya: A case of Nyamache District, KisII County. Interdisciplinary Journal of Contemporary Research in Business, 5(1): 561–592.

Othman, R., Zakaria, H., Nordin, N., Shahidan, Z. and Jusoff, K. (2010). The Malaysian public procurement's prevalent system and its weaknesses. American Journal of Economics and Business Administration, 2(1): 6. https://doi.org/10.3844/ajebasp.2010.6.11.

Oyeyipo, O.O., Odusami, K.T., Ojebi, R.A. and Afolabi, A.O. (2016). Factors affecting contractors' bidding decision for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2): 21–35. https://doi.org/10.21315/jcdc2016.21.2.2.

Pallant, J. (2011). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS Version 18. 4th Ed. Berkshire: Open University Press.

Pillay, S. (2004). Corruption: The challenge to good governance; A South African perspective. International Journal of Public Sector Management, 17(7): 586– 605. https://doi.org/10.1108/09513550410562266.

Raymond, J. (2008). Benchmarking in public procurement. Benchmarking: An International Journal, 15(6): 782–793. Reimarová, H. (2011). Transaction costs in public procurement. Diploma diss. Charles University in Prague.

Sang, W.K. and Mugambi, F. (2014). Factors affecting compliance with public procurement laws and regulations in public institutions in Kenya: A case study of public entities in Mombasa County. International Journal of Social Sciences and Entrepreneurship, 1(11): 650–671.

Scott, W.R. (2005). Institutional theory: Contributing to a theoretical research program. In K.G. Smith and M.A. Hitt (eds.). Great Minds in Management: The Process of Theory Development. New York: Oxford University Press, 460–484.

Sekaran, U. and Bougie, R. (2011). Research Method for Business: A Skill Building Approach. Abingdon: Taylor and Francis.

Shehu, A.S. (2014). An overview of public procurement guidelines in Nigeria. Proceeding on the Procurement of Construction Works and Services: Adapting to Contemporary Challenges. Gombe International Hotel, Nigeria, 11–12 June.

Sobel, M.E. (1986). Some new results on indirect effects and their standard errors in covariance structure models. Sociological Methodology, 16: 159–186.

Sutinen, J.G. and Kuperan, K. (1999). A socio-economic theory of regulatory compliance. International Journal of Social Economics, 26(1/2/3): 174–193.

Tukamuhabwa, B.R. (2012). Antecedents and consequences of public procurement non-compliance behavior. Journal of Economics and Behavioral Studies, 4(1): 34–46.

Williams-Elegbe, S. (2009). A comparative analysis of the Nigerian Public Procurement Act against international best practice. Journal of African Law, 50(1): 85–98.

Williams-Elegbe, S. (2011). The reform and regulation of public procurement in Nigeria. Public Contract Law Journal, 41(2): 339–366.

Zubcic, J. and Sims, R. (2011). Examining the link between enforcement activity and corporate compliance by Australian companies and the implications for regulators. International Journal of Law and Management, 53(4): 299–308. https://doi.org/10.1108/17542431111147800.

Zyl, D.C.V. (2006). Strategic supply chain management by Matatiele Municipality. PhD diss. University of Stellenbosch.