Building information modelling (BIM) has an established function in clash detection, yet its full potential remains underutilised in the construction industry. This underutilisation is due to the lack of an easy-to-follow guide for practitioners and a general lack of awareness regarding its cost-saving benefits. This article presents a case study demonstrating the application of BIM for clash detection and cost estimation. Revit was adopted to develop three-dimensional (3D) models for architectural and structural systems, while Navisworks was adopted to integrate these models and conduct clash detection. The Malaysian Standard Method of Measurement for Building Works Second Edition (SMM2) was referred to estimate the costs associated with clashes. As a result, 65 relevant clashes were identified in this case study. Categorising these clashes into major, medium and minor categories enabled the prioritisation of critical issues. The study revealed a substantial additional expenditure of MYR60,323.80 required to resolve all identified clashes. This finding underscores the importance of early clash detection to prevent budget overruns. This study contributes to the industry by providing a straightforward and reliable approach for detecting clashes and estimating costs in real-world projects. It also encourages wider adoption of BIM practices within the construction sector.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Akbar, A.R.N., Mohammad, M.F., Ahmad, N. and Maisyam, M. (2015). Adopting standardization in construction environment: Standard method of measurement (SMMs). Procedia – Social and Behavioral Sciences, 170: 37–48. https://doi.org/10.1016/j.sbspro.2015.01.013
Akbar, A.R.N, Sekak, S.N.A.A., Jamaludin, S.Z.H.S., Alih, S.C. and Wahab, S.R.H.A. (2023). A common single standard method of measurement (SMM) for ASEAN countries: An academic perspective. Malaysian Construction Research Journal, 19(2): 23–35.
Akhmetzhanova, B., Nadeem, A., Hossain, A. and Kim, J.R. (2022). Clash detection using building information modeling (BIM) technology in the Republic of Kazakhstan. Buildings, 12(2): 102. https://doi.org/10.3390/buildings
Akponeware, A.O. and Adamu, Z.A. (2017). Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM. Buildings, 7(3): 75–103. https://doi.org/10.3390/buildings7030075
Alone, S.D. (2020). Clash detection and elimination using BIM. International Research Journal of Engineering and Technology, 7(5): 6231–6236.
Anna, B.A., Jaume, R.H., Javier, L.S. and Josep, C.B. (2021). Ǫuantity surveying and BIM 5D: Its implementation and analysis based on a case study approach in Spain. Journal of Building Engineering, 44: 103234. https://doi.org/10.1016/j.jobe.2021.103234
Bapat, H., Sarkar, D. and Gujar, R. (2021). Selection of sustainable materials for energy savings of infrastructure-transportation project in Ahmedabad, India using BIM and FCM. Journal of Construction in Developing Countries, 26(2): 135–161. https://doi.org/10.21315/jcdc2021.26.2.7
Bockstael, D., Candidate, M. and Issa, M.H. (2016). A methodology for contractor clash detection using building information modelling on commercial construction projects. Journal of Information Technology in Construction, 21: 233–249.
Bradley, A., Li, H., Lark, R. and Dunn, S. (2016). BIM for infrastructure: An overall review and constructor perspective. Automation in Construction, 71: 139–152. https://doi.org/10.1016/j.autcon.2016.08.019
Chahrour, R., Hafeez, M.A., Ahmad, A.M., Sulieman, H.I., Dawood, H., Rodriguez-Trejo, S., Kassem, M., Naji, K.K. and Dawood, N. (2020). Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1): 55–72. https://doi.org/10.1080/01446193.2020.1802768
Chidambaram, S. (2020). The application of clash-detection processes in building information modelling for rebars. Proceedings of the Institution of Civil Engineers: Smart Infrastructure and Construction, 172(2): 53–69. https://doi.org/10.1680/jsmic.20.00005
Chiu, W.Y.B. and Lai, J.H.K. (2020). Building information modelling for building services engineering: Benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(9): 2221–2252. https://doi.org/10.1108/ECAM-10-2018-0460
Darwish, A. M., Tantawy, M.M. and Elbeltagi, E. (2020). Critical Success Factors for BIM Implementation in Construction Projects. Saudi Journal of Civil Engineering, 4(9): 180–119. https://doi.org/10.36348/sjce.2020.v04i09.006
Daszczyński, T., Ostapowski, M. and Szerner, A. (2022). Clash cost analysis in electrical installations based on BIM technologies. Energies, 15(5): 1679. https://doi.org/10.3390/en15051679
Doan, D.T., GhaffarianHoseini, A., Naismith, N., Ghaffarianhoseini, A., Zhang, T. and Tookey, J. (2021). Examining critical perspectives on building information modelling (BIM) adoption in New Zealand. Smart and Sustainable Built Environment, 10(4): 594–615. https://doi.org/10.1108/SASBE-04-2020-0043
Eldeep, A.M., Farag, M.A.M. and El-Hafez, L.M.A. (2022). Using BIM as a lean management tool in construction processes: A case study. Ain Shams Engineering Journal, 13(2): 101556. https://doi.org/10.1016/j.asej.2021.07.009
Eleftheriadis, S., Mumovic, D. and Greening, P. (2017). Life cycle energy efficiency in building structures: A review of current developments and future outlooks based on BIM capabilities. Renewable and Sustainable Energy Reviews, 67: 811–825.
European Union (2021). Calculating Costs and Benefits for the Use of Building Information Modelling in Public Tenders: Methodology Handbook. Luxembourg: Publications Office of European Union.
Hasannejad, A., Sardrud, J.M. and Shirzadi Javid, A.A. (2022). BIM-based clash detection improvement automatically. International Journal of Construction Management, 23(14): 2431–2437.
Hu, Y., Castro-Lacouture, D., Eastman, C.M. and Navathe, S.B. (2021). Component change list prediction for BIM-based clash resolution from a graph perspective. Journal of Construction Engineering and Management, 147(8). https://doi.org/10.1061/(ASCE)CO.1943-7862.0002092
Hu, Y.Ǫ., Castro-Lacouture, D. and Eastman, C.M. (2019). Holistic clash detection improvement using a component dependent network in BIM projects. Automation in Construction, 105: 102832. https://doi.org/10.1016/j.autcon.2019.102832
Jiang, F., Ma, L., Broyd, T., Chen, K., Luo, H. and Du, M. (2022). Building demolition estimation in urban road widening projects using as-is BIM models. Automation in Construction, 144: 104601. https://doi.org/10.1016/j.autcon.2022.104601
Kermanshahi, E.K., Tahir, M.B.M., Shukor Lim, N.H.A., Balasbaneh, A.T. and Roshanghalb, S. (2020). Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building. In Proceedings: IOP Conference Series – Earth and Environmental Science. Vol. 476. Bristol: IOP Publishing. https://doi.org/10.1088/1755-1315/476/1/012009
Khawaja, E.U.R. and Mustapha, A. (2021). Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1): 111–130, https://doi.org/10.21315/jcdc2021.26.1.6
Kjartansdóttir, I.B., Mordue, S., Nowak, P., Philp, D. and Snæbjörnsson, J.T. (2017). Building Information Modelling: BIM. Warsaw: Construction Managers’ Library.
Lee, J., Park, Y.J., Choi, C.H. and Han, C.H. (2017). BIM-assisted labor productivity measurement method for structural formwork. Automation in Construction, 84: 121–132. https://doi.org/10.1016/j.autcon.2017.08.009
Lee, T.Y., Ahmad, F. and Sarijari, M.A. (2023). Current status and future research trends of construction labor productivity monitoring: A bibliometric review. Buildings, 13(6): 1479. https://doi.org/10.3390/buildings13061479
Leite, F., Akcamete, A., Akinci, B., Atasoy, G. and Kiziltas, S. (2011). Analysis of modeling effort and impact of different levels of detail in building information models. Automation in Construction, 20(5): 601–609. https://doi.org/10.1016/j.autcon.2010.11.027
Machado, R.L. and Vilela, C. (2020). Conceptual framework for integrating BIM and augmented reality in construction management. Journal of Civil Engineering and Management, 26(1): 83–94. https://doi.org/10.3846/jcem.2020.11803
Matejka, P. and Sabart, D. (2018). Categorization of clashes and their impacts on construction projects. In 17th International Scientific Conference Engineering for Rural Development Proceedings. Vol. 17. Jelgava: Latvia University of Life Sciences and Technologies, 827–835. https://doi.org/10.22616/ERDev2018.17.N102
Mehrbod, S., Staub-French, S., Mahyar, N. and Tory, M. (2019). Beyond the clash: Investigating BIM-based building design coordination issue representation and resolution. Journal of Information Technology in Construction, 24: 33–57.
Monejo, T.B. and Makinde, J.K. (2020). Assessment of the adoption of Building Information Modelling (BIM) in the Nigerian construction industry. Paper presented at the School of Environmental Technology International Conference. Minna, Nigeria, 10–14 August.
Nasuha, A.N., Rahman, R.A. and Haron, A.T. (2023). Design coordination in BIM: Clash resolution process and affecting factors. AIP Conference Proceedings, 2747: 030018. https://doi.org/10.1063/5.0111616
Neelamkavil, J. and Ahamed, S.S. (2012). The return on investment from BIM-driven projects in construction. NRC Publications Archive IRC-RR-324. https://doi. org/10.4224/20374669
Olugboyega, O. (2019). Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2): 27–42. https://doi.org/10.21315/jcdc2018.23.2.3
Othman, I., Al-Ashmori, Y.Y., Rahmawati, Y., Mugahed Amran, Y.H. and Al-Bared, M.A.M. (2021). The level of building information modelling (BIM) implementation in Malaysia. Ain Shams Engineering Journal, 12(1): 455–463. https://doi.org/10.1016/j.asej.2020.04.007
PwC (PricewaterhouseCoopers LLP) (2018). BIM Level 2 Benefits Measurement Methodology. Swindon: Innovate UK.
Roy, A.F.V. and Firdaus, A. (2020). Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2): 199–217. https://doi.org/10.21315/jcdc2020.25.2.8
Saka, A.B. and Chan, D.W.M. (2023). A contextualist perspective to drivers of BIM in the architecture, engineering and construction (AEC) industry. International Journal of Construction Management, 23(14): 2358–2368. https://doi.org/10.1080/15623599.2022.2056806
Sampaio, A.Z., Gomes, N.R., Gomes, A.M. and Sanchez-Lite, A. (2022). Multi-project in an integrated BIM model: Clash detection and construction planning. Journal of Software Engineering and Applications, 15(10): 345–358. https://doi.org/10.4236/jsea.2022.1510020
Sinoh, S.S., Othman, F. and Ibrahim, Z. (2020). Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9): 2737-2765. https://doi.org/10.1108/ECAM-09-2019-0475