Interface Problems in Change Order-Challenged Projects
Main Article Content
Abstract
Change orders are among the main sources of problems challenging timely completion of construction projects. The significantly needed conducive interaction among project participants to mitigate completion delay risk due to change orders is often hampered by interface problems. This article describes potential sources of interface problems and their role in affecting completion time of change order-challenged infrastructure construction projects in Indonesia. The identified sources then serve as inputs to formulate a systems thinking model of relational interface problems in change order-challenged projects. A survey of eleven important infrastructure construction projects was conducted to obtain data on the main sources of these interface problems and their severity indexes. A second survey was later conducted to perceive the most frequent causes of change orders, the influence of interface problem cause factors on the length of change order process and the influence of interface problem cause factors on the expediting capacity of a project team and ultimately induce a delay of project completion. The results of both surveys then served as inputs to a systems thinking structure showing the factors in a change order-challenged project. The study shows that contract, technical experience, management, coordination and financial aspects are the potential sources of interface problems in Indonesian infrastructure construction projects. In a change order-challenged project, these interface problems' sources will complicate the efforts to achieve the project's time objective. The study especially points out the role of contract documents' quality in increasing the likelihood and extent of change orders and the influence of workers' productivity in mitigating the negative impact of a change order.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Al-Hammad, A.-M. (2000). Common interface problems among various construction parties. Journal of Performance of Constructed Facilities, 14(2): 71–74. https://doi.org/10.1061/(asce)0887-3828(2000)14:2(71).
Alaryan, A., Emadelbeltagi, El-Shahat, A. and Dawood, M. (2014). Causes and effects of change orders on construction projects in Kuwait. Journal of Engineering Research and Applications, 4(7): 1–8.
Al-Hazmi, M.H.S. (1987). Causes of delays in large building construction projects. MSc diss. King Fahd University of Petroleum and Minerals.
Alnuaimi, A., Taha, R., Mohsin, M. and Al-Harthi, A. (2010). Causes, effects, benefits and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5): 615–622. https://doi.org/10.1061/(asce)co.1943-7862.0000154.
Anumba, C., Kamara, J. and Cutting-Decelle, A.-F., eds. (2007). Concurrent Engineering in Construction Projects. London and New York: Spon Research.
Assaf, S.A., Al-Hammad, A.M. and Al-Shihah, M. (1996). Effects of faulty design and construction on building maintenance. Journal of Performance of Constructed Facilities, 10(4): 171–174.
Assbeihat, J.M. and Sweis, G.J. (2015). Factors affecting change orders in public construction projects. International Journal of Applied Science and Technology, 5(6): 36–63.
Barrie, D. and Paulson, B. (1996). Professional Construction Management. 3rd Ed. New York: McGraw-Hill, Inc.
Chan, D.W.M. and Kumaraswamy, M.M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55–63. https://doi.org/10.1016/s0263-7863(96)00039-7.
Chan, E.H.W. and Suen, H.C.H. (2005). Dispute resolution management for construction projects in China. Management Decision, 43(4): 589–602. https://doi.org/10.1108/00251740510593576.
Chappell, D. and Willis, A. (1996). The Architect in Practice. 8th Ed. Oxford: Blackwell Science Ltd.
Chen, Q., Reichard, G. and Beliveau, Y. (2008). Multiperspective approach to exploring comprehensive cause factors for interface issues. Journal of Construction Engineering and Management, 134(6): 432–441. https://doi.org/10.1061/(asce)0733-9364(2008)134:6(432).
Clough, R.H. and Sears, G.A. (1994). Construction Contracting. 6th Ed. Hoboken, NJ: John Wiley & Sons, Inc.
Cooke-Davis, T. (2001). The "real" success factors on projects. International Journal of Project Management, 20(3): 185–190. https://doi.org/10.1016/S0263-7863(01)00067-9.
Dainty, A.R.J., Cheng, M. and Moore, D.R. (2003). Redefining performance measures for construction project managers: An empirical evaluation. Journal of Construction Management and Economics, 21(2): 209–218. https://doi.org/10.1080/0144619032000049737.
Daniels, C., Farnsworth, C.B. and Weidman, J. (2014). Interface management in mega projects. 50th ASC Annual International Conference Proceedings. Fort Collins, CO: Associated Schools of Construction.
Das, D. and Ngacho, C. (2017). Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund in Kenya. IIMB Management Review, 29(4): 276–293. https://doi.org/10.1016/j.iimb.2017.11.005.
Faridi, A.S. and El-Sayegh, S.M. (2006). Significant factors causing delay in the UAE construction industry. Journal of Construction Management and Economics, 24(11): 1167–1176. https://doi.org/10.1080/01446190600827033.
Fisk, E.R. (1997). Construction Project Administration. 5th Ed. Prentice-Hall.
Hanna, A., Camlic, R., Peterson, P.A. and Nordheim, E.V. (2002). Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1): 57–64. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(57).
Hinze, J. (2001). Construction Contracts. 2nd Ed. New York: McGraw-Hill, Inc. Hinze, J. (1993). Construction Contracts. New York: McGraw-Hill, Inc.
Huang, R.-Y., Huang, C.-T., Lin, H. and Ku, W.-H. (2008). Factor analysis of interface problems among construction parties: A case study of MRT. Journal of Marine Science and Technology, 16(1): 52–63.
Johnston, R.B. and Brennan, M. (1996). Planning or organizing: The implications of theories of activity for management of operations. Omega, International Journal of Management Science, 24(4): 367–384. https://doi.org/10.1016/0305-0483(96)00016-3.
Kaming, P., Olomlaiye, P., Holt, G. and Harris, F. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1): 83–94. https://doi.org/10.1080/014461997373132.
Kavanagh, T.C., Muller, F. and O'Brien, J.J. (1978). Construction Management. New York: McGraw-Hill, Inc. Kennedy, P. (2006). Progress of statutory adjudication as a means of resolving disputes in construction in the United Kingdom. Journal of Professional Issues in Engineering Education and Practice, 132(3): 236–247. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:3(236).
Kostoff, S. (1977). The Architect: Chapters in the History of the Profession. Oxford: Oxford University Press.
Marzuki, P.F., Oktavianus, A. and Regina, A. (2018). Interface problems in construction projects. Paper presented at the 20th International Conference on Construction Engineering and Project Management. Paris, France, 25–26 June.
Moore, C., Mosley, D. and Slagle, M. (1992). Partnering guidelines for win-win project management. Project Management Journal, 22(1): 18–21.
Moselhi, O. (1998). Estimating the cost of change orders. Transactions of the American Association of Cost Engineers, EST.06.1–EST.06.5.
Moselhi, O., Assem, I. and El-Rayes, K. (2005). Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3): 354–359.
Mosley, J.C. and Bubshait, A.A. (2016). Performance evaluation of international contractors in Saudi Arabia. Journal of Professional Issues in Engineering Education and Practice, 142(1): 04015007. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000254.
O'Brien, J.J. (1976). Construction Delay: Responsibilities, Risk and Litigation. Boston: Cahners Books International, Inc.
Pavitt, T.C. and Gibb, A.G.F. (2003). Interface management within construction: In particular, building façade. Journal of Construction Engineering and Management, 129(1): 8–15. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(8).
Pickavance, K. (2000). Delay and Disruption in Construction Contracts. 2nd Ed. London: LLP Professional Publishing.
Sterman, J.D. (1992). System Dynamics Modeling for Project Management. Cambridge, MA: MIT Sloan School of Management.
Wang, Y. (2000). Coordination issues in Chinese large building projects. Journal of Management in Engineering, 16(6): 54–61. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:6(54).
Wren, D.A. (1967). Interface and inter-organizational coordination. The Academy of Management Journal, 10(1): 69–81.