Information Technology as Catalyst for Value Re-Engineering Implementation in the Nigerian Construction Industry
Main Article Content
Abstract
Technological development has placed pressure on construction industry. Reviewing its activities due to an increase in a globally competitive market has manifested from the construction environment’s changing need to meet customer satisfaction. These pose challenges to many construction industries in developing countries to improve the quality of the product produced to meet the customer’s needs. The study aims to examine the impact of information technology (IT) application on value re-engineering (VRE) implementation that gives rise to customer value addition, through enhanced profitability performance and cost reduction for the construction industry to offer benefits for customers to achieve satisfaction. Using purposive sampling techniques, the subjectivist methodology was utilised to establish critical success factors in 40 purposefully sampled building construction operators within Abuja, Nigeria. The result further revealed that quality design and collaborative working among the VRE practitioners help the customer to derive the benefit of waste reduction by achieving a value-added perspective using high technology that influences both design and construction operations for the project. Early dissemination of information and design adequacy reduces pressure on both materials and labour scarcity. Finally, there is a significant need for the construction process to be re-engineered through the utility of change enablers and the introduction of assistive technologies like IT as drivers of VRE implementation on value addition that give rise to customer-derived benefits.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abanda, F.H., Zhou, W., Tah., J.H.M. and Cheung, F. (2013). Exploring the relationships between linked open data and building information modelling. Paper presented at the Sustainable Building Conference 2013. Coventry University United Kingdom, 3–5 July.
AbdEllatif, M., Farhan, M.S. and Shehata, N.S. (2018). Overcoming business process reengineering obstacles using ontology-based knowledge map methodology. Future Computing and Informatics Journal, 3(1): 7–28. https://doi.org/10.1016/j.fcij.2017.10.006
Abdul-Samad, Z. and Kulandaisamy, P.P. (2022). Cost management for information and communication technology projects. Journal of Engineering, Project and Production Management, 12(2): 166–178. https://doi.org/10.32738/jeppm-2022-0015
Adriaanse, A., Voordijk, H. and Dewulf, G. (2010). The use of interorganisational ICT in construction projects: A critical perspective. Construction Innovation, 10(2): 223–237. https://doi.org/10.1108/14714171011037200
Afzal, M. and Shafiq, M.T. (2021). Evaluating 4D-BIM and VR for effective safety communication and training: A case study of multilingual construction job-site crew. Buildings, 11(8): 319. https://doi.org/10.3390/buildings11080319
Akingbade, W.A. (2014). Business process re-engineering and customer responses in selected food and beverages companies in Lagos. Review of Public Administration and Management, 3(5): 76–92.
Akinradewo, O.F., Bamidele, O.A. and Ogunsemi, D.R. (2022). Assessment level of compliance with public procurement act. Journal of Engineering, Project and Production Management, 12(2): 126–136. https://doi.org/10.32738/jeppm-2022-0012
Alumbugu, P.O., Shakantu, W.W.M. and Tsado, A.J. (2020). Analysis of outbound logistics channels for construction material. Journal of Engineering, Project and Production Management, 10(1): 19–26.
Anand, A., Wamba, S.F. and Gnanzou, D. (2013). A literature review on business process management, business process reengineering and business process innovation. Paper presented at the 9th International Workshop on Enterprise and Organizational Modeling and Simulation (EOMAS) held at International Conference on Advanced Information Systems Engineering (CAiSE). Berlin, 17 June.
Asif, A., Islam, M.D. and Uddin, M.D. (2010). Steps of business process reengineering: Hypothetical application to RMG business. SSRN Electronic Journal. https://doi.org/10.2139/ssrn.1699735
Berawi, M.A. and Susantono, B. (2013). Developing conceptual design of mega infrastructure project: Creating innovation and added value. Paper presented at the Value World, The American Society of Value Engineering (SAVE) International Conference. Washington, 24–27 June.
Budiono, A. and Loice, R. (2012). Business process reengineering in motorcycle workshop X for business sustainability. Procedia Economics and Finance, 4: 33–43. https://doi.org/10.1016/S2212-5671(12)00318-8
Chandra S. (2014). Maximizing Construction and Investment Budget Project Efficiency with Value Engineering. Jakarta: Publisher PT. Elex Media Komputindo.
Chen, C.L. (2019). Value creation by SMEs participating in global value chains under industry 4.0 trend: Case study of textile industry in Taiwan. Journal of Global Information Technology Management, 22(2): 120–145. https://doi.org/10.1080/1097198X.2019.1603512
Chen, J.H, Yang, L.R. and Tai, H.W. (2016). Process reengineering and improvement for building precast production. Automation in Construction, 68: 249–258. https://doi.org/10.1016/j.autcon.2016.05.015
Chen, Y.C. (2001). Empirical modelling for participative business process reengineering. PhD diss. University of Warwick.
Crotty, R. (2012). The Impact of Building Information Modelling: Transforming Construction. New York: Spon Press.
Datti, Y.U., Zawawi, N.A.W.A., Umar, A.A., Sutanto, M. H. and Danyaro, K.U. (2022). Challenges of maturity models in public-private partnerships (PPPs) in the post-COVID-19 era. Journal of Engineering, Project and Production Management, 12(2): 149–165. https://doi.org/10.32738/jeppm-2022-0014
Davenport, T.H. and Short, J.E. (1990). The new industrial engineering: information technology and business process redesign. Available at: https://sloanreview.mit.edu/article/the-new-industrial-engineering-information-technology-and-business-process-redesign/ [Accessed on 25 June 2019].
Demirkesen, S. and Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of Project Management. 35(8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008
Ding, Z., Jiang, S., Ng, F. and Zhu, M. (2017). A new TRIZ-based patent knowledge management system for construction technology innovation. Journal of Engineering, Design and Technology, 15(4): 456–470. https://doi.org/10.1108/JEDT-03-2016-0017
Dumas, M., Rosa, M.L., Mendling, J. and Reijers, H.A. (2017). Process redesign. In Fundamentals of Business Process Management. Berlin: Springer, 253–296.
Egwunatum, S.I. and Oboreh, J.C. (2022). Factors limiting knowledge management among construction small and medium enterprises. Journal of Engineering, Project and Production Management, 12(1): 25–38. https://doi.org/10.32738/JEPPM-2022-0003
Eliwa, H.K., Jelodar, M.B. and Poshdar, M. (2022). Information and communication technology (ICT) utilization and infrastructure alignment in construction organizations. Buildings, 12(3): 1–19. https://doi.org/10.3390/buildings12030281
Emuze, E., Smallwood, J. and Han, S. (2014). Factors contributing to non-value adding activities in South African construction. Journal of Engineering, Design and Technology, 12(2): 223–243. https://doi.org/10.1108/JEDT-07-2011-0048
Ferrada, X. and Serpell, A. (2013). Using organizational knowledge for the selection of construction methods. International Journal of Managing Projects in Business, 6(3): 604–614. https://doi.org/10.1108/IJMPB-10-2012-0061
Foster, S.T. (2017). Managing Quality: Integrating the Supply Chain. 6th Ed. Edinburgh: Pearson.
Habib, M.N. (2013). Understanding critical success and failure factors of business process reengineering. International Review of Management and Business Research, 2(1): 1–10.
Hammer, M. (1990). Re-engineering work: Don’t automate, obliterate. Available at: https://hbr.org/1990/07/reengineering-work-dont-automate-obliterate [Accessed on 14 April 2019].
Harini, M.W., Erizal and Widyarti, M. (2018). Implementation of value engineering for construction efficiency. Asian Journal of Applied Sciences, 6(2): 71–77.
Huang, T., Kong C.W., Guo, H.L, Baldwin, A. and Li, H. (2007). A virtual prototyping system for simulating construction processe. Automation in Construction, 16(5): 576–585. https://doi.org/10.1016/j.autcon.2006.09.007
Jamil, A.H.A. and Fathi, M.S. (2016). The integration of lean construction and sustainable construction: A stakeholder perspective in analyzing sustainable lean construction strategies in Malaysia. Procedia Computer Science, 100: 634–643. https://doi.org/10.1016/j.procs.2016.09.205
Jibrin, I. and Shakantu, W. (2021). Implementation of the value re-engineering concept in the Nigerian construction industry: Exploratory study. Acta Structilia, 28(1): 69–91. https://doi.org/10.18820/24150487/as28i1.3
Jibrin, I.A.M. (2021). Value reengineering in the Nigerian construction industry. PhD diss. Nelson Mandela University.
Kassim, Y.H. (2012). Information technology business value model for engineering and construction industry. PhD diss. University of Salford.
Kembuan, S. (2016). Application of value engineering in construction project Syaloom Karombasan GMIM church. Civil Journal Static, 4: 95–103.
Leedy, P.D. and Ormrod, J.E. (2015). Practical Research Planning and Design. 11th Ed. London: Pearson.
Madane, S. and Joshi, D. (2018). Business process re-engineering in construction industry: Present scenario. International Research Journal of Engineering and Technology (IRJET), 5(7): 1843–1846.
Mandičák, T., Mésároš, P. and Spišáková, M. (2021). Impact of information and communication technology on sustainable supply chain and cost reducing of waste management in Slovak construction. Sustainability, 13(14): 1–19. https://doi.org/10.3390/su13147966
Mao, X. and Zhang, X. (2008). Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5): 371–381. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(371)
Mark, S. and Mordechai, S. (2011). Application of Monte Carlo Method in Science and Engineering. Rijeka, Croatia: InTech.
Mesároš, P. and Mandičák, T. (2017). Impact of ICT on performance of construction companies in Slovakia. Materials Science and Engineering, 245(7): 1–9. https://doi.org/10.1088/1757-899X/245/7/072044
Mlay, S.V., Zlotnikova, I. and Watundu, S. (2013). A quantitative analysis of business process reengineering and organizational resistance: The case of Uganda impacting factors. The African Journal of Information Systems, 5(1): 1–25.
Mordechai, S. (2011). Application of Monte Carlo Method in Science and Engineering. Rijeka, Croatia: InTech. https://doi.org/10.5772/1954
National Bureau of Statistics (2019). Nigerian annual report of NBS for economic planning. Available at: https://nigeria.opendataforafrica.org [Accessed on 20 June 2019].
Nawi, M.N.M., Radzuan, K., Salleh, N.A. and Ibrahim, S.H. (2014). Value management: A strategic approach for reducing faulty design and maintainability issue in IBS building. Advances in Environmental Biology, 8(5): 1859–1863.
Nelson, M.M., Lee, A., Cooper, R., Kagioglou, M. and Fleming, A. (2014). Process re-engineering in the construction industry: Buzzword or reality? Available at: https://www.academia.edu/3149307/PROCESS_RE_ENGINEERING_IN_THE_CONSTRUCTION_INDUSTRY_BUZZWORD_OR_REALITY [Accessed on 11 May 2019].
Noor, B.A. and Yi, S. (2018). Review of BIM literature in construction industry and transportation: Meta-analysis. Construction Innovation, 18(4): 433–452. https://doi.org/10.1108/CI-05-2017-0040
Oke, A.E., Aghimien, D.O. and Olatunji, S.O. (2015). Implementation of value management as an economic sustainability tool for building construction in Nigeria. International Journal of Managing Value and Supply Chains (IJMVSC), 6(4): 55–64. https://doi.org/10.5121/ijmvsc.2015.6405
Olanrewaju, A.A. (2013). A critical review of value management and whole life costing on construction projects. International Journal of Facility Management, 4(1): 1–12.
Ozorhon, B., Abbott, C., Aouad, G. and Powell, J. (2010). Innovation in Construction: A Project Life Cycle Approach. Salford: University of Salford.
Park, S.C. and Ryoo, S.Y. (2013). An empirical investigation of end-users’ switching toward cloud computing: A two factor theory perspective. Computers in Human Behavior, 29: 160–170. https://doi.org/10.1016/j.chb.2012.07.032
Potts, K. and Ankrah, N. (2014.) Construction Cost Management: Learning from Case Studies. London/New York: Routledge.
Petrovic, O. and Zsifkovits, H. (1994). Business process re-engineering: Information systems opportunities and challenges. In B.C. Glasson, I. Hawryszkiewycz, A. Underwood and R.A. Weber (eds.), Business Process Re-Engineering as an Enabling Factor for Lean Management. Holland: IFIP, 481–493.
Puruhita, H.W. (2018). The readiness of building construction companies to implement re-engineering in Surakarta region. AIP Conference Proceedings, 1977(1). https://doi.org/10.1063/1.5042957
Rahali, E., Chaczko, Z., Agbinya, J. and Chiu, C. (2008). Business process re-engineering in Saudi Arabia: A survey of understanding and attitudes. Paper presented at the 2008 International Conference on Broadband Communications, Information Technology and Biomedical Applications. Pretoria, South Africa, 23–26 November.
Ringim, J.K., Razalli, M.R. and Hasnan, N. (2012). Moderating effect of Information Technology (IT) capability on the relationship between business process reengineering factors and organizational performance of bank. African Journal of Business Management, 6(16): 5551–5567. https://doi.org/10.5897/AJBM11.2792
. (2011). Effect of business process reengineering factors on organizational performance of Nigerian banks: Information technology capability as the moderating factor. International Journal of Business and Social Science, 2(13): 198–201.
Shakantu, W. (2012). Key drivers of change and their implications for construction management research in the next decade: An eclectic approach. Paper presented at the Professorial Inaugural Lecture. Nelson Mandela Metropolitan University, 9 October.
Shakantu, W.W., Jibrin, I.M. and Saidu, I. (2022). Factors militating against implementation of value reengineering in the construction industry. Journal of Engineering, Project and Production Management, 12(1): 87–100. https://doi.org/10.32738/jeppm-2022-0008
Soares, R. (2013). Reengineering management of construction projects. International Journal of Business and Social Science, 4(7): 1–6.
Stylidis, K., Wickman, C. and Söderberg, R. (2015). Defining perceived quality in the automotive industry: An engineering approach. Procedia CIRP, 36: 165–170. https://doi.org/10.1016/j.procir.2015.01.076
Suzanne, M. (2018). Customer perceived value in high growth firms. Cuadernos de Economía, 37(75): 755–778. https://doi.org/10.15446/cuad.econ.v37n75.68913
Teng, J.T.C., Grover, V. and Fiedler, K.D. (1994). Re-designing business processes using information technology. Long Range Planning, 27(1): 95–106. https://doi.org/10.1016/0024-6301(94)90010-8
Wu, L.Y., Chen, K.Y., Chen, P.Y. and Cheng, S.L. (2014). Perceived value, transaction cost and repurchase-intention in online shopping: A relational exchange perspective. Journal of Business Research, 67(1): 2768–2776. https://doi.org/10.1016/j.jbusres.2012.09.007
Zahrizan, Z., Ali, N.M., Haron, A.T., Marshall-Ponting, A. and Hamid, Z.A. (2013). Exploring the adoption of building information modelling (BIM) in the Malaysian construction industry: A qualitative approach. International Journal of Research in Engineering and Technology (IJRET), 2(8): 384–395. https://doi.org/10.15623/ijret.2013.0208060
Zuboff, S. (1988). In the Age of the Smart Machine: The Future of Work and Power. New York: Basic Books.