A Mechanism for Dispute Resolution in the Iranian Construction Industry

Main Article Content

Abdollah Saeb
Mohd Suhaimi Mohd Danuri
Othman Mohamed
Norhanim Zakaria

Abstract

If disputes are not resolved promptly, they tend to become prolonged and escalated, creating a more complicated and less manageable scenario. Therefore, in this study, we formulated a mechanism for dispute resolution in the Iranian construction industry based on alternative dispute resolution methods. The formulated mechanism could aid disputing parties in the construction industry to settle their disputes more effectively and enhance dispute resolution methods in construction standard forms. To achieve this goal, we collected qualitative data using semi-structured interviews with 30 experts who were selected via purposive sampling method. We used MAXQDA software to manage and organise complete interview transcripts and facilitate the qualitative data analysis process. The proposed mechanism and guidance were finally validated using the survey questionnaire. Negotiation has equal potential for dispute resolution with different sources, and it is recommended as the first step in dispute resolution with any source. According to the results, we recommend a three-step resolution mechanism as follows: negotiation, a method based on sources of disputes and a hybrid method of adjudication and arbitration (Adj-Arb), as the appropriate mechanism for dispute resolution in the Iranian construction industry. Replacing arbitration with Adj-Arb in construction standard forms will have satisfactory results in resolving construction disputes and reply to growing criticism that arbitration is becoming more like litigation.

Article Details

How to Cite
Abdollah Saeb, Mohd Suhaimi Mohd Danuri, Othman Mohamed, and Norhanim Zakaria. 2021. “A Mechanism for Dispute Resolution in the Iranian Construction Industry”. Journal of Construction in Developing Countries 26 (1): 205–226. https://doi.org/10.21315/Jcdc2021.26.1.10.
Section
Articles

References

ASFE (Associated Soil and Foundation Engineers) (1988). Alternative Dispute Resolution for the Construction Industry. Silver Springs, MD: Association of Engineering Firms Practicing in the Geosciences.

Brams, S. J. and Mitts, J. R. (2012). Law and mechanism design: Procedures to induce honest bargaining. NYU Annual Survey of American Law, 68(4): 729– 790. https://doi.org/10.2139/ssrn.2161045.

Braun, J. (1998). Arbitration: Promises made, promises broken. Public Management, 80: 9–11.

Brooker, P. and Lavers, A. (1997). Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics Journal, 15(6): 519–526. https://doi.org/10.1080/014461997372728.

Cheung, S.O. and Yiu, T.W. (2006). Are construction disputes inevitable? IEEE Transactions on Engineering Management, 53(3): 456–470. https://doi.org/10.1109/tem.2006.877445.

Cheung, S.O., Suen, H.C. and Lam, T.I. (2002). Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5): 409–417. https://doi.org/10.1061/(asce)0733-9364(2002)128:5(409).

Creswell, J. (2009). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. Thousand Oaks, CA: SAGE Publications, Inc. Cronin-Harris, C. (1995). Mainstreaming: Systematizing corporate use of ADR. Albany Law Review, 59: 847.

Darvishi, H.Y. (2005). Shyve hay jâyghzin yâ gher ghzayi [Alternative or non-judicial methods for dispute settlement]. Gazavat Magazine, 32: 34–39.

Demkin, J.A. (2001). The Architect's Handbook of Professional Practice. Vol. 1. Hoboken, NJ: John Wiley & Sons.

DiDonato, L. (1993). Alternate Methods to Resolve Contract Disputes: Approaches to Effective Prevention. West Virginia: American Association of Cost Engineers.

Dorri, M.H. (2014). Vzeyet Keshvar ha dr Khwsowse Etaleya Dâdrasi [Country situations on the prolongation of the proceedings]. Comparative studies report of Strategic Research Center of President Deputy. Tehran: Strategic Research Center of President Deputy.

Erdis, E. and Ozdemir, S.A. (2013). Analysis of technical specification-based disputes in construction industry. KSCE Journal of Civil Engineering, 17(7): 1541–1550. https://doi.org/10.1007/s12205-013-0016-7.

Friedman, L.M. (1969). Legal culture and social development. Law and Society Review, 4(1): 29–44. https://doi.org/10.2307/3052760.

Gad, G.M. (2012). Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD diss. Iowa State University. https://doi.org/10.31274/etd-180810-674.

Gad, G.M. and Shane, J.S. (2017). Culture-risk-trust model for dispute-resolution method selection in international construction contracts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(4): 04517020. https://doi.org/10.1061/(asce)la.1943-4170.0000242.

Gillie, P., Goetz, P., Muller, F. and Feinberg, K.R. (1991). Using mediation to resolve construction disputes. In R.F. Cushman, G.C. Hedemann and A.S. Tucke (eds.), Alternative Dispute Resolution in the Construction Industry. Chichester, England: Wiley Law, 153–210.

Glasner, K. (2000). Contract disputes: The role of ADR. Dispute Resolution Journal, 55(3): 50. Gould, N. (2012). Adjudication: Malaysia. Available at: http://www.fenwickelliott.com.

Groton, J.P., Blumenfeld, A. and Ratterman, D. (2005). How to keep your project out of litigation, arbitration, and even mediation. Paper presented at the CII Annual Conference "Leadership of Tomorrow: Bridging the Gap". Grapevine, Texas, 20 July.

Harmon, K.M. (2003). Resolution of construction disputes: A review of current methodologies. Leadership and Management in Engineering, 3(4): 187–201. https://doi.org/10.1061/(asce)1532-6748(2003)3:4(187).

Hartman, F. and Snelgrove, P. (1996). Risk allocation in lump-sum contracts: Concept of latent dispute. Journal of Construction Engineering and Management, 122(3): 291–296. https://doi.org/10.1061/(asce)0733-9364(1996)122:3(291)

Hedstrom, P. and Swedberg, R. (eds.) (1998). Social mechanisms: An introductory essay. In Social Mechanisms: An Analytical Approach to Social Theory. Cambridge, UK: Cambridge University Press, 1–31. https://doi.org/10.1017/cbo9780511663901.001

Herisi, I.I. (2011). Hghoghe Mohandesi [Engineering law, note of the contract]. Tehran: Enteshârâte Dâdghostar.

ICPC (Iranian Civil Procedure Code) (2000). Ghânon Aein Dâdrasi Dâdegh hy Emomy v Enghlâb dr Emore Madani Iran Act [Iranian civil procedure code in general and revolutionary courts act]. Tehran: ICPC.

Jahren, C.T. and Dammeier, B.F. (1990). Investigation into construction disputes. Journal of Management in Engineering, 6(1): 39–46. https://doi.org/10.1061/(asce)9742-597x(1990)6:1(39).

Kangari, R. (1995). Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2): 201–208. https://doi.org/10.1061/(asce)0733-9364(1995)121:2(201).

Katozeyan, N. (2003). Eøtebâr Amreh Gazâvat Shodeh dr Dâvi Madani [Validity of the judgment in civil affairs]. Tehran: Enteshârâte Meyzan.

Kennedy, P. (2008). Evolution of statutory adjudication as a form of dispute resolution in the UK construction industry. Journal of Professional Issues in Engineering Education and Practice, 134(2): 214–219. https://doi.org/10.1061/(asce)1052-3928(2008)134:2(214).

Kumaraswamy, M.M. and Yogeswaran, K. (1998). Significant sources of construction claims. International Construction Law Review, 15(1): 144–160.

Lee, C., Won, J.W., Jang, W., Jung, W., Han, S.H. and Kwak, Y.H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8): 1683–1696. https://doi.org/10.1016/j.ijproman.2017.07.011.

LTSF (Litigation Trends Survey Findings) (2013). The Ninth Annual Report of the LTSF. Houston, TX: Fulbright and Jaworski L.L.P. Available at: www.fulbright.com.

Majlis (1972). Mâdeye Vâhedeya Lâyeheya Ghânoni Râjeø ba Eslâhe Tabsarehe 80 Ghânoneh Bodjeh [Single article of the Bill on Amendments to Note 80 of the Budget Act]. Tehran: Majlis Shorâyeh Islami.

Maskin, E.S. (2008). Mechanism design: How to implement social goals. American Economic Review, 98(3): 567–576. https://doi.org/10.1257/aer.98.3.567.

Mayring, P. (2014). Qualitative content analysis: Theoretical foundation, basic procedures and software solution. In A. Bikner-Ahsbahs, C. Knipping and N. Presmeg (eds.), Approaches to Qualitative Research in Mathematics Education. Dordrecht, Netherlands: Springer, 365–380. https://doi.org/10.1007/978-94-017-9181-6_13.

McGaw, M.C. (1995). Adjudicators, experts and keeping out of court. Construction Law Journal, 8(4): 332–359.

Menassa, C.C. (2009). Quantitative Framework to Evaluate Alternative Dispute Resolution Investments in Architecture Engineering and Construction Projects Using Option and Real Option Theory. Ann Arbor, MI: ProQuest LLC.

Mohamed, O. (2014). Knowledge sharing initiatives in local authorities in Malaysia. PhD diss. University of Salford.

Mohd Danuri, M.S., Ishan, Z.M., Mustaffa, N.E., Karim, S.B.A., Mohamed, O. and Hanid, M. (2016). Dispute avoidance procedure: Formulating a workable legal system in the Malaysian construction industry. Journal of Design and Built Environment, 16(1): 37–46. https://doi.org/10.22452/jdbe.vol16no1.4.

Mohd Danuri, M.S., Mohd Ishan, Z., Mustaffa, N.E., Abd-Karim, S.B., Mohamed, O. and A-Rahmin, R.A. (2015). Dispute avoidance procedure: observing the influence of legal culture towards a workable legal system. Pertanika Journal of Social Sciences and Humanities, 23(2): 509–535.

MPO (Management and Planning Organization) (2006). Nezâmeh Fani v Egrâye Kashvar [Country technical and executive system], Circular No1-42339//T 3497, July. Tehran: MPO. Available at: http://tec.mporg.ir/Portal/View/Page.aspx?PageId=24cddfab-d2f8-4ff9-a473-2176d7a24686.

Ndekugri, I. and Russell, V. (2005). Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4): 399–408. https://doi.org/10.1080/0144619042000326747.

Nelson, S. (2003). Advanced legal concepts. CE 395U.3 class notes. University of Texas at Austin.

Omoto, T., Kobayashi, K. and Onishi, M. (2002). Bargaining model of construction dispute resolution. In IEEE International Conference on Systems, Man and Cybernetics. Vol. 7. Reston, VA: Institute of Electrical and Electronics Engineers (IEEE). https://doi.org/10.1109/icsmc.2002.1175658.

Peña-Mora, F. and Tamaki, T. (2001). Effect of delivery systems on collaborative negotiations for large-scale infrastructure projects. Journal of Management in Engineering, 17(2): 105–121. https://doi.org/10.1061/(asce)0742-597x(2001)17:2(105).

Pena-Mora, F., Sosa, C.E. and McCone, D.S. (2003). Introduction to Construction Dispute Resolution. Upper Saddle River, NJ: Prentice Hall. President Deputy in Strategic Planning and Control (2015). Mørefie mâvenate: Vazayef; Tehran [Introducing deputy: Duties; Tehran]. Available at: http://old.spac.ir/Portal/Home/ShowPage.aspx.

Ranjbar, A. (2003). Shyve Hay Hale Ekhtelafate Jayghzin dr Hghoghe Dakhle [Alternative dispute resolution methods in internal law]. Tehran: Islamic Parliament Research Center of the Islamic Republic of Iran. Ross, D. (n.d.). Construction disputes resolution. Available at: http://www.layngross.com.

Saeb, A. (2019). Enhancement of dispute resolution mechanism in the Iranian construction industry. PhD diss. University of Malaya.

. (2012). Price list method diagnosis and propose an initiative. Master's diss. University of Shahid Beheshti.

Saeb, A., Mohamed, O.B., Danuri, M.S.B.M. and Zakaria, N.B. (2018a). Critical factors for selecting a neutral to support alternative dispute resolution methods in the construction industry. Civil Engineering Journal, 4(1): 11–23. https://doi.org/10.28991/cej-030965.

. (2018b). Development of alternative dispute resolution in the Iranian construction industry. Malaysian Construction Research Journal (MCRJ), 3(1): 25–36.

Saeb, A., Mohd Danuri, M.S.B., Zakaria, N.B. and Mohamed, O.B. (2020). A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3): 211–230. https://doi.org/10.1080/15578771.2019.1575937.

Sandholm, T. (2003). Automated mechanism design: A new application area for search algorithms. In F. Rossi (ed.), Principles and Practice of Constraint Programming: CP 2003. Berlin, Heidelberg: Springer, 19–36. https://doi.org/10.1007/978-3-540-45193-8_2.

Saunders, M.N., Saunders, M., Lewis, P. and Thornhill, A. (2011). Research Methods for Business Students. 5th Ed. New Delhi: Pearson Education India. Shadbolt, R.A. (1999). Resolution of construction disputes by disputes review boards. International Construction Law Review, 16: 101–111.

Shin, K.C.K. (2000). Identification of critical dispute characteristics (CDCs) during construction project operations. PhD diss. Georgia Institute of Technology.

Sourdin, T.M. (2006). Legislating for Alternative Dispute Resolution: A Guide for Government Policy Makers and Legal Drafters. Canberra: National Alternative Dispute Resolution Advisory Council (NADRAC).

Steen, R.H. and MacPherson, R.J. (2000). Resolving construction disputes out of court through ADR. Journal of Property Management, 65(5): 58–58.

Stipanowich, T.J. (1997). At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6): 505–512. https://doi.org/10.1080/014461997372700.

Stipanowich, T. (1987). Arbitration and the multiparty dispute: The search for workable solutions. Iowa Law Review, 72: 473.

Trantina, T.L. (2003). An Attorney's Guide to Alternative Dispute Resolution (ADR): ADR 1.01. Bedminster, NJ: Van Nostrand.

Treacy, T.B. (1995). Use of alternative dispute resolution in the construction industry. Journal of Management in Engineering, 11(1): 58–63. https://doi.org/10.1061/(asce)0742-597x(1995)11:1(58).

Winter, G. (2000). A comparative discussion of the notion of "validity" in qualitative and quantitative research. The Qualitative Report, 4(3): 1–14.

World Bank (2011). Settling out of court: Financial and private sector development vice presidency. Note Number 329, 2011, October. Washington DC: World Bank.

Yousefzade, M. (2004). Gozveye hoghoghe kârshenâs [Booklet of expert law]. In Enteshârâte Sâzemâne Nezâm Mohandesi Sâkhtemân [Construction Engineering Organization Publication]. Tehran: Construction Engineering Organization.