Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam
Main Article Content
Abstract
In the digital era, the application of new technologies, specifically information technology, has led to the development of building information modelling (BIM), a new technology that helps the construction management industries address current challenges. The level of development (LOD) and precision of BIM data throughout a project play a pivotal role in guaranteeing the triumph of building endeavours and asset management. The determination of the amount of depth and quality of BIM information plays a crucial role in influencing all aspects of a project and the lifespan of building assets. Therefore, this study aims to ascertain the frequency of components used for asset management drawing from a pilot project in Vietnam and to suggest the need for LOD components in facility management (FM). Expert polls, input from building operations managers and a literature review of LOD decision plans and BIM standards led to the conclusion that BIM was the most suitable approach for this objective. Two questionnaire surveys and an expert interview with key personnel from owners, contractors and consultants were conducted. The survey results table, which shows the substructure, superstructure and interior component categories, shows that the study results advise on how often to use different types of construction information. A framework is suggested that outlines the LOD and implementation model for the building of the database and the development of future studies. In the long term, the conceptual model promotes the transfer of knowledge from one project to another.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Alavi, S.H. and Forcada, N. (2019). BIM LOD for facility management tasks. In 2019
European Conference on Computing in Construction (2019 EC3). Crete,
Greece: European Council for Computing in Construction, 154–163. https://
doi.org/10.35490/ec3.2019.187
Altohami, A.B.A., Haron, N.A., Ales@Alias, A.H. and Law, T.H. (2021). Investigating
approaches of integrating BIM, IOT and facility management for renovating
existing buildings: A review. Sustainability, 13(7): 1–30. https://doi.org/10.3390/
su13073930
Applied Technology Council (2013). ATC 75: Improvements to BIM structural Software
Interoperability. California: Applied Technology Council. Available at: https://
www.pankowfoundation.org/site/assets/files/1851/atc-75_camera-ready_
report_final_pankow.pdf
BIMForum (2021). Level of development (LOD) specification. Available at: https://
bimforum.org/resource/lod-level-of-development-lod-specification
Booty, F. (2006). Facilities Management Handbook. 3rd Ed. London: Routledge.
https://doi.org/10.4324/9780080461311
Bruno, S., De Fino, M. and Fatiguso, F. (2018). Historic building information modelling:
Performance assessment for diagnosis-aided information modelling and
management. Automation in Construction, 86: 256–276. https://doi.
org/10.1016/j.autcon.2017.11.009
Carbonari, G., Stravoravdis, S. and Gausden, C. (2018). Improving FM task efficiency
through BIM: A proposal for BIM implementation. Journal of Corporate Real
Estate, 20(1): 4–15. https://doi.org/10.1108/JCRE-01-2017-0001
Cavka, H.B., Staub-French, S. and Poirier, E.A. (2017). Developing owner information
requirements for BIM-enabled project delivery and asset management.
Automation in Construction, 83: 169–183. https://doi.org/10.1016/j.
autcon.2017.08.006
Chen, Y.J., Lai, Y.S. and Lin, Y.H. (2020). BIM-based augmented reality inspection
and maintenance of fire safety equipment. Automation in Construction, 110:
–18. https://doi.org/10.1016/j.autcon.2019.103041
Daniotti, B., Pavan, A., Bolognesi, C., Mirarchi, C. and Signorini, M. (2022). Digital
transformation in the construction sector: From BIM to digital twin. In A. Petrillo,
F.D. Felice, M.V. Achim and N. Mirza (eds.), Digital Transformation: Towards
New Frontiers and Business Opportunities. London: IntechOpen, 93–114.
https://doi.org/10.5772/intechopen.103726.
Davidson, S., Churcher, D., Kemp, A., Boutle, A., Rossiter, D., Winfield, M. and Ford,
J. (2022). ISO 19650 Guidance 1: Concepts. London: UK BIM Framework.
Available at: https://nottingham-repository.worktribe.com/output/21112122
Dias, P. and Ergan, S. (2016). The need for representing facility information with
customized LOD for specific FM tasks. In J.L. Perdomo-Rivera, A. GonzálesQuevedo, C.L. Puerto, F. Maldonado-Fortunet and O.I. Molina-Bas
(eds.), Construction Research Congress 2016: Old and New Construction
Technologies Converge in Historic San Juan. Virginia: American Society of
Civil Engineers, 2563–2572. https://doi.org/10.1061/9780784479827.255
Dlesk, A., Vach, K., Shults, R. and Doubrava, P. (2022). Generalization of
BIM model for purposes of facility management. The International
Archives of Photogrammetry, Remote Sensing and Spatial Information
Sciences, XLIII-B4-2022: 309–314. https://doi.org/10.5194/isprs-archivesXLIII-B4-2022-309-2022
Eastman, C., Teicholz, P., Sacks, R. and Listo, K. (2011). BIM Handbook: A Guide to
Building Information Modelling for Owners, Managers, Designers, Engineers
and Contractors. 2nd Ed. New Jersey: John Wiley & Sons.
El Sayary, S. and Omar, O. (2021). Designing a BIM energy-consumption template to
calculate and achieve a net-zero-energy house. Solar Energy, 216: 315–320.
https://doi.org/10.1016/j.solener.2021.01.003
Field, A. (2013). Discovering Statistics Using IBM SPSS Statistics. 4th Ed. London: SAGE
Publications, Inc.
Government of Vietnam (2023). Decision No. 258/QĐ-TTg Approving Roadmap for
Application of Building Information Modeling (BLM) in Construction Sector.
Hanoi: Government of Vietnam.
Government of Vietnam (2021). Decree No. 06/2021/ND-CP. Hanoi: Government of Vietnam.
GSA (General Services Administration) (2015). GSA Building Information Modelling
(BIM) Guide 02: Spatial Program Validation. Washington DC: The National 3D4D BIM Program.
Haji, M.D., Taghaddos, H., Sebt, M.H., Chokan, F. and Zavari, M. (2021). The effects
of BIM maturity level on the 4D simulation performance: An empirical study.
International Journal of Engineering, 34(3): 606–614. https://doi.org/10.5829/
ije.2021.34.03c.03
Helander, D. and Singh, V. (2016). BIM in building renovation projects: What is the useful
minimum information requirement. International Journal of Product Lifecycle
Management, 9(1): 65–86. https://doi.org/10.1504/IJPLM.2016.078863
Hoang, G.V., Vu, D.K.T., Le, N.H. and Nguyen, T.P. (2020). Benefits and challenges of
BIM implementation for facility management in operation and maintenance
face of buildings in Vietnam. IOP Conference Series: Materials Science and
Engineering, 869: 1–16. https://doi.org/10.1088/1757-899X/869/2/022032
Hong, Y., Hammad, A.W.A., Akbarnezhad, A. and Arashpour, M. (2020).
A neural network approach to predicting the net costs associated with BIM
adoption. Automation in Construction, 119: 1–16. https://doi.org/10.1016/j.
autcon.2020.103306
Ibrahim, H.S., Hashim, N. and Jamal, K.A.A. (2019). The potential benefits of building
information modelling (BIM) in the construction industry. IOP Conference Series:
Earth and Environmental Science, 385: 1–11. https://doi.org/10.1088/1755-
/385/1/012047
Ignatova, E., Zotkin, S. and Zotkina, I. (2018). The extraction and processing of BIM
data. IOP Conference Series: Materials Science and Engineering, 365(6): 1–9.
https://doi.org/10.1088/1757-899X/365/6/062033
Kamaruzzaman, S.N., Suznan, S.N. and Myeda, N.E. (2023). Building information
modelling facilities management (BIMFM) coordination for digital construction
projects. Journal of Facilities Management, 21(4): 535–555. https://doi.
org/10.1108/JFM-10-2021-0127
Keskin, B., Salman, B. and Koseoglu, O. (2022). Architecting a BIM-based digital twin
platform for airport asset management: A model-based system engineering
with SysML approach. Journal of Construction Engineering and Management,
(5): 04022020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002271
Lee, M., Lee, D., Kim, T. and Lee, U.K. (2020). Practical analysis of BIM tasks for modular
construction projects in South Korea. Sustainability, 12(17): 1–16. https://doi.
org/10.3390/su12176900
Lin, Y.C., Hsu, Y.T. and Hu, H.T. (2022). BIM model management for BIM-based facility
management in buildings. Advances in Civil Engineering, 1: 1901201. https://
doi.org/10.1155/2022/1901201
Manzoor, B., Othman, I., Kang, J.M. and Geem, Z.W. (2021). Influence of building
information modelling (BIM) implementation in high-rise buildings towards
sustainability. Applied Sciences, 11(16): 1–19. https://doi.org/10.3390/
app11167626
Matarneh, S.T., Danso-Amoako, M., Al-Bizri, S., Gaterell, M. and Matarneh,
R.T. (2020). BIM for FM: Developing information requirements to support
facilities management systems. Facilities, 38(5/6): 378–394. https://doi.
org/10.1108/F-07-2018-0084
Matarneh, S.T., Danso-Amoako, M., Al-Bizri, S., Gaterell, M. and Matarneh,
R.T. (2019). Building information modelling for facilities management: A literature
review and future research directions. Journal of Building Engineering, 24:
–11. https://doi.org/10.1016/j.jobe.2019.100755
Ministry of Construction (2021). The combination of BIM and BMS: The optimal
solution for high-rise building operation management technology in Vietnam.
Mui, T.V. and Giang, H.V. (2018). Promoting the application of BIM to investment
projects in the construction of high-rise apartment buildings in Vietnam.
Journal of Science and Technology in Civil Engineering (STCE)–NUCE, 12(1):
–28. https://doi.org/10.31814/stce.nuce2018-12(1)-03
Na, L.T.H. and Hien, A.N.V. (2022). Adapting Vietnam’s urban street house to highrise apartments. FuturArc, 17 March. Available at: https://www.futurarc.com/
commentary/adapting-vietnams-urban-street-house-to-high-rise-apartments
Nguyen, T.A., Do, S.Y., Le-Hoai, L., Nguyen, V.T. and Pham, T.A. (2022). Practical
workflow for cultural heritage digitalization and management: A case study
in Vietnam. International Journal of Construction Management, 23(13): 2305–
https://doi.org/10.1080/15623599.2022.2054268
Nguyen, V.T., Nguyen, T.A., Le, N.M.U. and Nguyen, S.H. (2023). Identifying the
frequency of BIM model information needs to establish a database in the
operation management phase of high-rise buildings. In J.N. Reddy, C.M.
Wang, V.H. Luong and A.T. Le (eds.), Proceedings of the Third International
Conference on Sustainable Civil Engineering and Architecture. Singapore:
Springer Nature, 522–529. https://doi.org/10.1007/978-981-99-7434-4_54
Oxford Economics (2021). Future of construction. Available at: https://www.
oxfordeconomics.com/resource/future-of-construction
Papadonikolaki, E., Krystallis, I. and Morgan, B. (2020). Digital transformation in
construction: Systematic literature review of evolving concepts. Paper
presented at the 18th Annual Engineering Project Organization Conference
(EPOC) 2020. Virtual conference, 21–23 October.
Pinti, L., Codinhoto, R. and Bonelli, S. (2022). A review of building information modelling
(BIM) for facility management (FM): Implementation in public organisations.
Applied Sciences, 12(3): 1–19. https://doi.org/10.3390/app12031540
Quyet, L.N., Trang, N.N. and Canh, L.M. (2018). BIM coordination of high-rise building
projects: Investigating large AEC companies in Southern Vietnam. Journal
of Science and Technology in Civil Engineering (STCE)–NUCE, 12(1): 11–21.
https://doi.org/10.31814/stce.nuce2018-12(1)-02
Sadeh, H., Mirarchi, C., Shahbodaghlou, F. and Pavan, A. (2023). BIM feasibility
for small and medium-sized contractors and subcontractors. International
Journal of Construction Management, 23(6): 999–1008. https://doi.org/10.108
/15623599.2021.1947446
Teicholz, P. (ed.) (2013). BIM for Facility Managers. Hoboken, NJ: John Wiley & Sons.