Examining the Performance Level of Project Management Competencies of Architects in Ghana Using Gap Analysis Approach

Main Article Content

Titus Ebenezer Kwofie
Edward Ayebeng Botchway
Samuel Amos-Abanyie

Abstract

Evaluation of the performance level of key project management (PM) competencies of the various project teams is perceived as a recourse necessary for identifying potentially crucial and practical training needs of project team participants in PM practice. However, notable studies in this domain have primarily focused on the identification of critical PM competencies of project managers and engineers of the project team neglecting the architect who are equally important participants of construction project teams. This study focused on assessing the performance level of the critical PM competencies of the architect as a key team participant in project delivery. A quantitative method design was adopted involving a structured questionnaire survey of Ghanaian construction professionals who were selected through snow balling sampling. The data elicited were analysed using mean scores, Kruskal-Wallis test and gap analysis. The findings revealed that, architects show worse performance on seven critical competencies. The practical implication of the findings is that the disposition of architects PM behaviours can be ascertained as this can lend credence to legitimising corrective action through any potential continuing professional development programme and training in PM for architects in the Ghanaian construction industry.

Article Details

How to Cite
Titus Ebenezer Kwofie, Edward Ayebeng Botchway, and Samuel Amos-Abanyie. 2026. “Examining the Performance Level of Project Management Competencies of Architects in Ghana Using Gap Analysis Approach”. Journal of Construction in Developing Countries 23 (1): 125–147. https://doi.org/10.21315/jcdc2018.23.1.8.
Section
Articles

References

Adams, J.R. and Thomas, M. (1991). Integrating strategic project management. PM Network, 5(8): 37–40.

Ahadzie, D.K. and Amoa-Mensa, K. (2010). Management practices in Ghanaian house building industry. Journal of Science and Technology, 30(2): 62–75. https://doi.org/10.4314/just.v30i2.60533.

Ahadzie, D.K., Proverbs, D. and Sarkodie-Poku, I. (2014). Competencies required of project managers at the design phase of mass housing building projects. International Journal of Project Management, 32(6): 958–969. https://doi.org/10.1016/j.ijproman.2013.10.015.

Ahadzie, D.K., Proverbs, D.G., Olomolaiye, P.O. and Ankrah, N.A. (2009). Competencies required by project managers for housing construction in Ghana Implications for CPD agenda. Engineering, Construction and Architectural Management, 16(4): 353–375. https://doi.org/10.1108/09699980910970842.

Alias, Z., Zawawi, E.M.A., Yusof, K. and Aris, N.M. (2014). Determining critical success factors of project management practice: A conceptual framework. Procedia-Social and Behavioral Sciences, 153: 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041.

Azmy, N. (2012). The role of team effectiveness in construction project teams and project performance. PhD diss. Iowa State University Ames.

Baiden, B.K., Price, A.D.F. and Dainty, A.R.J. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1): 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001.

Blodgett, J.G., Bakir, A. and Rose, G.M. (2008). A test of the validity of Hofstede's cultural framework. Journal of Consumer Marketing, 25(6): 339–349. https://doi.org/10.1108/07363760810902477.

Bothma, S.F. (2012). Developing project management competencies in graduate engineers in the construction industry. MBA diss. University of Pretoria.

Brown, K. (2000). Developing project management skills: A service learning approach. Project Management Journal, 31(4): 53–58. https://doi.org/10.1177/875697280003100408.

Buertey, J.L.T., Miezah, A.K. and Adjei-Kumi, T. (2013). Delays to large construction projects in Ghana: A risk overview. In S. Laryea and S. Agyepong (eds.). Proceedings: 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER Conference, 367–380.

Chan, A.P.C., Scott, D. and Chan, A.P.L. (2004). Factors affecting the success of a construction project. Journal of Construction Engineering Management, 130(1): 153–155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153).

Chinowsky, P., Diekman, J. and Galoti, V. (2008). Social network model of construction. Journal of Construction Engineering and Management, 134(10): 804–812. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(804).

Civitello, M.A. (2002). Contractors Guide to Change Orders. 2nd Ed. Upper Saddle River, NJ: Prentice Hall Inc.

Cohen, A., Doveh, E. and Nahum-Shani, I. (2009). Testing agreement for multi-item scales with the indices rWG(J) and ADM(J). Organizational Research Methods, 12(1): 148–164. https://doi.org/10.1177/1094428107300365.

Crawford, L. (2005). Senior management perceptions of project management competence. International Journal of Project Management, 23(1): 7–16. https://doi.org/10.1016/j.ijproman.2004.06.005.

———. (1998). Project management competence for strategy realisation. In A. Hauc, R. Kovac, B. Rozman, A. Semolic and A. Skarabot (eds.). Proceedings: 14th World Congress on Project Management. Ljubljana, Slovenia: International Project Management Association and Slovenian Project Management Association, 10–21.

Dainty, A., Murray, M. and Moore, D. (2006). Communication in Construction: Theory and Practice. London: Taylor and Francis. https://doi.org/10.4324/9780203358641.

Dainty, A.R.J., Cheng, M.I. and Moore, D.R. (2004). A competency-based performance model for construction project managers. Construction Management and Economics, 22(8): 877–886. https://doi.org/10.1080/0144619042000202726.

Danso, A.K. and Fugar, F.D.K. (2009). Capacity-building in construction administration: Key to effective utlisation of the district assembly common Fund for infrastructural development. Journal of the Ghanaian Surveyor, 2(1): 1–5.

Dogbegah, R., Owusu-Manu, D. and Omoteso, K. (2011). A principal component analysis of project management competencies for the Ghanaian construction industry. Australasian Journal of Construction Economics and Building, 11(1): 26–40. https://doi.org/10.5130/ajceb.v11i1.1680.

Draganidis, F., Chamopoulou, P. and Mentzas, G. (2006). An ontology based tool for competency management and learning paths. Paper presented at the I-KNOW, Graz, Austria.

Edum-Fotwe, F.T. and McCaffer, R. (2000). Developing project management competencies: Perspectives from the industry. International Journal of Project Management, 18(2): 111–124. https://doi.org/10.1016/S0263-7863(98)90075-8.

Enshassi, A., Mohamed, S. and Abushaban, S. (2009). Factors affecting the performance of construction projects in the Gaza Strip. Journal of Civil Engineering and Management, 15(3): 269–280. https://doi.org/10.3846/1392-3730.2009.15.269-280.

Fayek, A.R. (2012). Advancing fuzzy hybrid techniques for competency modeling of construction organizations. Paper presented at the NSERC Discovery Grant Application 2013–2017. University of Alberta, Edmonton, Canada.

Fellows, R. and Liu, A. (2008). Research Methods for Construction. West Sussex, UK: Blackwell Pubishing.

Field, A. (2005). Discovering Statistics Using SPSS for Windows. London: Sage Publications.

Foreman, J. and Argenti, P.A. (2005). How corporate communication influences strategy implementation, reputation and the corporate brand: An exploratory qualitative study. Corporate Reputation Review, 8(3): 245–264. https://doi.org/10.1057/palgrave.crr.1540253.

Fugar, F.D.K. and Agyakwah-Baah, A.B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2): 103–116. https://doi.org/10.5130/ajceb.v10i1/2.1592.

Gillies, A. and Harris, D. (2009). Performance improvement in a community care setting in Canada. Proceedings of the 4th European Conference on Entrepreneurship and Innovation. Antwerp, Belgium: Academic Conferences Ltd.

Gorse, C.A. and Emmitt, S. (2007). Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11): 1197–1213. https://doi.org/10.1080/01446190701567413.

Gray, C. and Hughes, W. (2012). Building Design Management. Oxford: ButterworthHeinemann.

Harvey, R.J. and Hollander, E. (2004). Benchmarking rWG interrater agreement indices: Let's drop the .70 rule-of-thumb. Paper presented at the 19th Annual Conference of the Society for Industrial and Organisational Psychology. Chicago, Illinois, 24 April.

Koskela, L., Huovila, P. and Leinonen, J. (2002). Design management in building construction: From theory to practice. Journal of Construction Research, 3(1): 1–16. https://doi.org/10.1142/S1609945102000035.

Kwofie, T.E., Adinyira, E. and Botchway, E.A. (2015). Identification of the critical project management competencies of architects in the Ghanaian construction industry. International Journal of Construction Management, 15(4): 288–298. https://doi.org/10.1080/15623599.2015.1067347.

Ling, Y.Y. (2003). A conceptual model for selection of architects by project managers in Singapore. International Journal of Project Management, 21(2): 135–144. https://doi.org/10.1016/S0263-7863(02)00014-5.

Love, P.E.D. and Li, H. (2000). Quantifying the causes and costs of rework in construction. Construction Management and Economics Journal, 18(4): 479– 490. https://doi.org/10.1080/01446190050024897.

Masrom, M.A., Skitmore, M. and Bridge, A. (2013). Determinants of contractor satisfaction. Construction Management and Economics, 31(7): 761–779. https://doi.org/10.1080/01446193.2013.814919.

Murphy, K.R., Garcia, M., Kerkar, S., Martin, C. and Balzer, K. (1982). Relationship between observational accuracy and accuracy in evaluating performance. Journal of Applied Psychology, 67(3): 320–325. https://doi.org/10.1037/0021-9010.67.3.320.

Odusami, K.T. (2002). Perceptions of construction professionals concerning important skills of effective project leaders. Journal of Management in Engineering, 18(2): 61–67. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(61).

Odusami, K.T. and Iyagba, R.R. (2001). The most suitable professional for team leadership on building projects as perceived by the professionals in the construction industry. Professional Builder, July: 64–73.

Ogunsemi, D.R., Oyediran, O.S. and Ekundayo, D.O. (2008). Construction professionals and project management competencies in Nigeria. Journal of Construction, 1(2): 6–11.

Olomolaiye, A. and Egbu, C. (2004). The significance of human resource issues in knowledge management within the construction industry: People, problems and possibilities. In F. Khosrowshahi (ed.). Proceedings of the 20th Annual ARCOM Conference. Edinburgh, UK: Heriot-Watt University, 533–540

Omar, M.N. and Fayek, A.R. (2016). Organizational competencies and project performance tool (OCPPT): Evaluating construction project competencies and performance. International Journal of Architecture, Engineering and Construction, 5(1): 29–43.

Omidvar, G., Samad, Z.B.A. and Zafarghandi, S.F. (2011). Critical evaluation of project manager's competency standards for proposing a comprehensive model. Paper presented at the 1er Congrès International en Management et Gestion des Projets. Gatineau (Québec), Canada.

Orgen, N.K., Ahadzie, D.K., Ayarkwa, J. and Badu, E. (2012). An integrated supply chain relationship management theoretical framework for improving Engineering and Design Service Delivery (EDSD) to building contractors in Ghana. In S. Laryea, S.A. Agyepong, R. Leiringer and W. Hughes (eds.). Proceedings: 4th West Africa Built Environment Research (WABER) Conference. Abuja, Nigeria: WABER Conference, 1–7.

Oyedele, L.O., Tham, K.W., Jaiyeoba, B.E. and Fadeyi, M.O. (2003). Model for predicting architect's performance in building delivery process. Journal of Engineering, Design and Technology, 1(2): 168–186. https://doi.org/10.1108/eb060896.

Pellegrinelli, S. and Bowman, C. (1994). Implementing strategy through projects. Long Range Planning, 27(4): 125–132. https://doi.org/10.1016/0024-6301(94)90062-0.

Project Management Institute (PMI) (2008). A Guide to the Project Management Body of Knowledge. 3rd Ed. Pennsylvania: PMI.

Ritchey, T. (2013). Morphological gap analysis using GMA to find the change. Acta Morphologica Generalis, 2(2): 1–14.

Rwelamila, P.M. (2007). Construction project management education programmes in South Africa: Addressing the gap. Paper presented at the Second International Conference World of Construction Project Management. Delft, The Netherlands, 24–26 October.

Sanchez, J.I. and Levine, E.L. (2009). What is (or should be) the difference between competency modelling and traditional job analysis? Human Resource Management Review, 19(2): 53–63. https://doi.org/10.1016/j.hrmr.2008.10.002.

Shen, Q. and Liu, G. (2003). Critical success factors for value management studies in construction. Journal of Construction Engineering and Management, 129(5): 485–491. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(485).

Skipper, C.O. and Bell, L.C. (2008). Leadership development and succession planning. Leadership and Management in Engineering, 8(2): 77–84. https://doi.org/10.1061/(ASCE)1532-6748(2008)8:2(77).

Stanleigh, M. (2010). Use Competency Assessments to Close Project Management Skill Gaps. Toronto: Business Improvement Architects. Available at: http://www.bia.ca/articles/use-competency-assessments-to-close-projectmanagement-skill-gaps/ [Accessed on 20 November 2013].

Stuckenbruck, L.C. (1986). Who determines project success? Proceedings of the 18th Annual Seminar/Symposium (Montreal/Canada). Upper Darby, PA: Project Management Institute, 85–93.

Westerveld, E. (2003). The project excellence model: Lining success criteria and critical success factors. International Journal of Project Management, 21(6): 411–418. https://doi.org/10.1016/S0263-7863(02)00112-6.

Xia, B., Xiong, B., Skitmore, M., Wu, P. and Hu, F. (2015). Investigating the impact of project definition clarity on project performance: Structural equation modelling study. Journal of Management in Engineering, 32(1): 1061–1070.

Xiao, H. (2002). A comparative study of constractor performance based on Japanese, UK and US Construction practice. PhD diss. University of Wolverhampton.

Xiao, H. and Proverbs, D. (2001). A comparison of contractor performance in Japan, the UK and the US: Some preliminary findings from a new approach. In A. Akintoye (ed.). Proceedings: 17th Annual ARCOM Conference. Vol. 1. Salford, UK: Association of Researchers in Construction Management, 661–669.

Xiong, B., Skitmore, M., Xia, B., Masrom, M.A., Ye, K. and Bridge, A. (2013). Examining the influence of participant performance factors on contractor satisfaction: A structural equation model. International Journal of Project Management, 32(3): 482–491. https://doi.org/10.1016/j.ijproman.2013.06.003.

Yadollahi, M., Mirghasemi, M., Zin, R. and Singh, B. (2014). Architect critical challenges as a project manager in construction projects: A case study. Advances in Civil Engineering, 2014: 1–15. https://doi.org/10.1155/2014/205310.

Zavadskas, E.K., Turskis, Z. Tamosaitiene, J. and Marina, V. (2008). Selection of construction project managers by applying Copras-G method. Computer Modelling and New Technologies, 12(3): 22–28.