Critical Factors Influencing the Performance of Public Housing Construction Projects in Myanmar

Main Article Content

Su Su Nwal
Kriengsak Panuwatwanich
Myint Naing

Abstract

Public housing is a basic need for low- and middle-income families. Unfortunately, in many developing countries, housing construction projects often fall short of achieving the required performance levels. This problem occurs for many reasons: low budget, corruption, poor governance, inadequate policy and the lack of modern technologies used in construction. As a developing country, Myanmar is facing these challenges in public housing construction projects. Although many studies have investigated the factors influencing the performance of construction projects, there has been limited research focusing on public housing construction, particularly. Myanmar plans to provide one million homes by 2030. However, the country faces significant challenges, including political instability and the COVID-19 pandemic. This study attempted to identify the critical factors influencing the performance of public housing construction projects in Myanmar (PHCPM) amid the current changing circumstances. A survey was conducted to collect data from 86 experienced personnel on 51 factors identified in the literature review. The dataset was then analysed using a one-way analysis of variance (ANOVA) and frequency-adjusted important index (FAII) analysis method. The factors were ranked according to FAII scores and 10 critical factors were identified and discussed. The results of this study can help inform individuals responsible for taking action to mitigate the impact of the critical factors identified on improving the performance of PHCPM. 

Article Details

How to Cite
Su Su Nwal, Kriengsak Panuwatwanich, and Myint Naing. 2024. “Critical Factors Influencing the Performance of Public Housing Construction Projects in Myanmar”. Journal of Construction in Developing Countries 29 (1): 163-90. https://doi.org/10.21315/.
Section
Articles

References

Aibinu, A.A. and Odeyinka, H.A. (2006). Construction delays and their causative

factors in Nigeria. Journal of Construction Engineering and Management,

(7): 667–677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)

Akanni, P.O., Oke, A.E. and Akpomiemie, O.A. (2019). Impact of environmental

factors on building project performance in Delta State, Nigeria. HBRC Journal,

(1): 91–97. https://doi.org/10.1016/j.hbrcj.2014.02.010

Alaghbari, W.E., Salim, A., Dola, K. and Abdullah Abang Ali, A. (2009). Housing

shortage for low‐income in Yemen: causes and suggestions. International

Journal of Housing Markets and Analysis, 2(4): 363–372. https://doi.org/doi:10.1108/17538270910992809

Alzahrani, J.I. and Emsley, M.W. (2013). The impact of contractors’ attributes on

construction project success: A post-construction evaluation. International

Journal of Project Management, 31(2): 313–322. https://doi.org/10.1016/j.ijproman.2012.06.006

Amoatey, C.T., Ameyaw, Y.A., Adaku, E. and Famiyeh, S. (2015). Analysing delay

causes and effects in Ghanaian state housing construction projects.

International Journal of Managing Projects in Business, 8(1): 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035

Amusan, L.M., Afolabi, A., Ojelabi, R., Omuh, I. and Okagbue, H.I. (2018). Data

exploration on factors that influences construction cost and time performance

on construction project sites. Data in Brief, 17: 1320–1325. https://doi.org/10.1016/j.dib.2018.02.035

Aragonés-Beltrán, P., García-Melón, M. and Montesinos-Valera, J. (2017). How to

assess stakeholders’ influence in project management? A proposal based on

the analytic network process. International Journal of Project Management,

(3): 451–462. https://doi.org/10.1016/j.ijproman.2017.01.001

Asian Development Bank (2019). Financing Affordable Housing in Yangon. https://doi.org/10.22617/TCS190167-2

Assaf, S.A. and Al-Hejji, S. (2006). Causes of delay in large construction projects.

International Journal of Project Management, 24(4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010

Bingol, B.N. and Polat, G. (2017). Measuring managerial capability of subcontractors

using a KPI model. Procedia Engineering, 196: 68–75. https://doi.org/ 10.1016/j.proeng.2017.07.174

Chadee, A.A., Martin, H.H., Mwasha, A. and Otuloge, F. (2022). Rationalizing critical

cost overrun factors on public sector housing programmes. Emerging Science

Journal, 6(3): 647–666. https://doi.org/10.28991/ESJ-2022-06-03-016

Chen, L., Lu, Q. and Han, D. (2023). A Bayesian-driven Monte Carlo approach for

managing construction schedule risks of infrastructures under uncertainty.

Expert Systems with Applications, 212: 118810. https://doi.org/10.1016/j.eswa.2022.118810

Cheng, M.-Y., Tsai, H.-C. and Sudjono, E. (2011). Evaluating subcontractor

performance using evolutionary fuzzy hybrid neural network. International

Journal of Project Management, 29(3): 349–356. https://doi.org/10.1016/j.ijproman.2010.03.005

Chileshe, N. and Yirenkyi‐Fianko, A.B. (2012). An evaluation of risk factors impacting

construction projects in Ghana. Journal of Engineering, Design and

Technology, 10(3): 306–329. https://doi.org/10.1108/17260531211274693

Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences. New York:

Routledge. https://doi.org/10.4324/9780203771587

Denis, D.J. (2016). Applied Univariate, Bivariate and Multivariate Statistics. Hoboken,

NJ: Wiley. https://doi.org/10.1002/9781119583004

Dick-Sagoe, C., Lee, K.Y., Odoom, D. and Boateng, P.O. (2023). Stakeholder

perceptions on causes and effects of public project failures in Ghana.

Humanities and Social Sciences Communications, 10(1): 14. https://doi.org/10.1057/s41599-022-01497-7

Department of Population (2017). Thematic Report on Housing Conditions and

Household Amenities. Naypyidaw: Department of Population, The Republic

of the Union of Myanmar.

_____. (2015). The 2014 Myanmar Population and Housing Census, Union Report.

Census report vol. 2. Naypyidaw: Department of Population, The Republic of

the Union of Myanmar.

El-khalek, H.A., Aziz, R.F. and Morgan, E.S. (2019). Identification of construction

subcontractor prequalification evaluation criteria and their impact on

project success. Alexandria Engineering Journal, 58(1): 217–223. https://doi.org/10.1016/j.aej.2018.11.010

Enshassi, A., Mohamed, S. and Abushaban, S. (2009). Factors affecting the

performance of construction projects in the Gaza Strip. Journal of Civil

Engineering and Management, 15(3): 269–280.

Eom, C.S., Yun, S.H. and Paek, J.H. (2008). Subcontractor evaluation and

management framework for strategic partnering. Journal of Construction

Engineering and Management, 134(11): 842–851.

Garson, G.D. (2012). Testing Statistical Assumptions. Asheboro, NC: Statistical

Associates Publishing.

Gebrehiwet, T. and Luo, H. (2017). Analysis of delay impact on construction project

based on rii and correlation coefficient: Empirical study. Procedia Engineering,

: 366–374. https://doi.org/10.1016/j.proeng.2017.07.212

Gunduz, M. and Ahsan, B. (2018). Construction safety factors assessment through

Frequency Adjusted Importance Index. International Journal of Industrial

Ergonomics, 64: 155–162. https://doi.org/10.1016/j.ergon.2018.01.007

Gunduz, M., Nielsen, Y. and Özdemir, M. (2013). Quantification of delay factors

using the relative importance index method for construction projects in

Turkey. Journal of Management in Engineering, 29(2): 133–139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000129

Habitat for Humanity (2023). Affordable Housing. Available at: https://www.habitat.

org/emea/about/what-we-do/affordable-housing

Hair, J.F. (2009). Multivariate Data Analysis. 7th Ed. New York: Pearson.

Hansen, W.B. and Collins, L.M. (1994). Seven ways to increase power without

increasing N. American Psychological Association (APA). https://doi.org/10.1037/e495862006-008

Hashim, A.E., Samikon, S.A., Nasir, N.M. and Ismail, N. (2012). Assessing factors

influencing performance of Malaysian low-cost public housing in sustainable

environment. Procedia – Social and Behavioral Sciences, 50: 920–927. https://doi.org/10.1016/j.sbspro.2012.08.093

Hatmoko, J. and Scott, S. (2010). Simulating the impact of supply chain

management practice on the performance of medium-sized building

projects. Construction Management and Economics, 28: 35–49. https://doi.org/10.1080/01446190903365632

Hatmoko, J.U.D. and Khasania, R.R. (2016). Comparing performance of government

and private clients in construction projects: Contractors’ perspective. Civil

Engineering Dimension, 18(2): 85–92. https://doi.org/10.9744/ced.18.2.85-92

Hossen, M. M., Kang, S. and Kim, J. (2015). Construction schedule delay risk

assessment by using combined AHP-RII methodology for an international NPP

project. Nuclear Engineering and Technology, 47(3): 362–379. https://doi.org/10.1016/j.net.2014.12.019

Housing and Development Board (2023). Public housing: A Singapore icon. Available

at: https://www.hdb.gov.sg/

Hwang, B.-G., Zhao, X. and Ng, S.Y. (2013). Identifying the critical factors affecting

schedule performance of public housing projects. Habitat International, 38:

–221. https://doi.org/10.1016/j.habitatint.2012.06.008

Jha, K. and Iyer, K. (2006). Critical factors affecting quality performance in

construction projects. Total Quality Management and Business Excellence,

(9): 1155–1170.

Jiboye, A. D. (2011). Evaluating public housing performance: providing a basis for

residential quality improvement in Nigeria. Middle-East Journal of Scientific

Research, 9(2): 225–232.

Japan International Cooperation Agency (2018). Myanmar data collection survey

on housing finance system report. Available at: https://openjicareport.jica.go.jp/pdf/12305769.pdf

Khodeir, L.M. and Mohamed, A.H.M. (2015). Identifying the latest risk probabilities

affecting construction projects in Egypt according to political and economic

variables: From January 2011 to January 2013. HBRC Journal, 11(1): 129–135.

https://doi.org/10.1016/j.hbrcj.2014.03.007

Kumar, R. (2018). Research Methodology: A Step-By-Step Guide for Beginners. New

York: Sage.

Larsen, J. K., Shen, G. Q., Lindhard, S. M. and Brunoe, T. D. (2016). Factors affecting

schedule delay, cost overrun and quality level in public construction projects.

Journal of Management in Engineering, 32(1). https://doi.org/10.1061/(ASCE)me.1943-5479.0000391

Larsson, J. (2018). The importance of hard project management and team

motivation for construction project performance. International Journal

of Managing Projects in Business, 11(2): 275–288. https://doi.org/10.1108/IJMPB-04-2017-0035

Latiffi, A.A., Mohd, S. and Brahim, J. (2015). Application of building information

modeling (BIM) in the Malaysian construction industry: A story of the first

government project. Applied Mechanics and Materials, 773: 996–1001

Le-Hoai, L., Lee, Y.D. and Lee, J.Y. (2008). Delay and cost overruns in Vietnam large

construction projects: A comparison with other selected countries. KSCE

Journal of Civil Engineering, 12(6): 367–377. https://doi.org/10.1007/s12205-008-0367-7

Lew, Y.-L., Hassim, S., Muniandy, R. and Hua, L.T. (2018). Structural equation modelling

for subcontracting practice: Malaysia chapter. Engineering, Construction

and Architectural Management, 25(7): 835–860. https://doi.org/10.1108/ECAM-04-2017-0073

Li, C.Z., Hong, J., Fan, C., Xu, X. and Shen, G.Q. (2018). Schedule delay analysis

of prefabricated housing production: A hybrid dynamic approach.

Journal of Cleaner Production, 195: 1533–1545. https://doi.org/10.1016/j.jclepro.2017.09.066

Luu, V.T., Kim, S.-Y., Tuan, N.V. and Ogunlana, S.O. (2009). Quantifying schedule

risk in construction projects using Bayesian belief networks. International

Journal of Project Management, 27(1): 39–50. https://doi.org/10.1016/j.ijproman.2008.03.003

Mahmud, A.T., Ogunlana, S.O. and Hong, W.T. (2021). Key driving factors of cost

overrun in highway infrastructure projects in Nigeria: A context-based

perspective. Journal of Engineering, Design and Technology, 19(6): 1530–

https://doi.org/10.1108/JEDT-05-2020-0171

Mandala, R.S.K. and Nayaka, R.R. (2023). A state of art review on time, cost and

sustainable benefits of modern construction techniques for affordable

housing. Construction Innovation [Forthcoming]. https://doi.org/10.1108/CI03-2022-0048

Maturana, S., Alarcón, L.F., Gazmuri, P. and Vrsalovic, M. (2007). On-site

subcontractor evaluation method based on lean principles and partnering

practices. Journal of Management in Engineering, 23(2): 67–74. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:2(67)

McCarty, M. (2014). Introduction to public housing. Available at: https://digital.library.unt.edu/ark:/67531/metadc820996/

Mohamed, M. (2018). Assessing Egyptian construction projects performance

using principal component analysis. International Journal of Productivity

and Performance Management, 67(9): 1727–1744. https://doi.org/10.1108/IJPPM-06-2017-0134

Naing, M. (2021). Brief history of department of urban and housing development:

focal institution for housing sector in Myanmar. Current Urban Studies, 9(4):

–743. https://doi.org/10.4236/cus.2021.94043

Naing, Y.M., Tsai, S.L. and Kobayashi, H. (2021). Exploration of potential public

housing strategies for low-income households in Yangon, Myanmar. Paper

presented at 57th ISOCARP World Planning Congress. Doha, Qatar, 8–11

November.

Nasir, D., McCabe, B. and Hartono, L. (2003). Evaluating risk in construction schedule

model: Construction schedule risk model. Journal of Construction Engineering

and Management, 129(5): 518–527. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(518)

National Housing Authority (2023). Baan Eua-Arthon project. Available at: https://www.nha.co.th/en/

Ndou, V.D. (2004). E-government for developing countries: Opportunities and

challenges. he Electronic Journal of Information Systems in Developing

Countries, 18(1): 1–24. https://doi.org/10.1002/j.1681-4835.2004.tb00117.x

Ng, S.T. and Tang, Z. (2010). Labour-intensive construction sub-contractors: Their

critical success factors. International Journal of Project Management, 28(7):

–740. https://doi.org/10.1016/j.ijproman.2009.11.005

Nwal, S. and Panuwatwanich, K. (2018). Social housing in myanmar: Issues and

way forward. Paper presented at 2018 Joint Asia-Pacific Network for Housing

Research and Australasian Housing Researchers Conference Griffith University.

Gold Coast, Australia, 6–8 June.

Nyein, T.S. and Hadikusumo, B.H.W. (2021). Factors influencing the adoption of public–

private partnership in low-cost housing development in Myanmar. Journal

of Financial Management of Property and Construction, 26(3): 337–365.

https://doi.org/10.1108/jfmpc-01-2020-0003

Rachid, Z., Toufik, B. and Mohammed, B. (2019). Causes of schedule delays in

construction projects in Algeria. International Journal of Construction

Management, 19(5): 371–381. https://doi.org/10.1080/15623599.2018.1435234

Rhoads, E.L., Poine, T.S., Win, C.C. and Kyed, H. (2020). Myanmar: Urban Housing

Diagnostic and COVID-19 Rapid Assessment (English). Washington, DC: World

Bank Group.

Sambasivan, M. and Soon, YW (2007). Causes and effects of delays in Malaysian

construction industry. International Journal of Project Management, 25(5):

–526. https://doi.org/10.1016/j.ijproman.2006.11.007

Sinesilassie, E.G., Tabish, S.Z.S. and Jha, K.N. (2018). Critical factors affecting cost

performance: a case of Ethiopian public construction projects. International

Journal of Construction Management, 18(2): 108–119. https://doi.org/10.1080/15623599.2016.1277058

Soetanto, R. (2002). Modelling the satisfaction of contractors: The impact of client

performance. Engineering, Construction and Architectural Management,

(5/6): 453. https://doi.org/10.1108/eb021239

Sullivan, G.M. and Feinn, R. (2012). Using effect size-or why the p value is not

enough. Journal of Graduate Medical Education, 4(3): 279–282. https://doi.org/10.4300%2FJGME-D-12-00156.1

Sweis, R.J., Bisharat, S.M., Bisharat, L. and Sweis, G. (2014). Factors affecting

contractor performance on public construction projects. Life Science Journal,

(4): 28–39.

Takim, R. and Akintoye, A. (2002). Performance indicators for successful construction

project performance. In D. Greenwood (ed.), 18th Annual ARCOM

Conference, Vol. 2. Newcastle upon Tyne: ARCOM, 545–555.

Tam, V.W.Y., Shen, L.Y. and Kong, J.S.Y. (2011). Impacts of multi-layer chain

subcontracting on project management performance. International

Journal of Project Management, 29(1): 108–116. https://doi.org/10.1016/j.ijproman.2010.01.005

Thai, H.-T., Ngo, T. and Uy, B. (2020). A review on modular construction for high-rise

buildings. Structures, 28: 1265–1290. https://doi.org/10.1016/j.istruc.2020.09.070

The World Bank (2022). Myanmar economic monitor: Reforms reversed. Available at:

https://www.worldbank.org/en/country/myanmar/publication/myanmareconomic-monitor-july-2022-reforms-reversed

United Nations (2022). The Sustainable Development Goals report 2022. Available

at: https://unstats.un.org/sdgs/report/2022/

_____. (2015). Transforming our world: The 2030 agenda for sustainable development.

Available at: https://sdgs.un.org/2030agenda

Wu, G., Yang, R., Li, L., Bi, X., Liu, B., Li, S. and Zhou, S. (2019) . Factors

influencing the application of prefabricated construction in

China: From perspectives of technology promotion and cleaner

production. Journal of Cleaner Production, 219: 753–762.

https://doi.org/10.1016/j.jclepro.2019.02.110.

Yu, T., Man, Q., Wang, Y., Shen, G.Q., Hong, J., Zhang, J. and Zhong, J. (2019).

Evaluating different stakeholder impacts on the occurrence of quality defects

in offsite construction projects: A Bayesian-network-based model. Journal of

Cleaner Production, 241: 118390. https://doi.org/10.1016/j.jclepro.2019.118390