Challenges Hindering the Resourcing for Post-Disaster Housing Reconstruction in Gaza
Main Article Content
Abstract
Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ahmed, I. (2011). An overview of post-disaster permanent housing reconstruction in developing countries. International Journal of Disaster Resilience in the Built Environment, 2(2): 148–164. https://doi.org/10.1108/17595901111149141.
Al-Qeeq, F. and El-Wazir, M. (2010). Sustainable housing strategies in post-war reconstruction of the Gaza Strip. Paper presented at the International Congress: Rehabilitation and Sustainability; The Future is Possible. Barcelona, 4–6 October.
Alston, M., Hargreaves, D. and Hazeleger, T. (2018). Post-disaster social work: Reflections on the nature of place and loss. Australian Social Work, 71(4): 405– 416. https://doi.org/10.1080/0312407X.2017.1409776.
Andrew, S., Arlikatti, S., Long, L. and Kendra, J. (2013). The effect of housing assistance arrangements on household recovery: An empirical test of donor-assisted and owner-driven approaches. Journal of Housing and the Built Environment, 28(1): 17–34. https://doi.org/10.1007/s10901-012-9266-9
Arroyo, D. (2014). Blurred lines: accountability and responsibility in post-earthquake Haiti. Medicine, Conflict and Survival, 30(2): 110–132. https://doi.org/10.1080/13623699.2014.904642.
Arslan, H. and Johnson, C. (2010). Turkey: Can small actors overcome the absence of state will. In M. Lyons, T. Schilderman and B. Camill (eds.), Building Back Better: Delivering People-Centred Housing Reconstruction at Scale. London: Practical Action Publishing: 263–283. https://doi.org/10.3362/9781780440064.012.
Baradan, B. (2007). Analysis of the post-disaster reconstruction process following Turkish earthquakes, 1999. In D. Alexander, C.A. Davidson, A. Fox, C. Johnson and G. Lizzaralde (eds.), Post-Disaster Reconstruction: Meeting Stakeholder Interests : Proceedings of a conference held at the Scuola di Sanità Militare, Florence, Italy 17–19 May 2006. Florence: Firenze University Press, 165–176. https://doi.org/10.36253/978-88-8453-611-2.
Barakat, S. and Masri, F. (2017). Still in Ruins: Reviving the Stalled Reconstruction of Gaza. Washington DC: Brookings Institution. Available at: https://www.brookings.edu/wp-content/uploads/2017/08/paper_revivingreconstruction-of-gaza_english_web.pdf.
Barakat, S. and Shaban, O. (2015). Back to Gaza: A New Approach to Reconstruction. Washington DC: Brookings Institution. Available at: https://www.brookings.edu/wp-content/uploads/2016/06/English-PDF-2.pdf.
Barakat, S., Milton, S. and Elkahlout, G. (2019). Reconstruction under siege: The Gaza Strip since 2007. Disasters, 44(3): 477–498. https://doi.org/10.1111/disa.12394.
. (2018). The Gaza reconstruction mechanism: Old wine in new bottlenecks. Journal of Intervention and Statebuilding, 12(2): 208–227. https://doi.org/10.1080/17502977.2018.1450336.
Barakat, S., Zyck, S.A. and Hunt, J.E. (2009). The Reconstruction of Gaza: A Guidance Note for Palestinian and International Stakeholders. York, UK: Post-war Reconstruction and Development Unit, University of York.
Barenstein, J. (2015). Continuity and change in housing and settlement patterns in post-earthquake Gujarat, India. International Journal of Disaster Resilience in the Built Environment, 6(2): 140–155.
Baroudi, B. and Rapp, R. (2014). Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(2): 182–193. https://doi.org/10.1108/IJDRBE-07-2012-0021.
Bilau, A. and Witt, E. (2016). An analysis of issues for the management of postdisaster housing reconstruction. International Journal of Strategic Property Management, 20(3): 265–276. https://doi.org/10.3846/1648715X.2016.1189975.
Bilau, A., Witt, E. and Lill, I. (2018). Practice framework for the management of postdisaster housing reconstruction programmes. Sustainability, 10(11): 1–26. https://doi.org/10.3390/su10113929.
. (2015). A Framework for managing post-disaster housing reconstruction. Procedia Economics and Finance, 21(15): 313–320. https://doi.org/10.1016/s2212-5671(15)00182-3.
Binder, S., Baker, C. and Barile, J. (2015). Rebuild or relocate? Resilience and post-disaster decision-making after Hurricane Sandy. American Journal of Community Psychology, 56(1–2): 180–196. https://doi.org/10.1007/s10464-015-9727-x.
Boen, T. (2014). Reconstruction in Indonesia post-2004 tsunami: Lessons learnt. In M. Beer, I. Kougioumtzoglou, E. Patelli and I.K. Au (eds.), Encyclopedia of Earthquake Engineering. Berlin: Springer, 1–7. https://doi.org/10.1007/978-3-642-36197-5_265-1.
Bothara, J., Dhakal, R., Ingham, J. and Dizhor, D. (2016). The challenges of housing reconstruction after the April 2015 Gorkha, Nepal earthquake. Technical Journal of Nepal's Engineers Association, 121–131.
Carrasco, S., Ochiai, C. and Okazaki, K. (2016). Impacts of resident-initiated housing modifications in resettlement sites in Cagayan de Oro, Philippines. International Journal of Disaster Risk Reduction, 17: 100–113. https://doi.org/10.1016/j.ijdrr.2016.05.001.
Carver, R. and Nash, J. (2005). Guide books of Doing Data Analysis with SPSS. 14th Ed. Belmont, CA: Duxbury Press.
Celentano, G., Escamilla, E., Göswein, V. and Habert, G. (2019). A matter of speed: The impact of material choice in post-disaster reconstruction. International Journal of Disaster Risk Reduction, 34: 34–44. https://doi.org/10.1016/j.ijdrr.2018.10.026.
Chang, Y. (2012). Resourcing for post-disaster housing reconstruction. PhD diss. University of Auckland. Available at: http://researchspace.auckland.ac.nz/handle/2292/18891.
Chang, Y., Wilkinson, S., Potangaroa, R. and Seville, E. (2012a). Resourcing for post-disaster reconstruction: A comparative study of Indonesia and China. Disaster Prevention and Management: An International Journal, 21(1): 7–21. https://doi.org/10.1108/09653561211202674.
. (2012b). Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5): 557–580. https://doi.org/10.1108/09699981211259621.
. (2011). Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics, 29(1): 37–48. https://doi.org/10.1080/01446193.2010.521761.
. (2010a). Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research and Information, 38(3): 247–264. https://doi.org/10.1080/09613211003693945.
Chang, Y., Wilkinson, S., Seville, E. and Potangaroa, R. (2010b). Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment, 1(1): 65–83. https://doi.org/10.1108/17595901011026481.
. (2010c). Interpreting resourcing bottlenecks of post-Wenchuan earthquake reconstruction in China. International Journal of Strategic Property Management, 14(4): 314–331. https://doi.org/10.3846/ijspm.2010.24.
Chang-Richards, Y., Wilkinson, S., Seville, E. and Brunsdon, D. (2017). Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(1): 2–20. https://doi.org/10.1108/ECAM-03-2014-0044.
Chatat, T.A. (2012). Investigate the disaster management process in the Gaza Strip. MSc diss. The Islamic University of Gaza. Available at: http://hdl.handle.net/20.500.12358/19499.
Davidson, C., Johnson, C., Lizarralde, G., Dikmen, N. and Sliwinski, A. (2007). Truths and myths about community participation in post-disaster housing projects. Habitat International, 31(1): 100–115. https://doi.org/10.1016/j.habitatint.2006.08.003.
Earnest, J. (2015). Post-conflict reconstruction: A case study in Kosovo. International Journal of Emergency Services, 4(1): 103–128. https://doi.org/10.1108/IJES-02-2015-0009.
El-Masri, S. and Kellett, P. (2001). Post-war reconstruction. Participatory approaches to rebuilding the damaged villages of Lebanon: A case study of al-Burjain. Habitat International, 25(4): 535–557. https://doi.org/10.1016/S0197-3975(01)00023-6.
El-Sawalhi, N. and Lafi, M. (2019). Evaluation of the public housing projects role in contributing to mitigation of housing crisis in Gaza Strip. American Journal of Civil Engineering, 7(4): 88–100. https://doi.org/10.11648/j.ajce.20190704.12.
Enshassi, A. and Shakalaih, S. (2016). Community based disaster risk reduction: a case study from the Gaza Strip. In Proceedings of the 2nd International Conference on Disaster Management and Civil Engineering (ICDMCE-2016). Kyoto: ICDMCE-2016. Available at: http://hdl.handle.net/20.500.12358/26516.
Enshassi, A., Al-Najjar, J. and Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2): 126–151. https://doi.org/10.1108/13664380910977592.
Enshassi, A., Chatat, T., von Meding, J. and Forino, G. (2017). Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories. International Journal of Disaster Risk Science, 8(4): 402–414. https://doi.org/10.1007/s13753-017-0155-4.
Enshassi, A., Kumaraswamy, M. and Jomah, A. (2010). Significant factors causing time and cost overruns in construction projects in the gaza strip: Contractors' perspective. International Journal of Construction Management, 10(1): 35– 60. https://doi.org/10.1080/15623599.2010.10773137.
Enshassi, A., Shakalaih, S. and Arain, F. (2017). Community participation challenges in pre-disaster phase within non-governmental organizations. International Journal of Construction Project Management, 9(2): 1–40.
Enshassi, A., Shakalaih, S. and AlKilani, S. (2018). Strategies for community participation in pre-disaster phase in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 23(2): 107–127. https://doi.org/10.21315/jcdc2018.23.2.7.
Enshassi, M.A., Al-Hallaq, K. and Tayeh, B. (2019). Failure factors facing organizations in post-disaster housing reconstruction projects in Gaza Strip. Civil Engineering Research Journal, 8(5): 1–10. https://doi.org/10.19080/CERJ.2019.08.555750.
Fayazi, M. and Lizarralde, G. (2019). The impact of post-disaster housing reconstruction policies on different beneficiary groups: The case of Bam, Iran. In A. Asgary (ed.), Resettlement Challenges for Displaced Populations and Refugees. Cham, Switzerland: Springer, 123–140. https://doi.org/10.1007/978-3-319-92498-4_9.
Fayazi, M., Arefian, F., Gharaati, M., Johnson, C., Lizarralde, G. and Davidson, C. (2017). Managing institutional fragmentation and time compression in postdisaster reconstruction: The case of Bam. International Journal of Disaster Risk Reduction, 21: 340–349. https://doi.org/10.1016/j.ijdrr.2017.01.012.
Fengler, W., Ihsan, A. and Kaiser, K. (2008). Managing post-disaster reconstruction finance: International experience in public financial management. Policy Research Working Paper, 4475: 79–113. https://doi.org/10.1596/1813-9450-4475.
GFDRR (Global Facility for Disaster Reduction and Recovery) (2014). Planning and Implementation of Post-Sidr Housing Recovery: Practice, Lessons and Future Implications. Washington DC: GFDRR. Ginty, R. (2007). Reconstructing post-war Lebanon: A challenge to the liberal peace? Conflict, Security and Development, 7(3): 457–482. https://doi.org/10.1080/14678800701556552.
Hamieh, C. and Ginty, R. (2010). A very political reconstruction: Governance and reconstruction in Lebanon after the 2006 war. Disasters, 34(1): 103–123. https://doi.org/10.1111/j.1467-7717.2009.01101.x.
Hassanain, M., Bin-Mohanna, A., Al-Hammad, A. and Sanni-Anibire, M. (2017). Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(2): 130–142. https://doi.org/10.1108/BEPAM-05-2016-0022.
Hayles, C. (2010). An examination of decision making in post disaster housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 1(1): 103–122. https://doi.org/10.1108/17595901011026508.
Hidayat, B. (2014). The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. Phd diss. The University of Salford. Available at: http://usir.salford.ac.uk/id/eprint/30809/.
Hidayat, B. and Egbu, C. (2010). A literature review of the role of project management in post-disaster reconstruction. In Proceeding: 26th Annual ARCOM Conference. Leeds, UK: Association of Researchers in Construction Management (ARCOM), 1269–1278. Available at: http://usir.salford.ac.uk/id/eprint/10144/.
Holt, G. (2014). Asking questions, analysing answers: Relative importance revisited. Construction Innovation, 14(1): 2–16. https://doi.org/10.1108/CI-06-2012-0035.
Islam, M., Kolade, O. and Kibreab, G. (2018). Post-disaster housing reconstruction: The impact of resourcing in post-cyclones Sidr and Aila in Bangladesh. Journal of International Development, 30(6): 934–960. https://doi.org/10.1002/jid.3367.
Ismail, D., Majid, T., Roosli, R. and Samah, N. (2014). Project management success for post-disaster reconstruction projects: International NGOs perspectives. Procedia Economics and Finance, 18: 120–127. https://doi.org/10.1016/s2212-5671(14)00921-6.
Jayasuriya, S. and Mccawley, P. (2008). Reconstruction After a Major Disaster: Lessons from the Post-Tsunami Experience in Indonesia, Sri Lanka, and Thailand, Working Paper 125. Tokyo: Asian Development Bank Institute.
Jha, A., Barenstein, J., Phelps, P., Pittet, D. and Sena, S. (2010). Safer Homes, Stronger Communities. Washington DC: World Bank. https://doi.org/10.1596/978-0-8213-8045-1.
Karunasena, G. and Rameezdeen, R. (2010). Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(2): 173–191. Available at: https://doi.org/10.1108/17595901011056631.
Kear, M. (2016). Fighting to stay in politics: Hamas and its dual resistance strategy. Paper presented at the Australian Political Science Association Conference. University of New South Wales, Sydney, Australia, 26–28 September.
Kennedy, J., Ashmore, J., Babister, E. and Kelman, I. (2008). The meaning of "build back better": Evidence from post-tsunami Aceh and Sri Lanka. Journal of Contingencies and Crisis Management, 16(1): 24–36. https://doi.org/10.1111/j.1468-5973.2008.00529.x.
Keraminiyage, K., Amaratunga, D. and Haigh, R. (2008). Post tsunami recovery capacity gaps in Sri Lanka. Paper presented at the CIB W89 International Conference on Building Education and Research (BEAR). Sri Lanka, 11–15 February. Available at: http://usir.salford.ac.uk/9818/.
Kovács, G., Matopoulos, A. and Hayes, O. (2010). A community-based approach to supply chain design. International Journal of Logistics Research and Applications, 13(5): 411–422. https://doi.org/10.1080/13675567.2010.511609.
Lawther, P. (2009). Community involvement in post disaster re-construction: Case study of the British Red Cross Maldives recovery program. International Journal of Strategic Property Management, 13(2): 153–169. https://doi.org/10.3846/1648-715X.2009.13.153-169.
Leitmann, J. (2007). Cities and calamities: Learning from post-disaster response in Indonesia. Journal of Urban Health, 84(1): 144–153. https://doi.org/10.1007/s11524-007-9182-6.
Maly, E. (2018). Building back better with people centered housing recovery. International Journal of Disaster Risk Reduction, 29: 84–93. https://doi.org/10.1016/j.ijdrr.2017.09.005.
Matthews, N. (2017). Levels of measurement. The International Encyclopedia of Communication Research Methods, 1946: 1–7. https://doi.org/10.1002/9781118901731.iecrm0146.
Moe, T. and Pathranarakul, P. (2006). An integrated approach to natural disaster management: Public project management and its critical success factors. Disaster Prevention and Management, 15(3): 396–413. Available at: https://doi.org/10.1108/09653560610669882.
Naoum, S. (2007). Dissertation Research and Writing for Construction Students. 2nd Ed. Oxford: Elsevier.
Nazara, S. and Resosudarmo, B. (2007). Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006. Tokyo: Asian Development Bank Institute. Available at: https://www.adb.org/publications/aceh-niasreconstruction-and-rehabilitation-progress-and-challenges-end-2006.
Niroumand, H., Zain, M. and Jamil, M. (2013). Statistical methods for comparison of data sets of construction methods and building evaluation. Procedia – Social and Behavioral Sciences, 89: 218–221. https://doi.org/10.1016/j.sbspro.2013.08.837.
Norling, B. (2013). Effective time management in post-disaster reconstruction. Paper presented at the Australian and New Zealand Disaster and Emergency Management Conference. Brisbane, Australia, 28 May.
Ophiyandri, T., Amaratunga, D. and Pathirage, C. (2015). Advantages and limitations of community-based post-disaster housing reconstruction project. International Journal of Disaster Resilience in the Built Environment, 7(4): 420– 431. https://doi.org/10.1108/IJDRBE-08-2014-0066.
Ophiyandri, T., Amaratunga, D., Pathirage, C. and Keraminiyage, K. (2013). Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 4(2): 236–249. https://doi.org/10.1108/IJDRBE-03-2013-0005.
Ophiyandri, T., Amaratunga, R.D.G. and Pathirage, C.P. (2010). Community based post disaster housing reconstruction: Indonesian perspective. Paper presented the CIB World Building Congress 2010. Salford Quays, Salford, UK, 10–13 May. Available at: http://usir.salford.ac.uk/9761/.
Oyewobi, L. and Ogunsemi, D. (2010). Factors influencing reworks occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1): 1–20.
Pathirage, C., Seneviratne, K., Amaratunga, D. and Haigh, R. (2012). Managing disaster knowledge: Identification of knowledge factors and challenges. International Journal of Disaster Resilience in the Built Environment, 3(3): 237– 252. https://doi.org/10.1108/17595901211263620.
Qarmout, T. (2017). Delivering Aid Without Government. Cham, Switzerland: Springer.
Richard, J., Adejo, A., James, R. and Luqman, O. (2017). Post disaster housing reconstruction (PDHR) in Ibaji and Lokoja, Kogi State-Nigeria. Malaysian Journal of Civil Engineering, 29(2):194-215.
Santiago, S., Manuela, W., Tan, M., Sa?ez, S. and Tong, A. (2017). Agency-driven post-disaster recovery: A comparative study of three Typhoon Washi resettlement communities in the Philippines. International Journal of Disaster Risk Reduction, 27: 480–489. https://doi.org/10.1016/j.ijdrr.2017.11.012.
Seneviratne, K., Amaratunga, D. and Haigh, R. (2015). Post conflict housing reconstruction. Built Environment Project and Asset Management, 5(4): 432– 445. https://doi.org/10.1108/bepam-08-2014-0034.
Shafique, K. and Warren, C. (2016). Stakeholders and their significance in post natural disaster reconstruction projects: A systematic review of the literature. Asian Social Science, 12(10): 1–17. https://doi.org/10.5539/ass.v12n10p1.
Shelter Cluster (2017). Quantitative Outcome Evaluation of Gaza Shelter Response: Report; Occupied Palestinian Territory. Gaza: Shelter Cluster. Available at: https://www.sheltercluster.org/sites/default/files/docs/quantitative_outcome_evaluation_of_gaza_shelter_response_report.pdf.
Singh, B. and Wilkinson, S. (2008). Post-disaster resource availability following a Wellington earthquake: Aggregates, concrete and cement. In D. Myburgh, E. Seville and S. Wilkinson (eds.), 2008 International i-Rec Conference, Building Resilience: Achieving Effective Post-Disaster Reconstruction. Christchurch, New Zealand: i-Rec.
Soelaksono, A. (2009). NGO and donor coordination to speeds up reconstruction and avoid NGO competition. Paper presented at the 4th Annual International Workshop and Expo on Sumatra Tsunami and Recovery. Banda Aceh, Indonesia, 23–25 November.
Steinberg, F. (2007). Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia-Rebuilding lives. Habitat International, 31(1): 150–166. https://doi.org/10.1016/j.habitatint.2006.11.002.
Tambe, S., Pradhan, S., Donka, P. and Singh, P. (2018). Post-earthquake housing reconstruction in the Sikkim Himalaya: approaches, challenges, and lessons learnt. Development in Practice, 28(5): 647–660. https://doi.org/10.1080/09614524.2018.1469601.
UNDP (United Nation Development Programme) (2017). Three Years After the 2014 Gaza Hostilities: Beyond Survival: Challenges to Economic Recovery and Long-Term Development; UNDP Report. Gaza: UNDP.
Vahanvati, M. and Mulligan, M. (2017). A new model for effective postdisaster housing reconstruction: Lessons from Gujarat and Bihar in India. International Journal of Project Management, 35(5): 802–817. https://doi.org/10.1016/j.ijproman.2017.02.002.
Wilkinson, S., Chang-Richards, A.Y., Seville, E. and Brunsdon, D. (2014). Assisting selfmanaging rebuilding owners in New Zealand to rebuild their homes: Lessons for New Zealand from the 2009 Victoria bush fire recovery. Resilient Organizations Bulletin, 2: 1–5. Available at: http://hdl.handle.net/10092/10963.