Construction Disputes Causes and Resolution Methods: A Case Study from a Developing Country

Main Article Content

Sandra Matarneh

Abstract

The increasing complexity of the construction industry, characterised by diverse multidisciplinary project teams, various stakeholders, distinctive site conditions and uncertainties, can contribute to an antagonistic environment, which may result in disputes arising between the contractual parties. Identifying the most common causes of disputes is important for an efficient contract management process. This study aims to help project stakeholders incorporate consolidative contract management strategies before commencing a new project by identifying the most common causes of construction disputes in Jordanian construction projects. Key causative factors of disputes were analysed through a literature review, a questionnaire survey and a case study analysis of construction projects in Jordan. The results revealed that the main factors leading to disputes in Jordan are incomplete technical drawings/specifications, variations initiated by the owner/consultant (additive/ deductive) and errors and omissions in the contract documents. Moreover, the results show that the most popular methods of dispute resolution in the Jordanian construction industry are negotiation and arbitration. The findings can enable local and international construction stakeholders to initiate contract management strategies before commencing projects. More effective planning can help to reduce the negative impacts of known causes of disputes.

Article Details

How to Cite
Sandra Matarneh. 2024. “Construction Disputes Causes and Resolution Methods: A Case Study from a Developing Country”. Journal of Construction in Developing Countries 29 (1): 139-61. https://doi.org/10.21315/.
Section
Articles

References

Abwunza, A., Kivaa, T. and Muigua, K. (2021). Explaining the effectiveness of

construction arbitration: An organizational justice perspective. Journal of

Legal Affairs and Dispute Resolution in Engineering and Construction, 13:

https://doi.org/10.1061/(ASCE)LA.1943-4170.0000479

Acharya, N.K., Lee, Y.D. and Kim, J.K. (2006). Critical construction conflicting

factors identification using analytical hierarchy process. KSCE Journal of Civil

Engineering, 10: 165−174. https://doi.org/10.1007/BF02824057

Adnan, H., Shamsuddin, S.M., Supardi, A. and Ahmad, N. (2012). Conflict prevention

in partnering projects. Procedia − Social and Behavioral Sciences, 35: 772−781.

https://doi.org/10.1016/j.sbspro.2012.02.148

Alamri, N., Amoudi, O. and Njie, G. (2017). Analysis of construction delay causes in

dams projects in Oman. European Journal of Business and Social Sciences,

(2): 19−42.

Alkhamali, K., Motawa, I. and Ogunlana, S.O. (2010). Cultural factors influencing

disputes in public construction. In P. Barrett, D. Amaratunga, R. Haigh, K.

Keraminiyage and C. Pathirage (eds.), Proceedings W113 − Special Track

th CIB World Building Congress 2010. Salford: Commercial International

Bank, 475−488.

Almutairi, S., Kashiwagi, J., Kashiwagi, D. and Sullivan, K. (2015). Factors causing

construction litigation in Saudi Arabia. Journal for the Advancement of

Performance Information and Value, 7: 58.

Alshahrani, S. (2017). Dispute resolution methods in the construction industry sector

in the Kingdom of Saudi Arabia. MATEC Web of Conferences, 138: 02015.

Aryal, S. (2018). A review of causes and effects of dispute in the construction projects

of Nepal. Journal of Steel Structure and Construction and Building Materials,

: 144. https://doi.org/10.4172/2472-0437.1000144

Assaf, S., Hassanain, M.A., Abdallah, A., Sayed, A.M.Z. and Alshahrani, A. (2019).

Significant causes of claims and disputes in construction projects in Saudi

Arabia. Built Environment Project and Asset Management, 9(5): 597−615.

https://doi.org/10.1108/BEPAM-09-2018-0113

Awwad, R., Barakat, B. and Menassa, C. (2016). Understanding dispute resolution

in the Middle East region from perspectives of different stakeholders. Journal

of Management in Engineering, 32: 05016019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000465

Cakmak, E. and Irlayici Cakmak, P. (2014). An analysis of causes of disputes in

the construction industry using analytical network process (ANP). Procedia

− Social and Behavioral Sciences, 109: 183–187. https://doi.org/10.1016/j.sbspro.2013.12.441

Cooper, R., Moss, P., Williams, R.N., Kitt. G. and Recan, J. (2017). Global Construction

Disputes Report 2017 − Avoiding the Same Pitfalls. North America: Arcadis.

Dada, M. (2013). Frequency of conflicts in construction project procurement: A

correlation analysis. International Journal of Construction Supply Chain

Management, 3(1): 1−15. https://doi.org/10.14424/ijcscm301013-01-15

Daoud, O.E.K. and Azzam, O.M. (1999). Sources of disputes in construction contracts

in the Middle East. Technology, Law and Insurance, 4(1−2): 87−93. https://doi.org/10.1080/135993799349171

Davis, P., Ellis, J. and Cheung, S. (2010). Dispute causation: Identification of pathogenic

influences in construction. Engineering, Construction and Architectural

Management, 17(4): 404−423. https://doi.org/10.1108/09699981011056592

Dmaidi, N. (2013). Construction contracting management obstacles in Palestine.

International Journal of Construction Engineering and Management, 2:

−22. https://doi.org/10.5923/j.ijcem.20130201.03

Ejohwomu, O., Oshodi, O. and Onifade, M.K. (2016). Causes of conflicts in

construction projects in Nigeria: Consultant’s and contractor’s perspective.

Nigerian Journal of Technology, 35(2): 270. http://dx.doi.org/10.4314/njt.v35i2.6

El-Razek, M.A., Bassioni, H. and Mobarak, A.M. (2008). Causes of delay in building

construction projects in Egypt. Journal of Construction Engineering and

Management, 134(11): 831–841. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)

El-Sayegh, S., Ahmad, I., Aljanabi, M., Herzallah, R., Metry, S. and El-Ashwal, O. (2020).

Construction disputes in the UAE: Causes and resolution methods. Buildings,

(10): 171. https://doi.org/10.3390/buildings10100171

Enshassi, A., Choudhry, R.M. and El-Ghandour, S. (2009). Contractors’ perception

towards causes of claims in construction projects. International Journal of

Construction Management, 9: 79−92. https://doi.org/10.1080/15623599.2009.10773123

Exactitude Consultancy (2022). Construction industry market is expected to be worth

USD 17,247.96 billion by 2029, growing at a 7.3% annual rate. Available at:

https://www.globenewswire.com/en/news-release/2022/08/23/2502951/0/en/Construction-Industry-Market-Is-Expected-To-Be-Worth-USD-17-247-96-Billion-by-2029-Growing-At-A-7-3-Annual-Rate.html#:~:text=The%20size%20of%20the%20global,USD%2011%2C561.40%20billion%20in%202020 [Accessedon 1 February 2023].

Getahun, A., Macarubbo, Y. and Legese, A. (2016). Assessment of construction

dispute resolution in Ethiopian Somali regional state road projects: A case

study on road projects in the region. American Journal of Civil Engineering,

(6): 282−289. https://doi.org/10.11648/j.ajce.20160406.13

Gharaibeh, L.G., Matarneh, S.T., Arafeh, M. and Sweis, G. (2021). Factors leading

to design changes in Jordanian construction projects. International Journal

of Productivity and Performance Management, 70(4): 893−915. https://doi.org/10.1108/IJPPM-08-2019-0412

Hadikusumo, B.H.W. and Tobgay, S. (2015). Construction claim types and causes

for a large-scale hydropower project in Bhutan. Journal of Construction in

Developing Countries, 20(1): 49−63.

Hardjomuljadi, S. (2014). Factor analysis on causal of construction claims and

disputes in Indonesia (with reference to the construction of hydroelectric

power project in Indonesia). International Journal of Applied Engineering

Research, 9(22): 12421−12446.

Harmon, K.M. 2009. Case study as to the effectiveness of dispute review boards

on the Central Artery/Tunnel Project. Journal of Legal Affairs and Dispute

Resolution in Engineering and Construction, 1(1): 18−31. https://doi.

org/10.1061/(ASCE)1943-4162(2009)1:1(18)

Hassanein, A.A.G. and El Nemr, W. (2007). Management of change order

claims in the Egyptian industrial construction sector. Journal of Financial

Management of Property and Construction, 12(1): 45−60. https://doi.org/10.1108/13664380780001093

Hosseinian, S.S. and Torghabeh, Z.J. (2012). Major theories of construction accident

causation models: A literature review. International Journal of Advances in

Engineering and Technology, 4(2): 53–66.

Jaffar, N., Tharim, A.H.A. and Shuib, M.N. (2011). Factors of conflict in construction

industry: A literature review. Procedia Engineering, 20: 193−202. https://doi.org/10.1016/j.proeng.2011.11.156

Kalyan, H.S. and Prakash, A. (2019). Case studies on dispute resolutions in construction

projects for framing an expert solution B. International Journal of Recent

Technology and Engineering, 8(1): 476–483.

Kassab, M., Hipel, K. and Hegazy, T. (2006). Conflict resolution in construction

disputes using the graph model. Journal of Construction Engineering and

Management, 132(10): 1043−1052. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:10(1043)

Kish, L. (1965). Survey Sampling. New York: John Wiley & Sons, Inc.

Klinger, M. (2009). Confronting construction conflicts electrical construction and

maintenance. Available at: https://www.ecmweb.com/maintenancerepairoperations/article/20891433/confronting-construction-conflicts

[Accessed on 1 March 2023].

Marzouk, M., El-Mesteckawi, L. and El-Said, M. (2011). Dispute resolution aided tool for

construction projects in Egypt. Journal of Civil Engineering and Management,

(1): 63−71. https://doi.org/10.3846/13923730.2011.554165

Mohamed, H.H., Ibrahim, A.H. and Soliman, A.A. (2014). Reducing construction

disputes through effective claims management. American Journal of Civil

Engineering and Architecture, 2(6): 186−196. https://doi.org/10.12691/ajcea-2-6-2

Moura, H.M.P. and Teixeira, J.M.C. (2010). Managing stakeholders conflicts. In E.

Chinyio and P. Olomolaiye (eds.), Construction Stakeholder Management.

West Sussex: Wiley-Blackwell, 286−316. https://doi.org/10.1002/9781444315349.ch17

Narh, O.C. (2015). An exploratory study of professional conflicts and disputes within

the construction industry. International Journal of Managerial Studies and

Research, 3(12): 44−65.

Project Management Institute (2017). A Guide to the Project Management Body

of Knowledge (PMBOK Guide). 6th Ed. Pennsylvania: Project Management

Institute, Inc.

Rumane, A.R. (2017). Quality Management in Construction Projects. Boca Raton,

FL: CRC Press.

Ruuska, I. and Teigland, R. (2009). Ensuring project success through collective

competence and creative conflict in public-private partnerships: A case study

of Bygga Villa, a Swedish triple helix e-government initiative. International

Journal of Project Management, 27(4): 323−334. https://doi.org/10.1016/j.ijproman.2008.02.007

Sabri, O., Lædre, O. and Bruland, A. (2019). Why conflicts occur in roads and tunnels

projects in Norway. Journal of Civil Engineering and Management, 25(3):

−264. https://doi.org/10.3846/jcem.2019.8566

Sambasivan, M. and Soon, Y.W. (2007). Causes and effects of delays in Malaysian

construction industry. International Journal of Project Management, 25:

−526. https://doi.org/10.1016/j.ijproman.2006.11.007

Sayed-Gharib, T., Price, A. and Lord, W. (2010). Improving dispute resolution on

construction projects in Kuwait. In Proceedings of 2010 18th CIB World Building

Congress Salford. Salford: International Council for Building.

Speaight, A. (ed.) (2010). Architect’s Legal Handbook: The Law for Architects. 9th

Ed. London: Architectural Press.

Statista (2022). Size of the global construction market from 2020 to 2021, with forecasts

from 2022 to 2030. Available at: https://www.statista.com/statistics/1290105/global-construction-market-size-with-forecasts/ [Accessed on 1 February 2023].

Tarawneh, S., Sarireh, M. and Tarawneh, E. (2020). Time and cost overruns in

Jordanian Building construction projects. Natural and Applied Sciences

Series, 35(1): 53−73.

Wilkinson, P. (2016). Middle East contract disputes are world’s largest. Available

at: https://www.meed.com/middle-east-contract-disputes [Accessed on 2 March 2023].

Yamane, T. (1967). Statistics, An Introductory Analysis. New York: Harper and Row.

Zaneldin, E.K. (2006). Construction claims in United Arab Emirates: Types, causes

and frequency. International Journal of Project Management, 24(5): 453−459.

https://doi.org/10.1016/j.ijproman.2006.02.006