Critical Factors Contributing to Budget Overruns in Ghana’s Telecommunication Industry Construction Projects
Main Article Content
Abstract
This study sought to examine the occurrence of and the most critical factors that cause budget overruns in Ghana’s telecommunications industry construction projects by applying an exploratory sequential mixed method approach. A multiple case study approach was initially adopted to ensure a greater understanding of the differences and similarities between four cases drawn from companies engaged in the construction of network expansion projects. This was followed by a survey of 230 practitioners responsible for managing construction projects within the industry. The software program, ATLAS.ti, Statistical Package for the Social Sciences (SPSS) and AMOS version 25.0 were used in the data analysis. Exploratory factor analysis and structural equation modelling were performed to test and validate the hypothetical model developed to illustrate the most critical factors that cause budget overruns. The findings resulted in the final model dubbed “Budget Overrun Flowerpot”, which provides practitioners with a better understanding of the most critical causal factors that must be managed appropriately to improve project efficiency and budget performance.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abdellatif, H. and Alshibani, A. (2019). Major factors causing delay in the delivery of manufacturing and building projects in Saudi Arabia. Buildings, 2(9): 1–15. https://doi.org/10.3390/buildings9040093
Adafin, J., Rotimi, J.O.B. and Wilkinson, S. (2020). An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1): 41–61. https://doi.org/10.1108/JEDT-03-2019-0056
Aljohani, A., Ahiaga-Dagbui, D. and Moore, D. (2017). Construction projects cost overrun: What does the literature tell us? International Journal of Innovation, Management and Technology, 8(2): 137–143. https://doi.org/10.18178/ijimt.2017.8.2.717
Ameh, O.J., Soyingbe, A.A. and Odusami, K.T. (2010). Significant factors causing cost overruns in telecommunications projects in Nigeria. Journal of Construction in Developing Countries, 15(2): 49–67.
Annamalaisami, C.D. and Kuppuswamy, A. (2019). Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6): 1079–1089. https://doi.org/10.1080/15623599.2019.1683689
Asiedu, R.O., Adaku, E. and Owusu-Manu, D.G. (2017). Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(3): 363–380. https://doi.org/10.1108/CI-01-2016-0003
Balali, A., Moehler, R.C. and Valipour, A. (2020). Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: An Iranian case study. International Journal of Construction Management, 22(13): 2577–2585. https://doi.org/10.1080/15623599.2020.1811465
Baxter, P. and Jack, S. (2008). Qualitative case study methodology: Study design and implementation for novice researchers. The Qualitative Report, 13(4): 544–556. https://doi.org/10.46743/2160-3715/2008.1573
Bongomin, G.C.O. (2016). Financial inclusion of the poor in Uganda. PhD diss. Makerere University.
Bryman, A. and Cramer, D. (2011). Quantitative Data Analysis with IBM SPSS: AGuidefor Social Scientists. New York: Routledge. https://doi.org/10.4324/9780203180990
Byrne, B.M. (2013). Structural Equation Modelling with AMOS: Basic Concepts, Applications and Programming. New York: Routledge.
. (2010). Structural Equation Modelling with AMOS: Basic Concepts, Applications and Programming. 2nd Ed. New York: Routledge. https://doi.org/10.4324/9780203805534
Chenail, R.J. (2012). Conducting qualitative data analysis: Qualitative data analysis as a metaphoric process. The Qualitative Report, 17(1): 248–253. https://doi.org/10.46743/2160-3715/2012.1818
Cheng, Y.M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5): 850–860. https://doi.org/10.1016/j.ijproman.2013.10.003
Creswell, J.W. (2014). Research design: Qualitative, Quantitative and Mixed Methods Approaches. 4th Ed. London: Sage Publications Ltd.
. (2002). Educational Research: Planning, Conducting and Evaluating Quantitative and Qualitative Research. Upper Saddle River, NJ: Pearson Education.
Danso, H. and Antwi, J.K. (2012). Evaluation of the factors influencing time and cost overruns in telecommunication tower construction in Ghana. International Journal of the Institute for Science, Technology and Education, 2(6): 15–24.
Deloitte and Touche LLP (2012). Risk assessment in practice. Available at: https:www2.deloitte.com/content/dam/Deloitte/global/Documents/Governance-Risk-Compliance/dttl-grc-riskassessmentinpractice.pdf [Accessed on 31 July 2021].
Durdyev, S., Omarov, M., Ismail, S. and Lim, M. (2017). Significant contributors to cost overruns in construction projects of Cambodia. Cogent Engineering, 4(1): 1–10. https://doi.org/10.1080/23311916.2017.1383638
Eisenhardt, K.M. (1989). Building theories from case study research. Academy of Management Review, 14(10): 532–550. https://doi.org/10.2307/258557
Field, A. (2005). Discovering Statistics Using SPSS. 2nd Ed. London: Sage Publications.
Fornell, C. and Larcker, D.F. (1981). Evaluating structural equation models with unobservable variables and measurement error. Journal of Marketing Research, 18(1): 39–50. https://doi.org/10.1177/002224378101800104
Fuller, C.M., Simmering, M.J., Atinc, G., Atinc, Y. and Babin, B.J. (2016). Common methods variance detection in business research. Journal of Business Research, 69(8): 3192–3198. https://doi.org/10.1016/j.jbusres.2015.12.008
Garson, D. 2008. Data imputation for missing values. Available at: https://faculty.chass.ncsu.edu/garson/PA765/missing.htm. [Assessed on 31 July 2021].
GCT (Ghana Chamber of Telecommunications) (2020). Focus on output tax instead of industry specific taxes-chamber of telecommunication tells government. Available at: https://www.telecomschamber.com/news-media/industry-news/focus-on-output-tax-instead-of-industry-specific-taxes-Chamber-of-telecommunications-tells-government [Accessed on 21 March 2020].
Ghana Statistical Service (2014). Gross domestic product 2014. Available at: http://www.statsghana.gov.gh/ [Accessed on 15 June 2019].
GNA (Ghana News Agency) (2017). MTN to invest 143.7 million in network expansion in 2017. Available at: https://www.modernghana.com/news/785461/mtn-to-invest-1437-million-in-network-expansion.html [Accessed on 13 April 2019].
Hair, J.F., Anderson, R.E., Babin, B.J., Tatham, R.L. and Black, W.C. (2018). Multivariate Data Analysis. 8th Ed. India: Cengage.
Hameme, N.A.A. (2017). Structural equation modelling: Confirmatory factor analysis [PowerPoint slides]. https://doi.org/10.13140/RG.2.2.25615.38565
Herrera, R.F., Sánchez, O., Castañeda, K. and Porras, H. (2020). Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis. Applied Sciences, 10(16): 1–25. https://doi.org/10.3390/app10165506
Hooper, D., Coughlan, J. and Mullen, M.R. (2008). Structural equation modelling: Guidelines for determining model fit. Electronic Journal of Business Research Methods, 6(1): 53–60.
Hoyle, R.H. (2011). Structural Equation Modelling for Social and Personality Psychology. London: Sage. https://doi.org/10.4135/9781446287965
Huo, T., Ren, H., Cai, W., Shen, G.Q., Liu, B., Zhu, M. and Wu, H. (2018). Measurement and dependence analysis of cost overruns in mega transport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering Management, 144(3): 1–10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001444
IMANI (2017). IMANI telecoms series: Ghana’s telecommunication licensing regime stifling innovation and internet affordability: What should be done. Available at: https://imaniafrica.org/2017/08/07/ghanas-telecommunication-licensing-regime-stifling-innovation-and-internet-affordability/ [Accessed on 16 November 2020].
Islam, M.R. (2018). Sample size and its role in Central Limit Theorem (CLT). Computational and Applied Mathematics Journal, 1(1): 37–47.
Johnson, R.M. and Babu, R.I.I. (2020). Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5): 402–411. https://doi.org/10.1080/15623599.2018.1484864
Kishabale, B. and Hassan, S.S. (2018). A predictive study on instructional design quality, learner satisfaction and continuance learning intention with e-learning courses: Data screening and preliminary analysis. Interdisciplinary Journal of Education, 1(2): 122–137. https://doi.org/10.53449/ije.v1i2.59
Kline, R.B. (2016). Principle and Practice of Structural Equation Modelling. 4th Ed. New York: The Guilford Press.
. (2011). Principles and Practice of Structural Equation Modelling. New York: Guilford Press.
Koyuncu, I. and Kılıç, A. (2019). The use of exploratory and confirmatory factor analyses: A document review. Education and Science, 44(198): 361–388. https://dx.doi.org/10.15390/EB.2019.7665
López, S.P., Peón, J.M.M. and Ordás, C.J.V. (2006). Human resource management as a determining factor in organizational learning. Management Learning, 37(2): 215–239.
Martinsuo, M., Klakegg, O.J. and Marrwijk, A.V. (2019). Editorial: Delivering value in projects and project-based business. International Journal of Project Management, 37(5): 631–635. https://doi.org/10.1016/j.ijproman.2019.01.011
Memon, A.H., Rahman, I.A. and Azis, A.A.A. (2012). The cause factors of large project’s cost overrun: A survey in the southern part of Peninsular Malaysia. International Journal of Real Estate Studies, 7(2): 1–16.
Miles, M.B., Huberman, A.M. and Saldana, J. (2014). Qualitative Data Analysis: A Sourcebook of New Methods. 3rd Ed. Thousand Oaks, CA: Sage Publications.
Mishra, R. and Mishra, O.N. (2019). Factor influencing flexibility in new product development: Empirical evidence from Indian manufacturing firms. Journal of Business and Industrial Marketing, 34(5): 1005–1015. https://doi.org/10.1108/ JBIM-06-2018-0186
Novak, J. and Cañas, A. (2006). The theory underlying concept maps and how to construct them. Technical report IHMC CmapTools. Florida Institute for Human and Machine Cognition, US. Available at: https://cmap.ihmc.us/Publications/ResearchPapers/TheoryUnderlying ConceptMaps.pdf [Accessed on 11 April 2019].
Offei, I., Kissi, E. and Nani, G. (2019). Factors affecting the capacity of small to medium enterprises (SME) building construction firms in Ghana. Journal of Construction in Developing Countries, 24(1): 49–63. https://doi.org/10.21315/ jcdc2019.24.1.3
Olawale, Y. and Sun, M. (2014). Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management, 33(3): 623–637. https://doi.org/10.1016/j.ijproman.2014.10.003
Patel, V.V. (2015). Exploratory factor analysis: Using SPSS. Available at: https://www.researchgate.net/publication/303685086_EXPLORATORY_FACTOR_ ANALYSIS_USING_SPSS [Accessed on 23 March 2019].
PMI (Project Management Institute) (2017). PMBoK Guide: A Guide to the Project Management Body of Knowledge. 6th Ed. Newtown Square, PA: PMI.
Podsakoff, P.M., MacKenzie, S.B. and Podsakoff, N.P. (2012). Sources of method bias in social science research and recommendations on how to control it. Annual Review of Psychology, 63(1): 539–569. https://doi.org/10.1146/annurev-psych-120710-100452
Rosenfeld, Y. (2014). Root-cause analysis of construction-cost overruns. Journal of Construction and Engineering Management, 140(1): 04013039. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000789
Rosseni, D. (2014). Construction and Modeling of Teaching Systems. Selangor, Malaysia: Universiti Kebangsaan Malaysia Publishers.
Saunders, M., Lewis, P. and Thornhill, A. (2012). Research Methods for Business Students. 6th Ed. Harlow, UK: Pearson Education Limited.
Seddeeq, A.B., Assaf, S., Abdallah, A. and Hassanain, M.A. (2019). Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings, 9(2): 1–17. https://doi.org/10.3390/buildings9020041
Sekaran, U. (2003). Research Methods for Business. 4th Ed. Hoboken, NJ: John Wiley & Sons.
Shehu, Z., Endut, I.R., Akintoye, A. and Holt, G.D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8): 1471–1480. https://doi.org/10.1016/j.ijproman.2014.04.004
Simushi, S. and Wium, J. (2020). Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1): 129–146. https://doi.org/10.21315/jcdc2020.25.1.7
Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management, 32(1): 101–115. https://doi.org/10.1016/j.ijproman.2013.03.004
Yamane, T. (1967). Statistics: An Introductory Analysis. 2nd Ed. New York: Harper and Row.
Yin, R.K. (2018). Case Study Research: Design and Methods. 6th Ed. Thousand Oaks, CA: Sage.