Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective

Main Article Content

Zheng Ping Lee
Rahimi A. Rahman
Shu Ing Doh

Abstract

Design-build (D-B) had been applied in many advanced countries because the delivery method improves construction project success. While several megaprojects in Malaysia have adopted D-B, it is still uncommon in the local construction industry. Therefore, understanding the key drivers that are affecting the acceptance or rejection of D-B is crucial. However, that information is lacking in the existing body of knowledge. Thus, this research addresses that issue by identifying the key drivers for adopting D-B in the Malaysian construction sector from the standpoint of the core project parties (e.g., project clients, consultants and contractors). Questionnaire survey data from 111 professionals with D-B experience were analysed using inferential statistics, including t-test and analysis of variance (ANOVA). The outcome shows that the key drivers for industry practitioner in Malaysia for adopting D-B are: (1) "Maximise the use of resources between project team members", (2) "Sharing of expertise (design and technical) with project team members", (3) "Well-organised project team structure", (4) "High success rate" and (5) "Dispute prevention during the construction stage". Also, there are no significant differences found in the drivers between different geographical regions and project parties. Based on the investigations, this study adds to the current assortment of information in capturing the key drivers and providing an in-depth understanding of the underlying components for adopting D-B in Malaysia. Researchers and industry practitioners can use the findings to enhance the level of D-B adoption strategically

Article Details

How to Cite
Zheng Ping Lee, Rahimi A. Rahman, and Shu Ing Doh. 2021. “Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective”. Journal of Construction in Developing Countries 26 (1): 131–160. https://doi.org/10.21315/Jcdc2021.26.1.07.
Section
Articles

References

Akintoye A. (2014). Design and build: A survey of construction contractors' views. Construction Management and Economics, 12(2): 155–163. https://doi.org/10.1080/01446199400000021.

Aljohani, A. (2017). Construction projects cost overrun: What does the literature tell us? International Journal of Innovation, Management and Technology, 8(2): 137–143. https://doi.org/10.18178/ijimt.2017.8.2.717.

Ando, M. (2016). History of the past 30 years' transition and present status of project delivery methods and contracting system in Japan. Paper presented at the 1st International Conference of Construction Project Delivery Methods and Quality Ensuring System Symposium.

. (2011). Japanese "design and build": Risk-taking and competence acquisition in the social aspect of design and build; Order and contract. Journal of Architecture and Building Science, Architectural Institute of Japan, 3: 18–21.

Bagaya, O. and Song, J. (2016). Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso. Journal of Management in Engineering, 32(5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.

Behr, D. (2017). Assessing the use of back translation: The shortcomings of back translation as a quality testing method. International Journal of Social Research Methodology, 20(6): 573–584. https://doi.org/10.1080/13645579.20 16.1252188.

Blake, S.H., Browne, J. and Sime, S. (2016). A Practical Approach to Alternative Dispute Resolution. Oxford: Oxford University Press. Available at: https://books.google.com/books?hl=en&lr=&id=31pnDAAAQBAJ&oi=fnd&pg=PP1&dq=related:94mGm6zqL_AJ:scholar.google.com/&ots=AOu81CcnjE&sig=l6ndNjAvif5tMV87exJOTSnozaU [Accessed on 27 August 2019].

Bo, X. and Chan, A.P. (2012). Investigation of barriers to entry into the designbuild market in the People's Republic of China. Journal of Construction Engineering and Management, 138(1): 120–127. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000387.

Bogus, S.M., Migliaccio, G.C. and Jin, R. (2013). Study of the relationship between procurement duration and project performance in design-build projects: Comparison between water/wastewater and transportation sectors. Journal of Management in Engineering, 29(4): 382–391. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000165.

Braimah, N. (2014). Understanding construction delay analysis and the role of preconstruction programming. Journal of Management in Engineering, 30(5): 04014023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000216.

Campos, G.O., Zimek, A., Sander, J., Campello, R.J., Micenková, B., Schubert, E. and Houle, M.E. (2016). On the evaluation of unsupervised outlier detection: Measures, datasets and an empirical study. Data Mining and Knowledge Discovery, 30(4): 891–927. https://doi.org/10.1007/s10618-015-0444-8.

Chakra, H.A. and Ashi, A. (2019). Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon. Journal of Industrial Engineering International, 15(1): 147–152. https://doi.org/10.1007/s40092-019-00323-1.

Chan, A.P., Javed, A.A., Lyu, S., Hon, C.K. and Wong, F.K. (2016). Strategies for improving safety and health of ethnic minority construction workers. Journal of Construction Engineering and Management, 142(9): 05016007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001148.

Chan, A.P.C., Darko, A. and Ameyaw, E.E. (2017). Strategies for promoting green building technologies adoption in the construction industry: An international study. Sustainability, 9(6): 969. https://doi.org/10.3390/su9060969.

Chan, D.W., Lam, P.T., Chan, A.P. and Wong, J.M. (2010). Achieving better performance through target cost contracts: The tale of an underground railway station modification project. Facilities, 28(5–6): 261–277. https://doi.org/10.1108/02632771011031501.

Chan, D.W.M., Chan, J.H.L. and Ma, T. (2014). Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in South Australia. Facilities, 32(11/12): 624–646. https://doi.org/10.1108/F-08-2012-0063.

Chatterjee, D. (2012). Innovativeness: A team knowledge and communication perspective. International Journal of Innovation and Learning, 12(3): 229–246. https://doi.org/10.1504/IJIL.2012.048807.

Chen, W.T. and Chen, T.T. (2007). Critical success factors for construction partnering in Taiwan. International Journal of Project Management, 25(5): 475–484. https://doi.org/10.1016/j.ijproman.2006.12.003.

Chen, W.T., Chen, T.T., Lu, C.S. and Liu, S.S. (2012). Analyzing relationships among success variables of construction partnering using structural equation modeling: A case study of Taiwan's construction industry. Journal of Civil Engineering and Management, 18(6): 783–794. https://doi.org/10.3846/13923730.2012.735062.

Cheung, S.O., Wong, P.S. and Lam, A.L. (2012). An investigation of the relationship between organizational culture and the performance of construction organizations. Journal of Business Economics and Management, 13(4): 688– 704. https://doi.org/10.3846/16111699.2011.620157.

Choudhry, R.M., Gabriel, H.F., Khan, M.K. and Azhar, S. (2017). Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2): 1–18. https://doi.org/10.21315/jcdc2017.22.2.1.

Darko, A., Chan, A.P., Owusu-Manu, D.G. and Ameyaw, E.E. (2017a). Drivers for implementing green building technologies: An international survey of experts. Journal of Cleaner Production, 145: 386–394. https://doi.org/10.1016/j.jclepro.2017.01.043.

Darko, A., Chan, A.P.C., Gyamfi, S., Olanipekun, A.O., He, B.J. and Yu, Y. (2017b). Driving forces for green building technologies adoption in the construction industry: Ghanaian perspective. Building and Environment, 125: 206–215. https://doi.org/10.1016/j.buildenv.2017.08.053.

Darko, A., Zhang, C. and Chan, A.P. (2017). Drivers for green building: A review of empirical studies. Habitat International, 60: 34–49. https://doi.org/10.1016/j.habitatint.2016.12.007.

Dawes, J. (2008). Do data characteristics change according to the number of scale points used? An experiment using 5-point, 7-point and 10-point scales. International Journal of Market Research, 50(1): 61–77. https://doi.org/10.1177/147078530805000106.

DBIA (Design Build Institute of America) (2018). 2018 State Statute Report, DBIA 9/4/2018. Washington DC: DBIA.

Demirkesen, S. and Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of Project Management, 35(8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008.

Denti, L. and Hemlin, S. (2012). Leadership and innovation in organizations: A systematic review of factors that mediate or moderate the relationship. International Journal of Advanced Construction Management, 16(3): 13–18. https://doi.org/10.1142/S1363919612400075.

Durdyev, S. and Hosseini, M. (2020). Causes of delays on construction projects: A comprehensive list. International Journal of Managing Projects in Business, 13(1): 20–46. https://doi.org/10.1108/IJMPB-09-2018-0178.

El-Karim, M.S.B.A.A., El Nawawy, O.A.M. and Abdel-Alim, A.M. (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2): 202–216. https://doi.org/10.1016/j.hbrcj.2015.05.001.

Eriksson, P.E. (2017). Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(2): 211–230. https://doi.org/10.1108/JFMPC-05-2016-0018.

Gibb, A.G.F. and Isack, F. (2003). Re-engineering through pre-assembly: Client expectations and drivers. Building Research and Information, 31(2): 146–160. https://doi.org/10.1080/09613210302000.

Gogol, B., Brunner, M., Goetz, T., Martin, R., Ugen, S., Keller, U., Fischbach, A. and Preckel, F. (2014). "My questionnaire is too long!" The assessments of motivational-affective constructs with three-item and single-item measures. Contemporary Educational Psychology, 39(3): 188–205. https://doi.org/10.1016/j.cedpsych.2014.04.002.

Goldstein, M. and Uchida, S. (2016). A comparative evaluation of unsupervised anomaly detection algorithms for multivariate data. PLoS ONE, 11(4): e0152173. https://doi.org/10.1371/journal.pone.0152173.

Gomez, C. and Gambo, M. (2016). Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1): 147–165. http://dx.doi.org/10.21315/jcdc2016.21.1.8.

Gudien?, N., Banaitis, A., Banaitien?, N. and Lopes, L. (2013). Development of a conceptual critical success factors model for construction projects: A case of Lithuania. Procedia Engineering, 57: 392–397. https://doi.org/10.1016/j.proeng.2013.04.051.

Hair, J.F., Money, A.H., Samouel, P. and Page, M. (2007). Research methods for business. Education + Training, 49(4): 336–337. https://doi.org/10.1108/et.2007.49.4.336.2.

Halil, F.M., Nasir, N.M., Shukur, A.S. and Hashim, H. (2018). A quantitative analysis study on the implementation of partnering in the design and build construction project. IOP Conference Series: Earth and Environmental Science, 117: 012033. https://doi.org/10.1088/1755-1315/117/1/012033.

Hamzah, N., Khoiry, M.A., Arshad, I., Tawil, N.M. and Ani, A.C. (2011). Cause of construction delay: Theoretical framework. Procedia Engineering, 20: 490– 495. https://doi.org/10.1016/j.proeng.2011.11.192.

Hashim, A.E., Samikon, S.A., Ismail, F. and Ismail, Z. (2015). Managing facilities on Malaysian low-cost public residential for sustainable adaptation. Procedia – Social and Behavioral Sciences, 168: 52–60. https://doi.org/10.1016/j.sbspro.2014.10.209.

Hassanien, A. and Dale, C. (2012). A framework for distributed key management schemes in public construction projects in the United States. Paper presented at the 25th ASCE International Performance Engineering and Construction Management Conference 2012.

Arizona, USA. Hemlin, C. (1994). Team building a global team at Apple Computer. Employment Relations Today, 21(1): 55–62. https://doi.org/10.1002/ert.3910210107.

Hidenori, K. (1995). Trust, integration and leadership: Tenets of Japanese design and build. Paper presented at the Design and Build Projects: International Experiences International Congress on Construction. Singapore, 5–6 October.

Hugick, L. and Best, J. (2008). Questionnaire length. In P.J. Lavrakas (ed.), Encyclopedia of Survey Research Methods. Thousand Oaks, CA: SAGE Publications, Inc. Available at: https://books.google.com/books?hl=en&lr=&id=Rhp1AwAAQBAJ&oi=fnd&pg=PP1&dq=Lavrakas.+(2013).+Questionnaire+Length.+In+Encyclopedia+of+Survey+Research+Methods.&ots=NTO2BXqJya&sig=5xFsWQX87YglLZtpVdj61Y6iSOo [Accessed on 27 June 2019].

Hwang, B.G. and Lim, E.S.J. (2013). Critical success factors for key project players and objectives: Case study of Singapore. Journal of Construction Engineering and Management, 139(2): 204–215. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000597.

Hwang, B.G., Zhao, X., See, Y.L. and Zhong, Y. (2015). Addressing risks in green retrofit projects: The case of Singapore. Project Management Journal, 46(4): 76–89. https://doi.org/10.1002/pmj.21512.

Hwang, Y.S., Bartlett, B., Greben, M. and Hand, K. (2017). A systematic review of mindfulness interventions for in-service teachers: A tool to enhance teacher wellbeing and performance. Teaching and Teacher Education, 64: 26–42. https://doi.org/10.1016/j.tate.2017.01.015.

Ibrahim, I.I., Daniel, S. and Ahmad, A. (2014). Investigating Nigerian indigenous contractors' project planning in construction procurement: An explanatory approach. International Journal of Civil and Environmental Engineering, IJCEE–IJENS, 14(4): 16–25.

Imtiaz, G. and Ibrahim, A.R. (2005). Lean production system in project delivery: The way forward for Malaysian construction industry. Paper presented at the Kuala Lumpur Quantity Surveyor International Convention (QSIC). Kuala Lumpur.

Jaafar, M. and Nuruddin, A.R. (2012). The development of public and private construction procurement systems in the Malaysian construction industry. Journal of Design and Built Environment, 11(1): 1–11. Kaiser, H. (1970). A second generation. Little Jiffy Psychometrika, 35: 401–415. https://doi.org/10.1007/BF02291817.

Ke, Y., Ling, F. Y., Ning, Y. and Zhang, Z. (2019). Managing relationships in large public projects: Comparative study of China and Singapore. Built Environment Project and Asset Management, 9(3): 348–363. https://doi.org/10.1108/BEPAM-10-2018-0128.

Kerzner, H. (2014). Strategic planning for a project office. Project Management Journal, 34(2): 13–25. https://doi.org/10.1177/875697280303400203.

Khairuddin, A.R. (2016). Appraising policies on joint ventures for construction work in Malaysia. In K. Kobayashi, A.R. Khairuddin, G. Ofori and S. Ogunlana (eds.), Joint Ventures in Construction. London: Thomas Telford Publishing, 150–160.

Khairulzan, Y. and Nabilah, A.H.S. (2015). The significant factors causing delay of building construction projects in Malaysia. Malaysia Construction Journal, 20: 593–599.

Khalfan, M.M., Oyegoke, A.S., McDermott, P. and Dickinson, M. (2014). Managing risk and uncertainty in an agile construction environment: Application of agile building specialist model. International Journal of Agile Systems and Management, 3(3–4): 248–262.

Khan, M.A. (2014). Accelerated Bridge Construction: Best Practices and Techniques. Oxford: Elsevier.

Khan, R.A., Liew, M.S. and Ghazali, Z. (2014). Malaysian construction sector and Malaysia Vision 2020: Developed nation status. Procedia – Social and Behavioral Sciences, 109: 507–513. https://doi.org/10.1016/j.sbspro.2013.12.498.

Khoshgoftar, M., Bakar, A.H.A. and Osman, O. (2010). Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2): 53–69. https://doi.org/10.1080/15623599.2010.10773144.

Kinkel, S. and Som, O. (2010). Internal and external R&D collaboration as drivers of the product innovativeness of the German mechanical engineering industry. International Journal of Product Development, 12(1): 6–20. https://doi.org/10.1504/IJPD.2010.034310.

Labaw, P.J. (1980). Advanced Questionnaire Design. Cambridge, MA: Abe Books. Available at: https://www.abebooks.com/Advanced-Questionnaire-DesignLabaw-Patricia-J/1786142332/bd [Accessed on 27 June 2019].

Lam, E.W.M., Chan, A.P.C. and Chan, D.W.M. (2008). Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5): 333–341.

. (2006). Barriers to applying the design-build procurement method in Hong Kong. Architectural Science Review, 49(2): 189–195. https://doi.org/10.3763/asre.2006.4926.

Lam, P.T.I. and Wong, F.W.H. (2009). Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1): 41–52. https://doi.org/10.1080/01446190802570498.

Lamont, P.J. (2016). Construction executive: Options for successful dispute resolution. Available at: https://enewsletters.constructionexec.com/riskmanagement/2016/06/options.

Lee, Z.P., Rahman, R.A. and Doh, S.I. (2020). Success factors of design-build public sector projects in Malaysia. IOP Conference Series: Materials Science and Engineering, 712: 012045. https://doi.org/10.1088/1757-899X/712/1/012045.

Le-Hoai, L., Lee, Y.D. and Lee, J.Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6): 367–377. https://doi.org/10.1007/s12205-008-0367-7.

Le-Hoai, L., Lee, Y.D. and Nguyen, A.T. (2013). Estimating time performance for building construction projects in Vietnam. KSCE Journal of Civil Engineering, 17: 1–8. https://doi.org/10.1007/s12205-013-0862-3.

Levin, P. (ed.) (2016). Construction Contract Claims, Changes and Dispute. 3rd Ed. Reston, VA: American Society of Civil Engineers (ASCE). https://doi.org/10.1061/9780784414293.

Li, Y., Yang, L., He, B. and Zhao, D. (2014). Green building in China: Needs great promotion. Sustainable Cities Society, 11: 1–6. https://doi.org/10.1016/j.scs.2013.10.002.

Ling, F.Y.Y. and Gunawansa, A. (2011). Strategies for potential owners in Singapore to own environmentally sustainable homes. Engineering, Construction and Architectural Management, 18(6): 579–594. https://doi.org/10.1108/09699981111180890.

Ling, F.Y.Y. and Kerh, S.H. (2004). Comparing the performance of design-build and design-bid-build building projects in Singapore. Architectural Science Review, 47(2): 163–175. https://doi.org/10.1080/00038628.2004.9697040.

Ling, F.Y.Y. and Leong, E.F.K. (2012). Performance of design-build projects in terms of cost, quality and time: Views of clients, architects and contractors in Singapore. Australian Journal of Construction Economics and Building, 2(1): 37–46. https://doi.org/10.5130/AJCEB.v2i1.2885.

Ling, F.Y.Y. and Liu, M. (2014). Using neural network to predict performance of design-build projects in Singapore. Building and Environment, 39(10): 1263– 1274. https://doi.org/10.1016/j.buildenv.2004.02.008.

Mao, C., Shen, Q., Pan, W. and Ye, K. (2015). Major barriers to off-site construction: the developer's perspective in China. Journal of Management Engineering, 31(3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.

Marzuki, P., Oktavianus, A., Regina, A., Hasiholan, B. and Meifrinaldi. (2019). Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2): 1–22. https://doi.org/10.21315/jcdc2019.24.2.1.

McLeod, S. (2019). Likert scale definition, examples and analysis. Simply Psychology, 3 August. Available at: https://www.simplypsychology.org/likert-scale.html [Accessed on 27 June 2019].

Melzack, R. (1987). The short-form McGill pain questionnaire. Pain, 30(2): 191–197. https://doi.org/10.1016/0304-3959(87)91074-8.

Merrow, E.W. (2011). Industrial Megaprojects: Concepts, Strategies and Practices for Success. Hoboken, NJ: John Wiley & Sons, Inc.

Misangyi, V.F., LePine, J.A., Algina, J. and Goeddeke, J.F. (2006). The adequacy of repeated-measures regression for multilevel research: Comparisons with repeated-measures ANOVA, multivariate repeated-measures ANOVA and multilevel modeling across various multilevel research designs. Organizational Research Methods, 9(1): 5–28. https://doi.org/10.1177/1094428105283190.

Moore, D.R. and Dainty, A.R.J. (2001). Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: A call for change. Construction Management and Economics, 19(6): 559–562. https://doi.org/10.1080/01446190110055508.

Moza, A. and Paul, V.K. (2018). Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2): 7–26. https://doi.org/10.21315/jcdc2018.23.2.2.

Murray, M. and Seif, M. (2013). Causes of project delays in Nigerian construction industry European. Journal of Civil Engineering and Architecture, 10(1): 1–7.

Nitithamyong, P. and Tan, Z. (2007). Determinants for effective performance of external project management consultants in Malaysia. Engineering, Construction and Architectural Management, 14(5): 463–478. https://doi.org/10.1108/09699980710780764.

Ofori, G. (2018). Construction in developing countries: Need for new concepts. Journal of Construction in Developing Countries, 23(2): 1–6. https://doi.org/10.21315/jcdc2018.23.2.1.

Osborne, J.W. (2015). What is rotating in exploratory factor analysis? Practical Assessment, Research and Evaluation, 20(1): 1–7. https://doi.org/10.7275/hb2g-m060.

Osei-Kyei, R. and Chan, A.P.C. (2017). Developing a project success index for public– private partnership projects in developing countries. Journal Infrastructure System, 23(4): 04017028. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000388.

Ott, R.L. and Longnecker, M. (2010). An Introduction to Statistical Methods and Data Analysis. Boston, MA: Cengage Learning. Available at: https://books.google.com/books?hl=en&lr=&id=VAuyBQAAQBAJ&oi=fnd&pg=PP1&ots=9eBPHqeVNp&sig=6ChgAV8DBpVnNxd_BHCqvJWa9hY [Accessed on 17 May 2019].

Ozorhon, B. and Karahan, U. (2016). Critical success factors of building information modeling implementation. Journal of Management in Engineering, 33(3): 04016054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000505.

Pacheco, R., Ordonez, J. and Martínez, G. (2012). Energy efficient design of building: A review. Renewable and Sustainable Energy Reviews, 16(6): 3559–3573. https://doi.org/10.1016/j.rser.2012.03.045.

Palaneeswaran, E. and Kumaraswamy, M.M. (2000). Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5): 331–339. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331).

Pallant, J. (2020). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS. New York: Routledge. Available at: https://books.google.com/books?hl=en&lr=&id=ryfxDwAAQBAJ&oi=fnd&pg=PT8&dq=Pallant,+J.+(2020).+SPSS+survival+manual:+A+step+by+step+guide+to+data+analysis+using+IBM+SPSS.+Routledge.&ots=AX2HUj3Pfh&sig=TkNqgvafUJRE33BbzELQ4Ybuznk [Accessed on 29 June 2019].

Papajohn, D., El Asmar, M. and Molenaar, K.R. (2019). Contract administration tools for design-build and construction manager/general contractor highway projects. Journal of Management in Engineering, 35(6): 04019028. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000718.

Rea, L.M. and Parker, R.A. (2014). Designing and Conducting Survey Research: A Comprehensive Guide. 4th Ed. Hoboken, NJ: John Wiley & Sons, Inc. Available at: https://books.google.com/books?hl=en&lr=&id=Ub8BBAAAQBAJ&oi=fnd&pg=PA201&dq=Rea,+L.+M.,+and+Parker,+R.+A.+(2014).+Designing+and+conducting+survey+research:+&ots=ixJzq1LhwI&sig=FPjHgJQqZTQbJljVvaqWQcHmDYs [Accessed on 12 July 2019].

Rowlinson, S. and McDermott, P. (eds.) (2013). Procurement Systems: A Guide to Best Practice in Construction. New York: Routledge.

Saaidin, S.E., Endut, I.R., Samah, S.A.A. and Ridzuan, A.R.M. (2016). The current practice of design and build procurement process in Malaysia. Social and Management Research Journal, 13(2): 81–95. https://doi.org/10.24191/smrj.v13i2.5273.

Saito, T. (2015). Comparative study of design-build procurement between Japan and the US on risk management approach. In B.O. Uwakwhe and I.A. Minkarah (eds.), 10th Symposium Construction Innovation and Global Competitiveness. Boca Raton, FL: CRC Press LLC.

Salim, I.M. and Sulaiman, M. (2013). Examination of the relationship between organisational learning and firm's product innovation. International Journal of Innovation and Learning, 13(3): 254–267. https://doi.org/10.1504/IJIL.2013.052896.

Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M. and Coyle, M. (1992). Critical success factors for construction projects. Journal of Construction Engineering Management, 118(1): 94–111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94).

Sekar, G., Viswanathan, K. and Sambasivan, M. (2018). Effects of projectrelated and organizational-related factors on five dimensions of project performance: A study across the construction sectors in Malaysia. Engineering Management Journal, 30(4): 247–261. https://doi.org/10.1080/10429247.2018.1485000.

Shen, L., Zhang, Z. and Zhang, X. (2016). Key factors affecting green procurement in real estate development: A China study. Journal of Cleaner Production, 153: 372–383. https://doi.org/10.1016/j.jclepro.2016.02.021.

Smith, D. (2014). An introduction to design and building with building information modelling. Journal of Building Information Modelling, 1(1): 12–14.

Songer, A.D. and Molenaar, K.R. (2007). Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6): 467–479. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467).

SPSS Statistics (1997). Guide to Data Analysis. Boston, MA: Addison Wesley. Taber, K.S. (2018). The use of Cronbach's alpha when developing and reporting research instruments in science education. Research in Science Education, 48: 1273–1296. https://doi.org/10.1007/s11165-016-9602-2.

Tsiga, Z., Emes, M. and Smith, A. (2016). Critical success factors for the construction industry. PM World Journal, 5(8): 1–12. Vaaland, T.I. (2014). Improving project collaboration: Start with the conflicts. International Journal of Project Management, 22(6): 447–454. https://doi.org/10.1016/j.ijproman.2003.11.003.

Wall, C.J. (1993). The dispute resolution adviser in the construction industry: Implementation for the first time in Hong Kong of the technique of the dispute resolution adviser. Building Research and Information, 21(2): 122–127. https://doi.org/10.1080/09613219308727272.

Wilkins, J.R. (2011). Construction workers' perceptions of health and safety training programmes. Construction Management Economics, 29(10): 1017–1026. https://doi.org/10.1080/01446193.2011.633538.

Won, J., Lee, G., Dossick, C. and Messner, J. (2013). Where to focus for the successful adoption of building information modeling within the organization. Journal of Construction Engineering and Management, 139(11): 172–182. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000731.

Wong, J.K.W., Chan, J.K. and Wadu, M.J. (2016). Facilitating effective green procurement in construction projects: An empirical study of the enablers. Journal of Cleaner Production, 135: 859–871. https://doi.org/10.1016/j.jclepro.2016.07.001.

Wong, P.S., Owczarek, A., Murison, M., Kefalianos, Z. and Spinozzi, J. (2014). Driving construction contractors to adopt carbon reduction strategies: An Australian approach. Journal of Environmental Planning and Management, 57(10): 1465–1483. https://doi.org/10.1080/09640568.2013.811402.

Xia, B. and Chan, A.P. (2010). Key competences of design-build clients in China. Journal of Facilities Management, 8(2): 114–129. https://doi.org/10.1108/14725961011041161.

Yazan, B. (2014). Three approaches to case study methods in education: Yin, Merriam and Stake. The Qualitative Report, 20(2): 134–152. Available at: https://core.ac.uk/download/pdf/51087783.pdf [Accessed on 12 July 2019].

Yongqiang, C., Xingyu, Z. and Ning, Z. (2013). Comparison of project objectives and factors between DBB and DB in China industrial engineering and innovation. Journal of Industrial Engineering, 3(5): 231–240.

Zhang, X., Shen, L. and Wu, Y. (2011). Green strategy for gaining competitive advantage in housing development: A China study. Journal of Cleaner Production, 19(2–3): 157–167. https://doi.org/10.1016/j.jclepro.2010.08.005.

Zhao, X., Hwang, B.G. and Lee, H.N. (2016). Identifying critical leadership styles of project managers for green building projects. International Journal of Construction Management, 16(2): 150–160. https://doi.org/10.1080/15623599.2015.1130602.

Zhao, Z.Y., Shen, L.Y. and Zuo, J. (2015). Performance and strategy of Chinese contractors in the international market. Journal of Construction Engineering and Management, 135: 108–118. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:2(108).