Modelling Block Laying Productivity on Building Sites in Kampala
Main Article Content
Abstract
Block laying productivity is an important factor in planning, scheduling and control of labour-intensive building projects with significant bearing on project cost and delays. Despite the wide application of block laying on building projects in Uganda, no study has modelled the productivity of block layers in terms of work output in comparison with individual attributes of block layers. This article explores the modelling of block laying productivity on building sites in Kampala based on an individual block layer's attributes and work environment. The data was collected using a specially designed measurement sheet filled on-site and a survey questionnaire to collect data on personal attributes of block layers from 40 building sites. In the estimated regression model, work height, number of porters per block layer and a combination of education and experience were significant at 95% confidence level. The results further show that neither education nor experience alone is important in explaining a block layer's productivity. Based on the results, it is clear that an experienced and educated block layer yields higher block laying productivity, which is important for project planning applications. These results are limited to building sites in Kampala, work heights not exceeding 6 m above ground level and 400 mm × 225 mm × 200 mm blocks.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Alinaitwe, H.M. (2008). Improvement of labour performance and productivity in Uganda's building industry. PhD diss., Lund University.
Alinaitwe, H.M., Mwakali, J.A., Hansson, B., Alinaitwe, H.M., Mwakali, J.A. and Hansson, B. (2007). Factors affecting the productivity of building craftsmen: Studies of Uganda. Journal of Civil Engineering and Management, 13(3): 169– 176. https://doi.org/10.3846/13923730.2007.9636434.
Apolot, R.E. (2009). Investigation into the causes of delay and cost overruns in construction projects in Uganda public sector: Case of civil aviation authority. PhD diss., Makerere University.
Chigara, B. and Moyo, T. (2014). Factors affecting labor productivity on building projects in Zimbabwe. International Journal of Architecture, Engineering and Construction, 3(1): 57–65. https://doi.org/10.7492/IJAEC.2014.005.
Chudley, R. and Greeno, R. (2010). Building Construction Handbook. 8th Ed. Oxford: Elsevier Ltd.
Claeskens, G. and Groningen (2011). Model Selection and Model Averaging. Cambridge: Cambridge University Press.
Dai, J., Goodrum, P.M. and Maloney, W.F. (2009). Construction craft workers' perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3): 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217).
Florin, P.C., Alexandru, M., Maria, M. and Andrea, L. (2017). Models of development of labour productivity forecast. Romanian Statistical Review, 65(4): 107–114.
Green, S.B. (1991). How many subjects does it take to do a regression analysis? Multivariate Behavioral Research, 26(3): 499–510. https://doi.org/10.1207/s15327906mbr2603_7.
Hafez, S.M., Aziz, R.F., Morgan, E.S., Abdullah, M.M. and Ahmed, E.K. (2014). Critical factors affecting construction labor productivity in Egypt. American Journal of Civil Engineering, 2(2): 35–40. https://doi.org/10.11648/j.ajce.20140202.14.
Irumba, R. (2014). Spatial analysis of construction accidents in Kampala, Uganda. Safety Science, 64: 109–120. https://doi.org/10.1016/j.ssci.2013.11.024.
Jang. H., Kyonghoon, K., Hyung, J.K. and Jaejun, K. (2011). Labour productivity model for reinforced concrete construction projects. Journal of Construction Innovation, 11(1): 92–113. https://doi.org/10.1108/14714171111104655.
Kuroshi, P.A. (2014). Study of internal factors affecting labour productivity in medium size construction firms in Nigeria. International Journal of Education and Research, 2(12): 83–92.
Kutner, M.H., Nachtsheim, C.J. and Neter, J. (2004). Applied Linear Regression Models. 4th Ed. New York: McGraw-Hill Publishing Inc.
Makulsawatudom, A. and Emsley, M. (2001). Factors affecting the productivity of the construction industry in Thailand: The project managers' perception. Paper presented at the 17th Annual ARCOM Conference. University of Salford, Salford, 5–7 September.
Ministry of Works and Transport (2012). Standard Specifications Draft for Construction Sector. Kampala, Uganda: Government of Uganda.
Mostafa, E.S. and Khaled, M.E. (2011). Towards improving construction labor productivity and projects' performance. Alexandria Engineering Journal, 50: 321–330. https://doi.org/10.1016/j.aej.2012.02.001.
Muhammad, Z.M. and Rosli, M. (2016). Site layout design that ensures the efficiency at construction sites. Available at: http://civil.utm.my/wpcontent/uploads/2016/12/Site-Layout-Design-That-Ensures-the-Efficiency-atConstruction-Site.pdf.
Nalumansi, J. and Mwesige, G. (2011). Determining productivity of Masons for both stretcher and header bonding on building sites. Paper presented at the 2nd International Conference on Advances in Engineering and Technology: Contribution of Scientific Research in Development. Entebbe, Uganda.
Ng, S.T., Skitmore, R.M., Lam, K.C. and Poon, A.W.C. (2004). Demotivating factors influencing the productivity of civil engineering projects. International Journal of Project Management, 22(2): 139–146. https://doi.org/10.1016/S0263-7863(03)00061-9.
Srinavin, K. and Mohamed, S. (2003). Thermal environment and construction workers' productivity: Some evidence from Thailand. Journal of Building and Environment, 38(2): 339–345. https://doi.org/10.1016/S0360-1323(02)00067-7.
Sweis, R.J., Sweis, G.J., Hammad, A.A.A. and Rumman, M.A. (2009). Modeling the variability of labor productivity in Masonry construction. Jordan Journal of Civil Engineering, 3(3): 197–212.
Syverson, C. (2011). What determines productivity? Journal of Economic Literature, 49(2): 326–365. https://doi.org/10.1257/jel.49.2.326.
Thiyagu, C. and Dheenadhayalan, M. (2015). Construction labor productivity and its improvement. International Research Journal of Engineering and Technology, 2(8): 824–832.
Thomas, V. and Sudhakumar, J. (2014). Factors influencing construction labour productivity: An Indian case study. Journal of Construction in Developing Countries, 19(1): 53–68.
Uganda Bureau of Statistics (2016). Construction Sector Indices, June 2016. Kampala, Uganda: Statistics House.
Uganda National Commission for UNESCO (2013). Uganda and UNESCO, Annual Information Magazine 2012/2013. Madagascar: Editorial Staff of the National Commissions for UNESCO and Editions Afrique Océanie. Available at: http://natcomreport.com/ [Accessed on 1 August 2016].
Voorhis, C.R.W. and Morgan, B.L. (2007). Understanding power and rules of thumb for determining sample sizes. Tutorials in Quantitative Methods for Psychology, 3(2): 43–50. https://doi.org/10.20982/tqmp.03.2.p043.