Preferred Entry Mode Choices and Transformation of Indonesian Contractors' Strategy in International Markets

Main Article Content

Wahyudi P Utama
Albert PC Chan
Hafiz Zahoor
Ran Gao
Zulherman

Abstract

The selection of an appropriate entry strategy is an essential stage to expand business to overseas markets. Few studies have been undertaken to investigate this issue in the context of construction industry from the developing economies. This study aims to empirically investigate the entry strategy adopted by Indonesian contractors and observe the transformation of strategy to enter overseas construction markets (OCMs). Combination quantitative and qualitative research approaches was adopted to achieve the objectives. Data were obtained from survey of 103 Indonesian large contractors from 317 samples. Descriptive statistic and relative importance index (RII) were employed to analyse the data in which the results were then triangulated with interview findings. The results indicated those joint venture projects (JVP), branch office (BO) and representative office (RO) are the preferred entry mode choice adopted by Indonesian contractors. Four types of entry strategy transformation were identified. Each types of transformation showed that JVP or sole venture project (SVP) is directly used to pursue projects while BO or RO is set after operating for several projects. This study may provide a profound insight based on developing industries' experiences. For future research direction, the selection of entry mode by investigating the considerations influencing entry mode choice is encouraged.

Article Details

How to Cite
Wahyudi P Utama, Albert PC Chan, Hafiz Zahoor, Ran Gao, and Zulherman. 2026. “Preferred Entry Mode Choices and Transformation of Indonesian Contractors’ Strategy in International Markets”. Journal of Construction in Developing Countries 24 (2): 173–188. https://doi.org/10.21315/Jcdc2019.24.2.8.
Section
Articles

References

Abdul-Aziz, A.R. and Law, Y.H. (2012). Civil engineering consultants from developing countries: An exploration of Malaysian firms. International Journal of Construction Management, 12(2): 1–21. https://doi.org/10.1080/15623599.2012.10773187.

Abdul-Aziz, A.R. and Wong, S.S. (2010). Exploring the internationalization of Malaysian contractors: The international entrepreneurship dimension. Construction Management and Economics, 28(1): 51–61. https://doi.org/10.1080/01446190903460680.

Akadiri, O.P. (2011). Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD diss. University of Wolverhampton.

Ameyaw, E.E. (2014). Risk allocation model for public private partnerships water supply projects in Ghana. PhD diss. The Hong Kong Polytechnic University.

Bageis, A.S. and Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1): 53–71. https://doi.org/10.1080/01446190802596220.

Chen, C. (2008). Entry mode selection for international construction markets: The influence of host country related factors. Construction Management and Economics, 26(3): 303–314. https://doi.org/10.1080/01446190701882382.

Chen, C. and Messner, J.I. (2011). Characterizing entry modes for international construction markets: Paving the way to a selection model. Engineering, Construction and Architectural Management, 18(6): 547–567. https://doi.org/10.1108/09699981111180872.

Chen, C. and Messner, J.I. (2009). Entry mode taxonomy for international construction markets. Journal of Management in Engineering, 25(1): 3–11. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:1(3).

Chen, C. and Orr, R. (2009). Chinese contractors in Africa: Home government support, coordination mechanisms and market entry strategies. Journal of Construction Engineering and Management, 135(11): 1201–1210. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000082.

Chen, L.Y. and Mujtaba, B. (2007). The choice of entry mode strategies and decision for international market expansion. The Journal of American Academy of Business, 10(2): 322.

Czaja, R. and Blair, J. (1996). Designing Surveys: A Guide to Decisions and Procedures. Thousand Oaks, CA: Pine Forge Press.

Enshassi, A., Arain, F. and Al-Raee, S. (2010). Causes of variation orders in construction projects in the Gaza Strip. Journal of Civil Engineering and Management, 16(4): 540–551. https://doi.org/10.3846/jcem.2010.60.

Lam, K.C., Tang, C.M. and Lee, W.C. (2005). Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2): 127–145. https://doi.org/10.1080/0144619042000202834.

Leedy, P.D. and Ormrod, J.E. (2001). Practical Research Planning and Design. 7th Ed. Upper Saddle River, NJ: Prentice-Hall.

Li, H., Jin, Z., Li, V., Liu, G. and Skitmore, R.M. (2013). An entry mode decision-making model for the international expansion of construction enterprises. Engineering, Construction and Architectural Management, 20(2): 160–180. https://doi.org/10.1108/09699981311303026.

Ling, F.Y.Y., Ibbs, C.W. and Cuervo, J.C. (2005). Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5): 509–520. https://doi.org/10.1080/01446190500040141.

Maqsoom, A., Charoenngam, C., Masood, R. and Awais, M. (2014). Foreign market entry considerations of emerging economy firms: An example of Pakistani contractors. Procedia Engineering, 77: 222–228. https://doi.org/10.1016/j.proeng.2014.07.020.

Pan, Y. and Tse, D.K. (2000). The hierarchical model of market entry modes. Journal of International Business Studies, 31(4): 535–554. https://doi.org/10.1057/palgrave.jibs.8490921.

Pheng, S.L. and Hongbin, J. (2003). Internationalization of Chinese construction enterprises. Journal of Construction Engineering and Management, 129(6): 589–598. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(589).

Preece, C.N., Isa, C.M.M., Saman, H.M. and Ibrahim, C.K.C. (2016). Development of entry location, entry timing and entry mode decision model for construction firms in international markets. Construction Management and Economics, 34(4–5): 236–257. https://doi.org/10.1080/01446193.2015.1084429.

Root, F.R. (1994). Entry Strategies for International Markets. Lexington, USA: Lexington Books. Roschke, P.N. (1994). Validation of knowledge-based system with multiple bridge rail experts. Journal of Transportation Engineering, 120(5): 787–806. https://doi.org/10.1061/(ASCE)0733-947X(1994)120:5(787).

Schirmer, H.J. (1996). Global expansion: A growing dilemma. Journal of Management Engineering, 12(5): 28–31. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:5(28).

Tjandra, I.K. (2004). Organisational learning in construction: The case of construction firms in Jakarta, Indonesia. PhD diss. National University of Singapore.

Utama, W.P., Chan, A.P.C., Zahoor, H. and Gao, R. (2016). Review of research trend in international construction projects: A bibliometric analysis. Construction Economics and Building, 16(2): 71–82. https://doi.org/10.5130/AJCEB.v16i2.4866.

Willard, D. (2012). Improving quality management system implementation in Indonesian construction companies. PhD diss. Queensland University of Technology.