In many developing countries, value management (VM) is not applied widely and systematically in construction projects. This limits the achievement of value for money. The objectives of this study were to describe the state of VM practice in Uganda and suggest strategies for improvement. Based on the extant literature, a conceptual framework depicting VM practice in the lifecycle of construction projects was developed. A questionnaire containing both nominal and ordinal measures was distributed to a sample of Ugandan construction industry professionals. During data analysis, the distributions of nominal variables were expressed in terms of percentages. A univariate analysis of the ordinal variables was undertaken using measures of central tendency (mean) and dispersion (standard deviation). A bivariate analysis of the ordinal variables was undertaken using Friedman, Fisher's exact and Mann-Whitney U tests. The application of VM in Uganda was rudimentary, inconsistent and misguided, based on the reports of the respondents. This finding constitutes the first major contribution of this work to knowledge. It also led to the idea that the practice of VM in Uganda can be improved by raising awareness and the standard for VM application. Ten strategies for these two purposes have been put forward in this article. These strategies constitute the second major contribution to knowledge.

Article Details

How to Cite
Apollo Tutesigensi, Nathan Kibwami, and Saul B. Matege. 2021. “The Status of Value Management Practice on Construction Projects in Uganda and Strategies for Improvement”. Journal of Construction in Developing Countries 26 (2): 251–267. https://doi.org/10.21315/Jcdc2021.26.2.12.
Section
Articles

References

Aghimien, D., Oke, A. and Aigbavboa, C. (2018). Barriers to the adoption of value management in developing countries. Engineering, Construction, and Architectural Management, 25(7): 818–834. https://doi.org/10.1108/ecam-04-2017-0070.

Bowen, P., Edwards, P., Cattell, K. and Jay, I. (2010). The awareness and practice of value management by South African consulting engineers: Preliminary research survey findings. International Journal of Project Management, 28(3): 285–295. https://doi.org/10.1016/j.ijproman.2009.07.001.

Bowen, P.A., Edwards, P.J. and Cattell, K. (2009). Value management practice in South Africa: The built environment professions compared. Construction Management and Economics, 27(11): 1039–1057. https://doi.org/10.1080/01446190903280435.

British Standards Institute (2000). BS EN 12973: 2000 Value Management. London: British Standards Institute. Cheah, C.Y.J. and Ting, S.K. (2005). Appraisal of value engineering in construction in Southeast Asia. International Journal of Project Management, 23(2): 151–158. https://doi.org/10.1016/j.ijproman.2004.07.008.

Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences. Hillsdale, NJ: Lawrence Erlbaum Associates.

Cooper, A. and Potts, K. (2009). Implementing innovation through value engineering: Observations on UK civil engineering contractors. In R. McCaffer (ed.), Proceedings of Global Innovation in Construction Conference, Loughborough University, 13–16 September 2009. Loughborough, UK: Loughborough University, 84–93.

Dahiru, A. (2019). Value management concept in construction projects delivery in Kano State. Arid Zone Journal of Engineering Technology and Environment, 15(2): 355–364.

FIDIC (International Federation of Consulting Engineers) (2010). Conditions of Contract for Construction of Building and Engineering Works Designed by the Employer, Multilateral Development Bank Harmonised Edition. Geneva: FIDIC.

Fielding, N., Lee, R.M. and Blank, G. (2016). The SAGE Handbook of Online Research Methods. Thousand Oaks, CA: Sage Publications. https://doi.org/10.4135/9781473957992.

Fong, P.S. (2004). A critical appraisal of recent advances and future directions in value management. European Journal of Engineering Education, 29(3): 377– 388. https://doi.org/10.1080/03043790410001663292.

Fong, P.S. and Shen, Q. (2000). Is the Hong Kong construction industry ready for value management? International Journal of Project Management, 18(5): 317–326. https://doi.org/10.1016/S0263-7863(99)00028-9.

Gray, C.D. and Kinnear, P.R. (2012). IBM SPSS Statistics 19 Made Simple. Hove, UK: Psychology Press. https://doi.org/10.4324/9780203723524.

Green, S.D. (1994). Beyond value engineering: Smart value management for building projects. International Journal of Project Management, 12(1): 49–56. https://doi.org/10.1016/0263-7863(94)90009-4.

Institute of Value Management (2018). What is value? Available at: https://ivm.org.uk/what-is-value-management [Accessed on 14 June 2019].

Institution of Civil Engineers (2015). Creating Value in Engineering: ICE Design and Practice Guide. London: Thomas Telford.

Jaapar, A., Maznan, N.A. and Zawawi, M. (2012). Implementation of value management in public projects. Procedia – Social and Behavioral Sciences, 68: 77–86. https://doi.org/10.1016/j.sbspro.2012.12.208.

Jaapar, A., Zawawi, M., Bari, N.A.A. and Ahmad, N. (2012). Value management in the Malaysian construction industry: Addressing a theory and practice gap. Procedia – Social and Behavioral Sciences, 35: 757–763. https://doi.org/10.1016/j.sbspro.2012.02.146.

Kelly, J. and Male, S. (1993). Value Management in Design and Construction: The Economic Management of Projects. London: Taylor & Francis.

Kelly, J.J., Male, S. and Graham, D. (2015). Value Management of Construction Projects. Chichester, UK: Wiley-Blackwell. https://doi.org/10.1002/9781119007258.

Khodeir, L.M. and El Ghandour, A. (2019). Examining the role of value management in controlling cost overrun [application on residential construction projects in Egypt]. Ain Shams Engineering Journal, 10(3): 471–479. https://doi.org/10.1016/j.asej.2018.11.008.

Kiboome, W. (2017). Project management in developing countries: Value management as a solution to escalating construction costs in Uganda. The Engineers Journal – Uganda, 1: 40–45.

Kim, S.Y, Lee, Y., Thanh, N.V. and Luu, T.V. (2016). Barriers to applying value management in the Vietnamese construction industry. Journal of Construction in Developing Countries, 21(2): 55–80. https://doi.org/10.21315/jcdc2016.21.2.4.

Liu, G. and Shen, Q. (2005). Value management in China: Current state and future prospect. Management Decision, 43(4): 603–610. https://doi.org/10.1108/00251740510593585.

Luvara, V.G. and Mwemezi, B. (2017). Obstacles against value management practice in building projects of Dar es Salaam, Tanzania. International Journal of Construction Engineering and Management, 6(1): 13–21. https://doi.org/10.5923/j.ijcem.20170601.02.

Madushika, W., Perera, B., Ekanayake, B. and Shen, G. (2020). Key performance indicators of value management in the Sri Lankan construction industry. International Journal of Construction Management, 20(2): 157–168. https://doi.org/10.1080/15623599.2018.1484556.

Male, S., Kelly, J., Fernie, S., Gronqvist, M. and Bowles, G. (1998). Value Management: The Value Management Benchmark: A Good Practice Framework for Clients and Practitioners. London: Thomas Telford.

Muhwezi, L., Acai, J. and Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1): 13–23. https://doi.org/10.5923/j.ijcem.20140301.02.

Norton, B.R. and McElligott W.C. (1995). Value Management in Construction: A Practical Guide. Basingstoke, UK: Macmillan. https://doi.org/10.1007/978-1-349-13350-5.

Office of Government Commerce (2007). Value Management in Construction: Case Studies. London: Office of Government Commerce. Office of the Auditor General (2020). Value for money individual audit reports. Available at: http://www.oag.go.ug/vfm-individual-audit-reports/ [Accessed on 1 November 2020]. . (2017a). Value for Money Audit Manual. Kampala: Office of the Auditor General.

. (2017b). OAG Annual Performance Report 2017. Kampala: Office of the Auditor General. Perera, S., Hayles, C.S. and Kerlin, S. (2011). An analysis of value management in practice: The case of Northern Ireland's construction industry. Journal of Financial Management of Property and Construction, 16(2): 94–110. https://doi.org/10.1108/13664381111153097.

Roslon, J., Ksi??ek-Nowak, M. and Nowak, P. (2020). Schedules optimization with the use of value engineering and NPV maximization. Sustainability, 12(18): 7454. https://doi.org/10.3390/su12187454.

SAVE International (2015). The Value Methodology Standard. Mount Royal, NJ: SAVE International.

Shahhosseini, V., Afshar, M. and Amiri, O. (2017). Value engineering practices in infrastructure projects: A case study of Ilam Gas Refinery's water transmission system at Reno Mountain, Iran. International Journal of Construction Management, 18(5): 351–363. https://doi.org/10.1080/15623599.2017.1326298.

Shen, Q. and Yu, A. (2015). Value Management in Construction and Real Estate: Methodology and Applications. Abingdon, UK: Routledge. https://doi.org/10.4324/9781315723297.

Sievert, R.W. (1991). A review of value engineering as an effective system for planning building projects. Project Management Journal, 22(1): 31–38.

Singh, K. (2007). Quantitative Social Research Methods. Thousand Oaks, CA: Sage Publications. https://doi.org/10.4135/9789351507741.

Spaulding, W.M., Bridge, A. and Skitmore, M. (2005). The use of function analysis as the basis of value management in the Australian construction industry. Construction Management and Economics, 23(7): 723–731. https://doi.org/10.1080/01446190500040679.

Standards Australia (2007). Australian Standard: Value Management, AS 4183:2007. Sydney: Standards Australia.

Uganda Road Fund (2018). Technical Audit Manual. Kampala: Uganda Road Fund. Younker, D.L. (2003), Value Engineering: Analysis and Methodology: Boca Raton, FL: CRC Press. https://doi.org/10.1201/9780203912751.