Investigating the Strategic Planning of BIM Adoption on Construction Projects in a Developing Country
Main Article Content
Abstract
Strategic planning of building information modelling (BIM) adoption has become increasingly important, owing to the need to minimise BIM adoption risks, maximise BIM benefits and ensure successful BIM adoption. Our understanding of strategic planning of BIM adoption in a developing country is limited. Therefore, this study develops a framework for strategic BIM adoption on construction projects. The applicability of the framework was tested by using it to analyse the pattern of BIM adoption on construction projects in South Africa. The findings of the study demonstrate interrelationships between project milestones and deadlines, the extent of use of BIM software platforms used for the BIM-based construction projects (BBCPs) and the extent of collaboration on the BBCPs. The findings also confirm interrelationships between the regulatory system, the extent of use of BIM software platforms, the extent of collaboration and the extent of integration on the BBCPs. This research has shown that the strategic planning of BIM adoption enables the proper management of BIM tools and processes. The research has also provided practical guidelines for strategic planning of BIM adoption in developing countries.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ahuja, V., Yang, J. and Shankar, R. (2010). IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(2): 159–179. https://doi.org/10.1108/09699981011024678
Baiden, B.K., Price, A.D. and Dainty, A.R. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1): 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001
Bass, J.M., Beecham, S. and Noll, J. (2018). Experience of industry case studies: A comparison of multi-case and embedded case study methods. In Proceedings of the 6th International Workshop on Conducting Empirical Studies in Industry. New York: Association for Computing Machinery, 13–20. https://doi.org/10.1145/3193965.3193967
Bloomberg, M.R., Burney, D.J. and Resnick, D. (2012). BIM Guidelines. New York: New York City Department of Design and Construction, 1–57. Available at: https://arcnovum.de/wp-content/uploads/2015/10/DDC_BIM_Guidelines.pdf
Brockmann, C. and Girmscheid, G. (2007). The complexity of megaprojects. In CIB World Building Congress: Construction for Development: 14–17 May 2007, Cape Town International Convention Centre, South Africa. Cape Town: CIB, 219–230.
Brunet, M., Motamedi, A., Guénette, L.M. and Forgues, D. (2019). Analysis of BIM use for asset management in three public organizations in Québec, Canada. Built Environment Project and Asset Management, 9(1): 153–167. https://doi.org/10.1108/BEPAM-02-2018-0046
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T. and Zhang, W. (2015). Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction, 49: 113–122. https://doi.org/10.1016/j.autcon.2014.10.014
Chatterjee, K., Zavadskas, E., Tamošaitien?, J., Adhikary, K. and Kar, S. (2018). A hybrid MCDM technique for risk management in construction projects. Symmetry, 10(2): 46. https://doi.org/10.3390/sym10020046
Chen, L. and Luo, H. (2014). A BIM-based construction quality management model and its applications. Automation in Construction, 46: 64–73. https://doi.org/10.1016/j.autcon.2014.05.009
Chien, K.F., Wu, Z.H. and Huang, S.C. (2014). Identifying and assessing critical risk factors for BIM projects: Empirical study. Automation in Construction, 45: 1–15. https://doi.org/10.1016/j.autcon.2014.04.012
Elghaish, F. and Abrishami, S. (2020). Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3): 401–420. https://doi.org/10.1108/CI-11-2019-0127
Gerçek, B. (2016). BIM execution process of construction companies for building projects. MSc diss. Izmir Institute of Technology. Available at: http://hdl.handle.net/11147/4867
Gerçek, B., Tokdemir, O.B., ?lal, M.E. and Günayd?n, H.M. (2017). BIM execution process of construction companies for building projects. In E. Pellicer, J.M. Adam, V. Yepes, A. Singh and S. Yazdani (eds.), Resilient Structures and Sustainable Construction. Fargo, ND: ISEC Press. Available at: https://core.ac.uk/download/pdf/324140917.pdf
Hadzaman, N.A.H., Takim, R. and Fadhil, A.H.N.M. (2016). An exploratory study: Building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal, 18(1): 29–40.
Hamieh, A., Makhlouf, A.B., Louhichi, B. and Deneux, D. (2020). A BIM-based method to plan indoor paths. Automation in Construction, 113: 103120. https://doi.org/10.1016/j.autcon.2020.103120
Hammad, D., Rishi, A. and Yahaya, M. (2012). Mitigating construction project risk using Building Information Modelling (BIM). In S. Laryea, S.A. Agyepong, R. Leiringer and W. Hughes (eds.), Procs 4th West Africa Built Environment Research (WABER) Conference. Abuja, Nigeria: WABER, 643–652.
Harun, A.N., Samad, S.A., Nawi, M.N.M. and Haron, N.A. (2016). Existing practices of building information modeling (BIM) implementation in the public sector. International Journal of Supply Chain Management, 5(4): 166–177.
Hrdina, O. and Matejka, P. (2016). BIM execution plan in Czech Republic. Business and Information Technologies, 6: 17–23. https://doi.org/10.14311/bit.2016.02.03
Khoshfetrat, R., Sarvari, H., Chan, D.W. and Rakhshanifar, M. (2020). Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, Forthcoming. https://doi.org/10.1080/15623599.2020.1788759
Latiffi, A.A., Mohd, S., Kasim, N. and Fathi, M.S. (2013). Building information modeling (BIM) application in the Malaysian construction industry. International Journal of Construction Engineering and Management, 2(4A): 1–6. https://doi.org/10.5923/s.ijcem.201309.01
Lee, J.S., Ham, N.H. and Kim, J.J. (2015). A study about BIM execution plan for specialty contractors at construction phase: Focused on specialty contractors in reinforced concrete works. Journal of Korean Institute of Building Information Modeling, 5(3): 19–32. https://doi.org/10.13161/kibim.2015.5.3.019
Lin, Y.C., Chen, Y.P., Huang, W.T. and Hong, C. (2016a). Developing the framework of BIM execution plan for facility management. Journal of Buildings, 6(1): 1–14.
_____. (2016b). Development of BIM execution plan for BIM model management during the pre-operation phase: A case study. Buildings, 6(1): 8. https://doi.org/10.3390/buildings6010008
Liu, Y., Nederveen, S.V. and Hertogh, M. (2017). Understanding the effects of BIM on collaborative design and construction: An empirical study in China. International Journal of Project Management, 35(4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007
Ma, W., Yin, Y., Yang, G., Li, Q. and Lu, B. (2019). Comprehensive performance evaluation method of green materials for coastal buildings based on BIM. Journal of Coastal Research, 93(Supp. 1): 304–309. https://doi.org/10.2112/SI93-040.1
Manenti, E.M., Marchiori, F.F. and Corrêa, L.D.A. (2020). BIM execution plan: Proposal of guidelines for contractors and designers. Ambiente Construído, 20(1): 65– 85. https://doi.org/10.1590/s1678-86212020000100363
Manley, K. (2008). Against the odds: Small firms in Australia successfully introducing new technology on construction projects. Research Policy, 37(10): 1751–1764. https://doi.org/10.1016/j.respol.2008.07.013
McArthur, J.J. and Sun, X. (2015). Best practices for BIM execution plan development for a public-private partnership design-build-finance-operate-maintain project. WIT Transition on the Built Environnement, 149: 119–130. http://doi.10.2495/BIM150111
Messner, J., Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Leicht, R.M., Saluja, C. and Nizic, N. (2011). BIM Project Execution Planning Guide: Version 2.1. Pennsylvania: The Computer Integrated Construction Research Group, The Pennsylvania State University.
Minunno, R., O’Grady, T., Morrison, G.M. and Gruner, R.L. (2020). Exploring environmental benefits of reuse and recycle practices: A circular economy case study of a modular building. Resources, Conservation and Recycling, 160: 104855. https://doi.org/10.1016/j.resconrec.2020.104855
Mohamed, A.G., Abdallah, M.R. and Marzouk, M. (2020). BIM and semantic web-based maintenance information for existing buildings. Automation in Construction, 116: 103209. https://doi.org/10.1016/j.autcon.2020.103209
Muhammad, M.Z. and Mustapa, M. (2020). A review of facilities information requirements towards enhancing building information modelling (BIM) for facilities management (FM). IOP Conference Series: Materials Science and Engineering, 884(1): 012033. https://doi.org/10.1088/1757-899X/884/1/012033
Okakpu, A., Ghaffarianhoseini, A., Tookey, J., Haar, J., Ghaffarianhoseini, A. and Rehman, A.U. (2020). Risk factors that influence the adoption of Building Information Modelling (BIM) for the refurbishment of complex building projects: Stakeholders’ perceptions. International Journal of Construction Management, Forthcoming. https://doi.org/10.1080/15623599.2020.1795985
Olugboyega, O. and Windapo, A. (2019). Characterising BIM-based construction projects: A strategic and contingent BIM application model. Journal of Construction Project Management and Innovation, 9(1): 33–55.
Pan, M., Linner, T., Pan, W., Cheng, H. and Bock, T. (2018). A framework of indicators for assessing construction automation and robotics in the sustainability context. Journal of Cleaner Production, 182: 82–95. https://doi.org/10.1016/j.jclepro.2018.02.053
Peansupap, V. and Walker, D.H. (2006). Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3): 321–332. https://doi.org/10.1080/01446190500435317
Pena-Mora, F., Vadhavkar, S., Perkins, E. and Weber, T. (1999). Information technology planning framework for large-scale projects. Journal of Computing in Civil Engineering, 13(4): 226–237. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(226)
Porwal, A. and Hewage, K.N. (2013). Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction, 31: 204–214. https://doi.org/10.1016/j.autcon.2012.12.004
Pruskova, K. and Kaiser, J. (2019). Implementation of BIM technology into the design process using the scheme of BIM execution plan. Materials Science and Engineering, 471(2): 022019. https://doi.org/10.1088/1757-899X/471/2/022019
Qazi, A., Quigley, J., Dickson, A. and Kirytopoulos, K. (2016). Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk pathsin construction projects. International Journal of Project Management, 34(7): 1183–1198. https://doi.org/10.1016/j.ijproman.2016.05.008
Qiang, C. (2012). BIM adoption risk study in building design project. Journal of Information Technology in Civil Engineering and Architecture, 4(1): 22.
Ramírez-Sáenz, J.A., Gómez-Sánchez, J.M., Tienda, J.L.P., Cortés, J.P.R. and Bucheli, L.G. (2018). Requirements for a BIM execution plan (BEP): A proposal for application in Colombia. Building and Management, 2(2): 5–14. https://doi.org/10.20868/bma.2018.2.3763
Rehman, Sami, M., Thaheem, M.J., Nasir, A.R. and Khan, K.I.A. (2020). Project schedule risk management through building information modelling. International Journal of Construction Management, Forthcoming. https://doi.org/10.1080/15623599.2020.1728606
Ryd, N. (2014). Construction clients challenges: Emphasizing early stages. Procedia – Social and Behavioral Sciences, 119: 134–141. https://doi.org/10.1016/j.sbspro.2014.03.017
Saluja, C. (2009). A process mapping procedure for planning building information modelling (BIM) execution on a building construction project. Available at: https://etda.libraries.psu.edu/files/final_submissions/1180
Shelbourn, M., Bouchlaghem, N.M., Anumba, C. and Carrillo, P. (2007). Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4): 357–377. https://doi.org/10.1108/14714170710780101
Singh, A.S. and Masuku, M.B. (2014). Sampling techniques and determination of sample size in applied statistics research: An overview. International Journal of Economics, Commerce and Management, 2(11): 1–22.
Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3): 357– 375. https://doi.org/10.1016/j.autcon.2008.10.003
Sun, C., Man, Q. and Wang, Y. (2015). Study on BIM-based construction project cost and schedule risk early warning. Journal of Intelligent and Fuzzy Systems, 29(2): 469–477. https://doi.org/10.3233/IFS-141178
Tulenheimo, R. (2015). Challenges of implementing new technologies in the world of BIM: Case study from construction engineering industry in Finland. Procedia Economics and Finance, 21: 469–477. https://doi.org/10.1016/S2212-5671(15)00201-4
Wood, H. and Ashton, P. (2010). Modeling project complexity. In Proceedings 26th Annual ARCOM Conference. Leeds, UK: Association of Researchers in Construction Management (ARCOM), 1101–1110.
Wu, W. and Issa, R.R. (2015). BIM execution planning in green building projects: LEED as a use case. Journal of Management in Engineering, 31(1): A4014007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000314
Yang, L.R., Huang, C.F. and Wu, K.S. (2011). The association among project manager’s leadership style, teamwork and project success. International Journal of Project Management, 29(3): 258–267. https://doi.org/10.1016/J.IJPROMAN.2010.03.006
Zandieh, M., Kani, I.M., Hessari, P. and Kirkegaard, P.H. (2016). Adoption of BIM systems in the AEC industry. Ponte Academic Journal, 72(9): 123–135. https://doi.org/10.21506/j.ponte.2016.9.9
Zanni, M.A., Soetanto, R. and Ruikar, K. (2014). Defining the sustainable building design process: Methods for BIM execution planning in the UK. International Journal of Energy Sector Management, 8(4): 562–587. https://doi.org/10.1108/IJESM-04-2014-0005
Zhao, X., Wu, P. and Wang, X. (2018). Risk paths in BIM adoption: Empirical study of China. Engineering, Construction and Architectural Management, 25(9): 1170–1187. https://doi.org/10.1108/ECAM-08-2017-0169