Influence of Subcontractor Risk Management on Quality Performance of Building Construction Projects in Ghana

Main Article Content

Emmanuel Adinyira
Kofi Agyekum
James Cofie Danku
Prince Addison
Augustine Senanu Kukah

Abstract

This study intended to examine the influence subcontractor risk management has on the quality performance of building construction projects. Using a quantitative research method, five hypothesised constructs were tested. The views of 139 Heads of Works for Metropolitan, Municipal and District Assemblies (MMDAs) in Ghana were elicited using a structured questionnaire. A confirmatory factor analysis (CFA) based on structural equation model (SEM) was adopted in analysing the data obtained. The findings suggest that the management of four (financial risks, resource risks, technical risks and managerial risks) out of the five categories of risks positively influenced the quality performance of building construction projects. Relationship risks showed no significant influence on construction quality performance. The study showed quantitatively the effects of sub-contractor risks on quality performance. It provides a vivid relationship between the concept of sub-contracting and quality performance. Therefore, failure to properly manage risks sourced from sub-contractors on a building construction project will have a major adverse consequence on the quality performance of the project. This study further advances efforts at understanding the link between sub-contractor management and project performance with a particular focus on the management of risks emanating from the use of subcontractors on building projects.

Article Details

How to Cite
Emmanuel Adinyira, Kofi Agyekum, James Cofie Danku, Prince Addison, and Augustine Senanu Kukah. 2020. “Influence of Subcontractor Risk Management on Quality Performance of Building Construction Projects in Ghana”. Journal of Construction in Developing Countries 25 (2): 175–197. https://doi.org/10.21315/jcdc2020.25.2.7.
Section
Articles

References

Abderisak, A. and Lindahl, G. (2015). Take a chance on me? Construction client's perspectives on risk management. Procedia Economics and Finance, 21: 548–554. https://doi.org/10.1016/S2212-5671(15)00211-7.

Abdul-Rahman, H., Wang, C., Takim, R. and Wong, S. (2011). Project schedule influenced by financial issues: Evidence in the construction industry. Scientific Research and Essays, 6(1): 205–212. https://doi.org/10.5897/SRE10.989.

Adinyira, E., Ahadzie, D.K. and Kwofie, T.E. (2013). Determining the unique features of mass housing projects (MHPs). In Proceedings of the 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER.

Agyekum, K., Kissi, E., Danku, J.C., Ampratwum, G. and Amegatsey, G. (2020). Factors driving the career progression of construction project managers. Journal of Engineering, Design and Technology, 18(6): 1773–1791. https://doi.org/10.1108/JEDT-09-2019-0242.

Agyekum, K., Simons, B. and Botchwey, S.Y. (2018). Factors influencing the performance of safety programmes in the Ghanaian construction industry. Acta Structilia, 25(2): 39–61. https://doi.org/10.18820/24150487/as25i2.2.

Aje, I. (2012). The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2): 159–172. https://doi.org/10.1108/09699981211206098.

Akintoye, A. and MacLeod, M. (1997). Risk analysis and management in construction. International Journal of Project Management, 15(1): 31–38. https://doi.org/10.1016/S0263-7863(96)00035-X.

Alashwal, A.M. and Al-Sabahi, H. (2018). Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2): 43–62. https://doi.org/10.21315/jcdc2018.23.2.4.

Al-Hammad, A.M. (2000). Common interface problems among various construction parties. Journal of Performance of Constructed Facilities, 14(2): 71–74. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(71).

Amoah, C. and Pretorious, L. (2020). Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case of construction systems. Journal of Engineering, Design and Technology, 18(3): 611–634. https://doi.org/10.1108/JEDT-06-2018-0098.

Asman, G.E., Kissi, E., Agyekum, K., Baiden, B.K. and Badu, E. (2019). Critical components of environmentally sustainable buildings design practices of office buildings in Ghana. Journal of Building Engineering, 26: 100925. https://doi.org/10.1016/j.jobe.2019.100925.

Awwad, R., El-Souki, O. and Jabbour, M. (2016). Construction safety practices and challenges in a Middle Eastern developing country. Safety Science, 83: 1–11. https://doi.org/10.1016/j.ssci.2015.10.016.

Charoenngam, C. and Yeh, C.-Y. (1999). Contractual risk and liability sharing in hydropower construction. International Journal of Project Management, 17(1): 29–37. https://doi.org/10.1016/S0263-7863(97)00064-1.

Chen, J., Yang, L., Su, M. and Lin, J. (2010). A rule extraction-based approach in predicting derivative use for financial risk hedging by construction companies. Expert Systems with Applications, 37(9): 6510–6514. https://doi.org/10.1109/ICIII.2011.101.

Chiang, Y.H. (2009). Subcontracting and its ramifications: A survey of the building industry in Hong Kong. International Journal of Project Management, 27(1): 80–88. https://doi.org/10.1016/j.ijproman.2008.01.005

Choudhry, R.M., Hinze, J.W., Arshad, M. and Gabriel, H.F. (2012). Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering Management, 138(12): 1353–1359. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000562.

Dai, J., Goodrum, P., Maloney, W. and Srinivasan, C. (2009). Latent structures of the factors affecting construction labour productivity. Journal of Construction Engineering and Management, 135(5): 397–406. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:5(397).

da-Silva, L.H.R. and Crispim, J.A. (2014). The project risk management process: A preliminary study. Procedia Technology, 16(2014): 943–949. https://doi.org/10.1016/j.protcy.2014.10.047.

De Lemos, T., Eaton, D., Betts, M. and de Almeida, L.T. (2004). Risk management in the Lusoponte concession: A case study of the two bridges in Lisbon, Portugal. International Journal of Project Management, 22(1): 63-73. https://doi.org/10.1016/S0263-7863(03)00013-9.

DeVellis, R. (2003). Scale Development: Theory and Applications. Thousand Okas, CA: Sage.

Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Journal of Construction Management and Economics, 27(12):1245–1263. https://doi.org/10.1080/01446190903394541.

Edwards, P.J. and Bowen, P.A. (1998). Risk and risk management in construction: Review and future directions for research. Engineering Construction and Architectural Management, 4(1): 339–349. https://doi.org/10.1046/J.1365-232X.1998.54072.x.

El-Karim, M.S.B.A.A, El Nawawy, O.A.M and Abdel-Alim, A.M. (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13: 202–216. https://doi.org/10.1016/j.hbrcj.2015.05.001.

El-Kholy, A.M. (2019). A new technique for subcontractor selection by adopting choosing by advantages. International Journal of Construction Management, Forthcoming. http://doi.org/10.1080/15623599.2019.1683694.

El-Mashaleh, M.A. (2009). Construction subcontractor selection model. Jordan Journal of Civil Engineering, 3(4): 375–383.

El-Sayegh, S. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26(4): 431–438. http://doi.org/10.1016/j.ijproman.2007.07.004.

Enshassi, A., Mohamed, S. and Abu Mosa, J. (2008). Risk management in building projects in Palestine: Contractors' perspectives. Emirates Journal for Engineering Research, 13(1): 29–44.

Faber, W.E. (1979). Protecting Giant Projects: A Study of Problems and Solutions in the Area of Risk and Insurance. Ipswich, UK: Willis Faber.

Faridi, A. and El-Sayegh, S. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11): 1167–1176. http://doi.org/10.1080/01446190600827033.

Fernando, C.K., Hosseini, M.R., Zavadskas, E.K., Perera, B.A.K.S. and Rameezdeen, R. (2017). Managing the financial risks affecting construction contractors: Implementing hedging in Sri Lanka. International Journal of Strategic Property Management, 21(2): 212–224. http://doi.org/10.3846/1648715X.2017.1301592.

Fisk, E.R. (2003). Construction Project Administration. 7th Ed. New Jersey/Ohio: Prentice Hall.

Ghoddousi, P. and Hosseini, M. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy, 18(1): 99–116. http://doi.org/10.3846/20294913.2012.661203.

Ghosh, S. and Jintanapakanont, J. (2004). Identifying and assessing the critical risk factors in an underground rail project in Thailand: A factor analysis approach. International Journal of Project Management, 22(8): 633–643. http://doi.org/10.1016/j.ijproman.2004.05.004.

Goh, C. and Abdul-Rahman, H. (2013). The identification and management of major risks in the Malaysian construction industry. Journal of Construction in Developing Countries, 18(1): 19–32.

Hair Jr, J.F., Hult, G.T.M., Ringle, C. and Sarstedt, M. (2016). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). Thousand Oaks, CA: Sage Publications.

Hair, J.F., Henseler, M., Ringle, C.M. and Mena, J.A. (2012). An assessment of the use of partial least squares structural equation modeling in marketing research. Journal of the Academy of Marketing Science, 40(3): 414–433. http://doi.org/10.1007/s11747-011-0261-6.

Hair, J.F., Ringle, C.M. and Sarstedt, M. (2011). PLS-SEM: Indeed a silver bullet. Journal of Marketing Theory and Practice, 2(1): 139–152. http://doi.org/10.2753/MTP1069-6679190202.

Hair, J.F., Sarstedt, M., Hopkins, L. and Kuppelwieser, V.G. (2014). Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2): 106–121. http://doi.org/10.1108/EBR-10-2013-0128.

Hertz, D.B. and Thomas, H. (1983). Risk Analysis and Its Applications. New York: John Wiley and Sons Inc.

Hlaing, N.N., Singh, D., Tiong, R.L.K. and Ehrlich, M. (2008). Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2): 85–95. http://doi.org/10.1108/13664380810898104.

Husin, S., Abdullah, Riza, M. and Afifuddin, M. (2017). Construction cost impacts related to manpower, material, and equipment factors in contractor firms' perspectives. In Proceedings of the 3rd International Conference on Construction and Building Engineering. New York: AIP Publishing.

Hwang, B., Zhao, X. and Ng, S. (2013). Identifying the critical factors affecting schedule performance of public housing projects. Habitat International, 38: 214–221. http://doi.org/10.1016/j.habitatint.2012.06.008.

Iqbal, S., Choudhry, R., Holschemacher, K., Ali, A. and Tamošaitienè, J. (2015). Risk management in construction projects. Technological and Economic Development of Economy, 21(1): 65–78. http://doi.org/10.3846/20294913.994582.

Jarkas, A.M. and Haupt, T.C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1): 165–194. https://doi.org/10.1108/JEDT-03-2014-0012.

Jayasudha, K. and Vidivelli, B. (2016). Analysis of major risks in construction projects. ARPN Journal of Engineering and Applied Sciences, 11(11): 6943–6950.

Jorion, P. (2009). Financial Risk Manager Handbook. 5th Ed. New Jersey: Wiley.

Joshi, N.N., and Lambert, J.H. (2011). Diversification of infrastructure projects for emergent and unknown non-systematic risks. Journal of Risk Research, 14(6): 717–733. http://doi.org/10.1080/13669877.2011.553733.

Kadan, R. (2016). Developing guidelines for managing subcontractors within the constraints of cost and time. MPhil diss. Kwame Nkrumah University of Science and Technology.

Kartam, N. and Kartam, S. (2001). Risk and its management in the Kuwaiti construction industry: A contractors' perspective. International Journal of Project Management, 19(6): 325–335. http://doi.org/10.1016/S0263-7863(00)00014-4.

Kasapoğlu, E. (2018). Risk management in construction. In Sustainable Buildings: Interaction between a Holistic Conceptual Act and Material Properties. London: IntechOpen, 49–71.

Ke, Y., Wang, S., Chan, A. and Cheung, E. (2011). Understanding the risks in China's PPP projects: Ranking of their probability and consequence. Engineering, Construction and Architectural Management, 18(5): 481–496. http://doi.org/10.1108/09699981111165176.

Kwofie, T.E., Adinyira, E. and Fugar, F. (2016). Modelling the effect of housing design unit contract packaging on mass housing project team communication performance. Journal of Construction in Developing Countries, 21(1): 35–50. http://doi.org/10.21315/jcdc2016.21.1.3.

Kwofie, T.E., Fugar, F., Adinyira, E. and Ahadzie, D.K. (2014). Identification and classification of the unique features of mass housing projects. Journal of Construction Engineering, 2014: 1–11. http://doi.org/10.1155/2014/927652.

Le-Hoai, L., Lee, Y. and Lee, J. (2008.) Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6): 367–377. http://doi.org/10.1007/s12205-008-0367-7.

Lester, A. (2007). Project Management, Planning and Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards. Burlington, MA: Elsevier.

Lew, Y-L., Hassim, S., Muniandy, R. and Hua, L.T. (2018). Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7): 835–860. http://doi.org/10.1108/ECAM-04-2017-0073.

Li, H., Arditi, D. and Wang, Z. (2015). Determinants of transaction costs in construction projects. Journal of Civil Engineering and Management, 21(5): 548–558. http://doi.org/10.3846/13923730.2014.8979.

Lu, S. and Yan, H. (2013). A comparative study of the measurements of perceived risk among constructors in China. International Journal of Project Management, 37: 307–312. http://doi.org/10.1016/j.ijproman.2012.06.001.

Manelel, I. and Muya, M. (2008). Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2): 145– 161. http://doi.org/10.1108/17260530810891289.

Mansfield, N.R., Ugwu, O.O. and Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4): 254–260. https://doi.org/10.1016/0263-7863(94)90050-7.

Mbachu, J. (2008). Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(1): 471–484. http://doi.org/10.1080/01446190801918730.

Mouchi, G. (2011). The skill sets required or managing complex construction projects. Business Education and Accreditation, 3(1): 89–100.

Mullins, L.J. (2005). Management and Organizational Behavior. Essex, England: Pearson Education Ltd.

Nelson, K.K. and Pritchard, A.C. (2007). Litigation risk and voluntary disclosure: The use of meaningful cautionary language. In 2nd Annual Conference on Empirical Legal Studies Paper. New York: New York University School of Law. http://doi.org/10.2139/ssrn.998590.

Ng, S.T., Skitmore, M. and Chung, W.F. (2003). Ten basic factors to identify suitable subcontractors for construction projects. Paper presented at the CIB TG 23 International Conference. Hong Kong, 26–27 October.

Perera, B., Dhanasinghe, I. and Rameezdeen, R. (2009). Risk management in road construction: The case of Sri Lanka. International Journal of Strategic Property Management, 13(2): 87–102. http://doi.org/10.3846/1648-715X.2009.13.87-102.

Perera, B., Rameezden, R., Chileshe, N. and Hosseini, M. (2014). Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: A Delphi approach. International Journal of Construction Management, 14(1): 1–19. http://doi.org/10.1080/15623599.2013.875271.

Piasny, J. and Paslawski, J. (2015). Selection of sub-contractors as the quality improvement tool in housing construction. Procedia Engineering, 122: 274– 281. http://doi.org/10.1016/j.proeng.2015.10.036.

PMI (Project Management Institute) (2013). A Guide to the Project Management Body of Knowledge (PMBOK Guide). 5th Ed. Pennsylvannia: PMI Inc.

Polat, G. (2016). Subcontractor selection using integration of the AHP and PROMETHEE methods. Journal of Civil Engineering Management, 22(8): 1042–1054. http://doi.org/10.3846/13923730.2014.948910.

Rane, S.B., Potdar, P.R. and Rane, S. (2019). Development of project risk management framework based on industry 4.0 technologies. Benchmarking: An International Journal. http://doi.org/1010.1108/BIJ-03-2019-0123.

Samuel, L. (2009). Subcontract and supply enquiries in the tender process of contractors. Journal of Construction Management and Economic, 27(12): 1220–1221. http://doi.org/1010.1080/01446190903394533.

Sarstedt, M., Hair, J.F., Ringle, C.M., Thiele, K.O. and Gudergan, S.P. (2016). Estimation issues with PLS and CBSEM: Where the bias lies! Journal of Business Research, 10(1): 3998–4010. http://doi.org/1010.1016/j.jbusres.2016.06.007.

Sarstedt, M., Ringle, C.M., Smith, D., Reams, R. and Hair, J.F. (2014). Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers. Journal of Family Business Strategy, 1(1): 105–115. http://doi.org/1010.1016/j.jfbs.2014.01.002.

Shafii, F., Ali, Z.A. and Othman, M.Z. (2006). Achieving sustainable construction in the developing countries of Southeast Asia. Paper presented at the 6th AsiaPacific Structural Engineering and Construction Conference. Kuala Lumpur, Malaysia, 5–6 September.

Straub, D., Boudreau, M.C. and Gefen, D. (2004). Validation guidelines for IS positivist research. Communications of the Association for Information Systems, 13(1): 24.

Streiner, D.L. and Norman, G.R. (1989). Health Measurement Scales: A Practical Guide to Their Development and Use. New York: Oxford Medical Publications.

Tadayon, M., Jaafar, M. and Nasri, E. (2012). An assessment of risk identification in large construction projects in Iran. Journal of Construction in Developing Countries, 17(1): 57–69.

Tang, W., Qiang, M., Duffield, C.F., Young, D.M. and Lu, Y. (2007). Risk management in the Chinese construction industry. Journal of Construction Engineering and Management, 133(12): 944–956. http://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(944).

Turkey, W. (2011). Risk factors leading to cost overrun in Ethiopian federal road construction projects and its consequences. MSc diss. Addis Ababa University.

Wang, W. (2000). Application of Multi-Objective Genetic Algorithms to Optimize Project Organization. Technical Report. Taiwan: National Science Council.

Wiguna, I. and Scott, S. (2005). Nature of the critical risk factors affecting project performance in Indonesian building contracts. In F. Khosrowshahi (ed.), Proceedings of the 21st Annual ARCOM Conference. London: Association of Researchers in Construction Management (ARCOM), 225–235.

Zavadskas, E.K., Turskis, Z. and Tamošaitiene, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1): 33–46. http://doi.org/10.3846/jcem.2010.03.

Zayed, T., Amer, M. and Pan, J. (2008). Assessing risk and uncertainty inherent in Chinese highway projects using AHP. International Journal of Project Management, 26(4): 408–419. http://doi.org/10.1016/j.ijproman.2007.05.012.

Zedan, H. and Martin, S. (1995). Evaluating contractor prequalification data: Selection criteria and project success factors. Journal of Construction Management and Economics, 2(1): 129–147. http://doi.org/10.1080/01446199700000002.

Zou, P., Zhang, G. and Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6): 601– 614. http://doi.org/10.1016/j.ojproman.2007.03.001.