Barriers to the Adoption of Electronic Procurement in Public Sector Construction Projects in Zimbabwe

Main Article Content

Netsai Sakutemba
Rangarirai Muvungani
Tirivavi Moyo

Abstract

The construction business has evolved worldwide, with private and public entities increasingly adopting modern technology. Construction procurement constraints have partly been resolved by adopting electronic procurement systems. However, the use of electronic procurement has faced a myriad of barriers. Therefore, this study sought to determine barriers affecting the adoption of e-procurement by public construction entities in Zimbabwe. A pragmatic philosophy was adopted, with a questionnaire survey administered to registered construction consultants and contractors to collect quantitative data and interviews were conducted with procurement practitioners. The data was analysed using the normality test, chi-squared test, thematic analysis and factor analysis. The results of the univariate revealed that the top three issues affecting e-procurement adoption in public sector construction projects are the unavailability of e-procurement software, negative attitude towards the use of the technology and unavailability of information technology (IT) infrastructure. Procurement practitioners revealed similar barriers that included the lack of top management support, technical expertise, inadequate supporting infrastructure/lack of IT infrastructure for e-procurement adoption, lack of adequate procurement personnel training and inadequate legal frameworks supporting e-procurement adoption. Results from the factor analysis revealed six components that included “Training, practice and management support inadequacies”, “Organisational policy aspects”, “Technical and budgetary concerns”, “Teamwork and change issues” and “Inadequate government technical support system”. The findings revealed that public entities still need to fully embrace e-procurement in construction projects as there is much dependency on paper-based processes. Vital e-government reforms should precede the launch of e-procurement. Also, full participation and involvement of publicprivate partnerships and expertise are required to assist in the adoption of e-procurement by public construction entities. 

Article Details

How to Cite
Netsai Sakutemba, Rangarirai Muvungani, and Tirivavi Moyo. 2024. “Barriers to the Adoption of Electronic Procurement in Public Sector Construction Projects in Zimbabwe”. Journal of Construction in Developing Countries 29 (2): 231-55. https://doi.org/10.21315/.
Section
Articles

References

Addo, S.K. (2019). Challenges of e-procurement adoption in the Ghana public

sector: A survey of the Ministry of Finance. Scholarly Journal of Arts and

Humanities, 1(7): 44–80.

Aduwo, E.B., Ibem, E.O., Afolabi, A.O., Oluwnmi, A.O., Tunji-Olayeni, P.F., AyoVaughan, E.A., Uwakonye, U.O. and Oni, A.A. (2020). Exploring anti-corruption

capabilities of e-procurement in construction project delivery in Nigeria.

Construction Economics and Building, 20(1): 56–76. https://doi.org/10.5130/

AJCEB.v20i1.6964

Afolabi, A.O., Ibem, E., Aduwo, E., Tunji-Olayeni, P. and Oluwunmi, O. (2019).

Critical success factors (CSFs) for e-procurement: Adoption in the Nigerian

construction industry. International Journal of Civil Engineering and

Technology, 9(47): 1–18. https://doi.org/10.3390/buildings9020047

Afolabi, A.O., Oyeyipo, O., Ojelabi, R.A. and Tunji-Olayeni, P.F. (2017). E-Maturity

of construction stakeholders for a web-based e-procurement platform in

the construction industry. International Journal of Civil Engineering and

Technology (IJCIET), 8(12): 465–482.

Ahmad, H., Hassan, S.H.A. and Ismail, S. (2023). Transparency level of the electronic

procurement system in Malaysia. Journal of Financial Reporting and

Accounting, 21(3): 592–606. https://doi.org/10.1108/JFRA-07-2021-0181

Ahmad, T., Aljafari, R. and Venkatesh, V. (2019). The government of Jamaica’s

electronic procurement system: Experiences and lessons learned. Internet

Research, 29(6): 1571–1588.

Alomar, M.A. and Visscher, C.D. (2017). Which factors can affect e-public

procurement adoption by private firms? The case of Belgium. The Electronic

Journal of e-Government, 15(2): 103–115.

Asare, E.N. and Prempeh K.B. (2017). An empirical assessment of factors that

influence the implementation of e-procurement in technical universities in

Ghana. Journal of Logistics Management, 6(2): 52–60.

Bhandari, P. (2020). How to calculate standard deviation (guide): Calculator and

examples. Scribbr, 17 September. Available at: https://www.scribbr.com/

statistics/standard-deviation

Bulut, C. and Yen, B.P.C. (2013). E-Procurement in the public sector: A global

overview. Electronic Government, An International Journal, 10(2): 189–210.

https://doi.org/10.1504/EG.2013.052601

Carlström, E. and Olsson, L.E. (2014). The association between subcultures and

resistance to change: In a Swedish hospital clinic. Journal of Health

Organization and Management, 28(4): 458–476. https://doi.org/10.1108/

JHOM-09-2012-0184

Chan, A.P.C. and Owusu, E.K. (2022). Evolution of electronic procurement:

Contemporary review of adoption and implementation strategies.

Buildings, 12(2): 198. https://doi.org/10.3390/buildings12020198

Chebii, L.D. (2016). Determinants of successful implementation of e-procurement in

public institutions in Kenya. International Journal of Economics, Commerce

and Management, 4(4): 1125–1136.

Chigara, B. and Smallwood, J. (2016). The effect of environmental thermal variability

on construction health and safety in Zimbabwe. In E.M. Mwanaumo,

I. Musonda and F. Muleya (eds.), Proceedings of the 3rd International

Conference on Infrstructure Development and Investment Strategies for

Africa. Johannesburg: The Development and Investment in Infrastructure,

–302.

Chigudu, D. (2014). Public procurement in Zimbabwe: Issues and challenges. Journal

of Governance and Regulation, 3(4): 21–26.

Creswell, J.W. and Clark, V.L. (2018). Designing and Conducting Mixed Methods

Research. 3rd Ed. London: SAGE Publications, Inc.

Crumm, J. (2013). Procurement and construction management. In P.D. Galloway,

K.R. Nielsen and J.L. Dignum (eds.), Managing Gigaprojects: Advice from

Those Who’ve Been There, Done That. Reston, VA: American Society of Civil

Engineers, 197–228. https://doi.org/10.1061/9780784412381.ch10

Dello, A. and Yoshida, C. (2017). Online tendering and evaluation for public

procurement in Tanzania. In T. Hochin, H. Hirata and N. Hiroki (eds.), 18th IEEE/

ACIS International Conference on Software Engineering, Artificial Intelligence,

Networking and Parallel/Distributed Computing (SNPD 2017). Piscataway, NJ:

IEEE, 137–141. https://doi.org/10.1109/SNPD.2017.8022713

Dlakuseni, S., Kanyepe, J. and Tukuta, M. (2018). Working towards a framework for

enhancing public e-procurement for Zimbabwe state owned enterprises

(SOEs). International Journal of Supply Chain Management, 7(6): 339–348.

Field, A. (2014). Discovering Statistics Using IBM SPSS Statistics. 4th Ed. Los Angeles:

SAGE Publication, Inc.

Hamma-Adama, M. and Ahmad, A.B.S.E. (2021). Challenges and opportunities of

e-procurement in the construction industry. Journal of Construction Materials,

(4): 4–7. http://dx.doi.org/10.36756/JCM.v2.4.7

Hashim, N., Said, I. and Idris, N.H. (2013). Exploring e-procurement value for

construction companies in Malaysia. Procedia Technology, 9: 836–845.

https://doi.org/10.1016/j.protcy.2013.12.093

Johannesson, P. and Perjons, E. (eds.) (2014). Research strategies and methods. In

An Introduction to Design Science. Cham, Switzerland: Springer, 39–73.

Ibem, E.O., Aduwo, E.B., Ayo-Vaughan, E.A., Uwakonye, U.O. and Owolabi,

J.D. (2017). E-Procurement use in the Nigerian building industry.

International Journal of Electronic Commerce Studies, 8(2): 180–215.

https://doi.org/10.7903/ijecs.1524

Johannesson, P. and Perjons, E. (eds.) (2014). Research strategies and methods. In

An Introduction to Design Science. Cham, Switzerland: Springer, 39–73.

Khalil, C.A. and Waly, A.F. (2015). Challenges and obstacles facing tenderers

adopting e-tendering in the public sector of the construction industry in

Egypt. Paper presented at the 5th International/11th Construction Specialty

Conference. Vancouver, British Columbia, 8–10 June.

Knight, L., Harland, C., Telgen, J., Thai, K.V., Callender, G. and McKen, K. (2012). Public

Procurement: International Cases and Commentary. London: Routledge.

Koech, S.K., Ayoyi, I.R. and Mugambi, F. (2016). Factors influencing adoption of

e-procurement in Kenya’s public sector. European Journal of Logistics,

Purchasing and Supply Chain Management, 4(4): 19–25.

Korir, S., Afande, F.O. and Maina, P. (2015). Constraints to effective implementation

of e-procurement in the public sector: A survey of selected government

ministries in Kenya. Journal of Information Engineering and Applications, 5(4):

–83.

Kumar, A., Mangla, S.K., Luthra, S. and Ishizaka, A. (2019). Evaluating the human

resource-related soft dimensions in green supply chain management

implementation. Production Planning and Control, 30(9): 699–715. https://doi.

org/10.1080/09537287.2018.1555342

Laryea, S. and Ibem, E.O. (2014). Patterns of technological innovation in the use

of e-procurement in construction. Journal of Information Technology in

Construction, 19(6): 104–125.

Li, H., Arditi, D. and Wang, Z. (2015). Determinants of transaction costs in construction

projects. Journal of Civil Engineering and Management, 21(5): 548–558.

Mabhodha, S. and Choga, F. (2021). The impact of information communication

technology (ICT) on procurement processes: Case of Zimbabwean Urban

Councils (2009 to 2018). Journal for Information Technology, 4(1): 25–34.

https://doi.org/10.32591/coas.ojit.0401.03025m

Maguire, M. and Delahunt, B. (2019). A thematic analysis: A practical, step-bystep guide for learning and teaching scholars. All Ireland Journal of Higher

Education, 9(3): 3351–3354.

Mambo, P.N., Ombui, K. and Kagiri, A. (2015). Factors influencing implementation of

e-procurement in the national government: A case of the Ministry of Interior

and Co-ordination of national government. Strategic Journal of Business and

Change Management, 2(1): 12–25.

Marei, A.Z., Daoud, L., Ibrahim, M. and Al-Jabaly, M.S. (2020). Moderating the role

of top management support in electronic procurement usage of Jordanian

firms. Management Science Letters, 11: 1121–1132. https://doi.org/10.5267/j.

msl.2020.11.027

Masudin, I., Aprilia, G.D., Nugraha, A. and Restuputri, D.P. (2021). Impact of

e-procurement adoption on company performance: Evidence from

Indonesian manufacturing industry. Logistics, 5(1). https://doi.org/10.3390/

logistics5010016

Mawuko, D., Ron, F. and Rod, G. (2013). Procurement reforms in Africa: The strides,

challenges and improvement opportunities. Journal of Public Administration

Research, 2(2): 49–57. https://doi.org/10.5539/par.v2n2p49

Melidi, K. (2013). E-Commerce for Organizations Development and Competitive

Advantage. Hershey, PA: IGI Global

Muhwezi, M. and Ahimbisibwe, A. (2015). Contract management, inter functional

coordination, trust and contract performance of works contracts in Ugandan

public procuring and disposing entities. European Journal of Business and

Management, 7(20): 76–86.

Mushi, G.O. and Nsimbila, P.M. (2022). Determinants of electronic procurement

system adoption in Tanzania. African Journal of Applied Research, 8(1): 309–

https://doi.org/10.26437/ajar.03.2022.20

Nani, D.A. and Ali, S. (2020). Determinants of effective e-procurement system:

Empirical evidence from Indonesian local governments. Journal Dinamika

Akuntansi dan Bisnis, 7(1): 33–50. https://doi.org/10.24815/jdab.v7i1.15671

Nawi, M.N.M., Deraman, R., Bamgbade, J.A., Zulhumadi, F. and Riazi, S.R.M. (2017).

E-Procurement in Malaysian construction industry: Benefits and challenges in

implementation. International Journal of Supply Chain Management, 6(1):

–213. https://doi.org/10.59160/ijscm.v6i1.1630

Nziku, D. and Siwandeti, M. (2019). Factors affecting adoption of e-procurement

in private companies in Tanzania: The case of TBL Mwanza Plant. Business

Education Journal, 6(1).

Obel, J.A., Abiero, I.O. and Njeru, A. (2016). Organisational factors affecting the

adoption of e-procurement system in the county governments: A case of

Nairobi City County. International Journal of Science and Research, 5(10):

–819.

Omer, M.M., Rahman, R.A. and Almutairi, S. (2022). Construction waste recycling:

Enhancement strategies and organisation size. Physics and Chemistry of the

Earth, Parts A/B/C, 126: 103114. https://doi.org/10.1016/j.pce.2022.103114

Patel, P., Satrndraku, D. and Khajuria, R. (2016). A study to identify factors that affect

e-procurement implementation. International Journal of Science Technology

and Engineering, 2(9): 264–268.

Pitso, N., Kabanda, S. and Kapepo, M. (2018). Exploring e-procurement adoption in

the context of a developing country: The case of Lesotho. In V. Odumuyiwa,

O. Adegboyega and C. Uwadia (eds.), E-Infrastructure and e-Services for

Developing Countries. Cham, Switzerland: Springer, 315–326. https://doi.

org/10.1007/978-3-319-98827-6_30

Rajah, N. (2015). E-Government in Zimbabwe: An overview of progress made and

challenges ahead. Journal of Global Research in Computer Science, 6(12):

–16.

Ronald, N.K. and Omwenga, J.Q. (2015). Factors contributing to the adoption of

e-procurement in county governments: A case study of County Government

of Bomet. International Journal of Academic Research in Business and Social

Sciences, 5(10): 233–239.

Rotich, G.K. and Okello, B. (2015). Analysis of use of e-procurement on performance

of the procurement functions of county governments in Kenya. International

Journal of Economics, Commerce and Management, 3(6): 1381–1398.

Salum, M. and Ntimbwa, M. (2020). Assessment of the effectiveness of e-procurement

in local government in Tanzania. A case of Lindi District Council. Available at:

http://dspace.cbe.ac.tz:8080/xmlui/handle/123456789/617

Schutt, R.K. (2016). Investigating the Social World: The Process and Practice of

Research. 8th Ed. Thousand Oaks, CA: SAGE Publications, Inc.

Sekaran, U. and Bougie, R. (2016). Research Methods for Business: A Skill-Building

Approach. 7th Ed. West Sussex: John Wiley & Sons.

Seresht, H.R., Alizadeh, M. and Abdollahi, H. (2021). The effects of organisational

structure and job characteristics on job satisfaction and organisational

commitment. Management Research in Iran, 20(4): 147–176.

Shatta, D.N., Shayo, F.A. and Layaa, J.N. (2020). Determinants of e-procurement

adoption model for green procurement in developing countries: Experience

from Tanzania. International Academics Journal of Procurement Supply

Chain Management, 3(2): 1–18.

Tiwari, S.T.S., Chan, S.W., Ahmad, M.F. and Zaman, I. (2019). Application and

implementation of e-procurement technologies in Malaysian manufacturing

firm. International Journal of Supply Chain Management, 8(2): 923–929.

UNEP (United Nations Environment Programme) (2017). Global review of sustainable

public procurement. Available at: https://www.unep.org/resources/

report/2017-global-review-sustainable-public-procurement

Wimalasena, N.N. and Gunatilake, S. (2018). The readiness of construction

contractors and consultants to adopt e-tendering: The case of Sri Lanka.

Construction Innovation, 18(3): 350–370. https://doi.org/10.1108/CI-03-2017-

Xu, M., Tang, W. and Zhou, C. (2019). Procurement strategies of e-retailers under

different logistics distributions with quality-and service-dependent demand.

Electronic Commerce Research and Applications, 35: 100853. https://doi.

org/10.1016/j.elerap.2019.100853

Yong, A.G. and Pearce, S. (2013). A beginner’s guide to factor analysis: Focusing

on exploratory factor analysis. The Quantitative Methods for Psychology, 9(2):

–94. https://doi.org/10.20982/tqmp.09.2.p079