Abstract

The construction industry in Malaysia has been facing challenges with disputes in the final account closing in construction projects, which has become a significant concern for industry stakeholders. These disputes often arise due to various factors, making resolving them essential, especially since they can adversely affect construction projects’ cash flow, productivity and reputation. This study aimed to examine the key factors that influence the occurrence of disputes in the final account closing stage of construction projects in Malaysia. A questionnaire survey was conducted to collect quantitative data from construction industry professionals to elicit their agreement on the various contributing factors to final account closing disputes. The data collection included G7 contractors, private clients and quantity surveying (QS) consultants in order, which were identified through a comprehensive literature review. In total, a number of 257 complete responses were gathered. This study found eight key factors that significantly contributed to disputes that hindered the prompt settlement of final accounts in construction projects. The factors were (1) delay in the evaluation and preparation of final accounts, (2) the complexity of variation claims, (3) approval issues related to variation work, (4) disagreements on the valuation of variation works, (5) poor record keeping, (6) late submissions of final claims, (7) disagreements on the valuation of final accounts and (8) cost overruns. Considering that the identification of these key factors is crucial to formulating appropriate strategies to minimise or resolve disputes in the final account closing process, this study is expected to provide information and assist construction stakeholders in adopting effective project management practices throughout the construction process. Accordingly, this reduces the likelihood of disputes and ensures the successful closing of the final account in construction projects.

Article Details

How to Cite
Mohd Khairul Fitri Othman, Zulhabri Ismail, Syamimi Liyana Amat Rais, and Low Sui Pheng. 2025. “Key Factors Leading to Disputes in the Final Account Closing of Construction Projects in Malaysia”. Journal of Construction in Developing Countries 30 (Supp. 1): 1–28. https://doi.org/10.21315/.
Section
Articles

References

Adedokun, O.A., Ibironke, O.T. and Babatunde, S.O. (2013). Assessment of competitive tendering methods of procuring educational building projects in Nigeria. Journal of Facilities Management, 11(1): 81–94. https://doi.org/10.1108/14725961311301484

Ahzami, E. (2017). Factors affecting prompt settlement of final account. PhD diss. Universiti Teknologi Malaysia.

Alhilli, H.K. and Rezoqi, S.I. (2021). Investigating variation orders causes in Iraqi building construction projects. E3S Web of Conferences, 318: 1–9. https://doi.org/10.1051/e3sconf/202131802003

Ameyaw, E.E., Chan, A.P.C., Owusu-Manu, D.-G.G. and Coleman, E. (2015). A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects. Journal of Facilities Management, 13(1): 45–69. https://doi.org/10.1108/JFM-11-2013-0055

Ashworth, A., Hogg, K. and Higgs, C. (2013). Willis’s Practice and Procedure for the Quantity Surveyor. 13th Ed. United Kingdom: John Wiley and Sons.

Badroldin, M.K.A.M., Hamid, A.R.A., Raman, S.A., Zakaria, R. and Mohandes, S.R. (2017). Scenario and impact of late payment in the Malaysian construction industry. In The 1st International Symposium on Expertise of Engineering Design, Universiti Teknologi Malaysia (SEPKA-ISEED’16). Johor, Malaysia: Faculty of Civil Engineering, Universiti Teknologi Malaysia, 798–811

Bakhary, N.A., Adnan, H. and Ibrahim, A. (2018). Construction claim problems in Malaysia: From the contractors perspective. MATEC Web of Conferences, 192: 02004. https://doi.org/10.1051/matecconf/201819202004

. (2015). A study of construction claim management problems in Malaysia. Procedia Economics and Finance, 23: 63–70. https://doi.org/10.1016/s2212-5671(15)00327-5

Baloi, D. and Price, A.D.F. (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4): 261–269. https://doi.org/10.1016/S0263-7863(02)00017-0

Cunningham, T. (2017). What causes cost overruns on building projects? An overview. https://doi.org/10.21427/4hhv-ma36

El-adaway, I., Fawzy, S., Allard, T. and Runnels, A. (2016). Change order provisions under national and international standard forms of contract. Journal of Legal Affiairs and Dispute Resolution in Engineering and Construction, 8(3), 1–12. https://doi.org/10.1061/(asce)la.1943-4170.0000187

El-adaway, I., Fawzy, S., Burrell, H. and Akroush, N. (2017). Studying payment provisions under national and international standard forms of contracts. Journal of Legal Affiairs and Dispute Resolution in Engineering and Construction, 9(2): 1–10. https://doi.org/10.1061/(asce)la.1943-4170.0000200

Fateh, M.A.M. and Nijar, N.N. (2019). Perspective analysis on IBS provision in standard form of contract in Malaysia. Malaysian Construction Research Journal, 6(1): 87–105.

Fateh, M.A.M., Mohamed, M.R. and Omar, S.A. (2022). The involvement of local skilled labour in Malaysia’s construction industry. Frontiers in Built Environment, 8. https://doi.org/10.3389/fbuil.2022.861018

Fellows, R. and Liu, A. (2015). Research Method for Construction. Oxford: John Wiley and Sons.

Garner, J. (2015). Final Account Procedures (1st edition, Issue December). Royal Institution of Chartered Surveyors (RICS). Available at: www.rics.org

Hai, D.T. (2020). Assessment of contractors’ claims on construction projects in Vietnam. The Open Civil Engineering Journal, 13(1): 218–228. https://doi.org/10.2174/1874149501913010218

Hair, J.F., Black, W.C., Babin, B.J. and Anderson, R.E. (2019). Multivariate Data Analysis. 8th Ed. United Kingdom: Cengage Learning.

Hasmori, M.F., Ismail, I. and Said, I. (2012). Issues of late and non-payment among contractors in Malaysia. 3rd International Conference on Business and Economic Research, 2, 82–93.

Hassan, W.N.M.M. (2019). Cause of delay in final account settlement. Master diss. Universiti Teknologi Malaysia.

Hisham, N.K.K. and Othman, M.K.F. (2021). Final account preparation in construction industry: Competencies and challenges of quantity surveyors. International Journal of Service Management and Sustainability, 6(1): 35–50. https://doi.org/10.24191/ijsms.v6i1.12877

Ilmi, H.S. and Yip, H.G. (2014). Factors delaying the final account settlement in Malaysian construction industry. The 18th Pacific Association of Quantity Surveyors (PAQS) Congress 2014. Hong Kong, 158–166.

Ishak, M.F., Alauddin, K. and Ibrahim, M.S.H. (2020). Late and non-payments issues in the malaysian construction industry: perspective of building material suppliers. Malaysian Journal of Sustainable Environment, 6(1): 39. https://doi.org/10.24191/myse.v6i1.8674

Ismail, N., Halim, M.H.A., Ismail, W.N.W., Isa, S.S.M. and Yusop, N. (2023). The project manager’s roles in reducing the occurrence of variation order (VO) on construction project. International Journal of Academic Research in Business and Social Sciences, 13(4): 53–59. https://doi.org/10.6007/ijarbss/v13-i4/15457

Ismail, S., Zakaria, Z. and Yusof, A.M. (2014). Overview to the processes of successful final account closing from project management perspective. International Research Conference on Business Economics and Social Science, 100–105. https://doi.org/10.13140/RG.2.1.3855.4327

Ismail, W.N.W. (2021). Contractual behaviour framework for successful civil engineering projects. PhD diss. Universiti Teknologi MARA.

Jinn, L.S., Hoe, L.W. and Siew, L.W. (2024). A performance study on the potential improvement of construction sector companies in Malaysia. Journal of Advanced Research in Applied Sciences and Engineering Technology, 43(2): 65–74. https://doi.org/10.37934/araset.43.2.6574

Judi, S.S. and Mustaffa, N.E. (2023). Development of a proactive preventive late payment and underpayment solution model for the construction industry. Journal of Legal Affiairs and Dispute Resolution in Engineering and Construction, 15(2): 1–12. https://doi.org/10.1061/JLADAH.LADR-859

Khang, D.B. and Moe, T.L. (2008). Success criteria and factors for international development projects: A life-cycle-based framework. Project Management Journal, 39(1): 72–84. https://doi.org/10.1002/pmj.20034

Kong, S.K. and Yeow, W.S. (2016). The causes of disputes of final accounts: Malaysian case law analysis. INTI International University INTI Journal Special Edition-Built Environment, 58–72.

Krejcie, R.V. and Morgan, D.W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(1): 607–610. https://doi.org/10.1177/001316447003000308

Kwok, C.K. (2009). Study of important factors affecting final account settlement satisfaction of Hong Kong civil engineering projects: Contractors’s perspective. PhD diss. City University of Hong Kong.

Lew, L.P., Tan, H.C. and Wong, S.C.M. (2013). Issues and challenges faced in the management of claims for construction projects. Construction Project Management, 1–40.

Lew, Y.-L., Hassim, S., Muniandy, R. and Hua, L.T. (2018). Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7): 835–860. https://doi.org/10.1108/ECAM-04-2017-0073

Love, P.E.D., Davis, P.R., Cheung, S.O. and Irani, Z. (2011). Causal discovery and inference of project disputes. IEEE Transactions on Engineering Management, 58(3): 400–411. https://doi.org/10.1109/TEM.2010.2048907

Majid, A.M. (2017). Isu-Isu Perundangan Berkaitan Kontrak Binaan. Kuala Lumpur: Dewan Bahasa dan Pustaka.

Matarneh, S. (2024). Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1): 139–161. https://doi.org/10.21315/jcdc-04-23-0043

Mohamad, M.I., Nekooie, M.A. and Kamaruddin, N.B.C. (2012). The adequacy of contractual provisions in managing construction failure in Malaysia. European Journal of Business and Management, 4(1): 22–38.

Morena, M. and Amoah, C. (2021). Assessment of the mitigating measures for cost overruns in the South African construction industry. IOP Conference Series: Earth and Environmental Science, 654(1). https://doi.org/10.1088/1755-1315/654/1/012003

Muhamad, K.H., Ali, N.S. and Najm, B.M. (2021). Assessment of the cost and time impact of variation orders on construction projects in Sulaimani governorate. Journal of Engineering, 27(2): 106–125. https://doi.org/10.31026/j.eng.2021.02.08

Nayan, R. (2021). Framework for the enhancement of valuation of interim payment for quantity surveyors. PhD diss. Universiti Teknologi Malaysia.

Nor, M.R.M. (2024). A strategic action plan for alleviating delays in final account settlement. Master diss. Universiti Teknologi MARA.

Nor, M.R.M., Judi, S.S. and Ismail, Z. (2023). Analyzing pattern and trends for final account issues in the Malaysian construction industry: A thematic review. Malaysian Construction Research Journal (MCRJ), 19(2): 73–86.

Odeyinka, H., Larkin, K., Cunningham, G., McKane, M., Bogle, G. and Weatherup, R. (2011). Development of models for assessing risk impacts on the variability between contract sum and final account. Paper presented at COBRA 2011 Proceedings of RICS Construction and Property Conference. Salford, United Kingdom, 12–13 September.

Offei-Nyako, K., Tham, L.C.O., Bediako, M., Adobor, C. Dela and Asamoah, R.O. (2016). Deviations between contract sums and final accounts: The case of capital projects in Ghana. Journal of Construction Engineering, 2016: 1–8. https://doi.org/10.1155/2016/2814126

Oladapo, A.A. (2007). A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1): 35–48. https://doi.org/10.1108/17260530710746597

Ostertagová, E., Ostertag, O. and Kováč, J. (2014). Methodology and application of the Kruskal-Wallis test. Applied Mechanics and Materials, 611: 115–120. https://doi.org/10.4028/www.scientific.net/AMM.611.115

Othman, M.K.F., Judi, S.S., Ismail, Z. and Pheng, L.S. (2023). Exploring determinants contributing to disputes in the closing of final accounts in the construction industry. International Journal of Sustainable Construction Engineering and Technology, 14(5): 221–233. https://doi.org/10.30880/ijscet.2023.14.05.017

Perera, B.A.K.S. and Dewagoda, K.G. (2020). Streamlining the management of payment delays: The case of Sri Lankan Government building construction projects. Journal of Financial Management of Property and Construction, 26(2): 236–256. https://doi.org/10.1108/JFMPC-05-2020-0041

PAM (Pertubuhan Arkitek Malaysia) (2018). PAM Contract 2018 (with Quantities), Agreement and Condition. Kuala Lumpur: Pertubuhan Arkitek Malaysia

Peters, E., Subar, K. and Martin, H. (2019). Late Payment and nonpayment within the construction industry: Causes, effects and solutions. Journal of Legal Affiairs and Dispute Resolution in Engineering and Construction, 11(3): 1–12. https://doi.org/10.1061/(asce)la.1943-4170.0000314

Rajoo, S. and Singh, K.S.H. (2012). Construction Law in Malaysia. Selangor, Malaysia: West Group.

Ramlee, N., Tammy, N.J., Raja Mohd Noor, R.N.H., Ainun Musir, A., Abdul Karim, N., Chan, H.B. and Mohd Nasir, S.R. (2016). Critical success factors for construction project. AIP Conference Proceedings, 1774(1). https://doi.org/10.1063/1.4965067

Ramli, R.A. (2021). The key constraints to a successful final account closing in construction contract. Master diss. Universiti Teknologi Malaysia.

Romli, H.A. (2015). Delay in settlement of final account. Master diss. Universiti Teknologi Malaysia.

Royal Institution of Chartered Surveyors (2016). Commercial Management of Construction. 1st ed. London: Royal Institution of Chartered Surveyors. Available at: https://www.rics.org/content/dam/ricsglobal/documents/standards/commercial_management_of_construction_1st_edition_rics.pdf

Schmidt, S.K. (2022). Kruskal-Wallis test. In B.B. Frey (ed.), The SAGE Encyclopedia of Research Design. https://doi.org/10.4135/9781071812082.n288

Shehu, Z., Endut, I.R. and Akintoye, A. (2014). Factors contributing to project time and hence cost overrun in the Malaysian construction industry. Journal of Financial Management of Property and Construction, 19(1): 55–75. https://doi.org/10.1108/JFMPC-04-2013-0009

Silva, G.A.S.K., Warnakulasuriya, B.N.F. and Arachchige, B.J.H. (2016). Criteria for construction project success: A literature review. SSRN Electronic Journal, 697–717. https://doi.org/10.2139/ssrn.2910305

Sing, C.P., Love, P.E.D., Smith, J. and Tam, C.-M. (2013). Factors influencing final account settlement in construction projects. In C. Eriksson (Ed.), Royal Institution of Chartered Surveyors, COBRA 2013. London: Royal Institution of Chartered Surveyors (RICS), 1–7.

Ssegawa, J.K., Rwelamila, P.D. and Mogome, M.G. (2020). The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1): 13–23. https://doi.org/10.15641/jcbm.4.1.775

Takim, R., Akintoye, A. and Kelly, J. (2004). Analysis of Effectiveness measures of construction project success in Malaysia. Association of Researchers in Construction Management, 2: 1123–1133. https://doi.org/10.5539/ass.v4n7p74

Yahaya, I., Abidoye, J. and Saidu, I. (2019). Contributions of contracting parties to non-settlement of final accounts in building projects in Abuja, Nigeria. Environmental Technology and Science Journal, 10(2). https://doi.org/http://repository.futminna.edu.ng:8080/jspui/handle/123456789/7617

Yan, F.Y.Y. (2018). Profiling of construction dispute in private project. PhD diss. Universiti Teknologi Malaysia.

Ye, K.M. and Rahman, H.A.D.A. (2010). Risk of late payment in the Malaysian construction industry. World Academy of Science, Engineering and Technology, 65(5): 538–546. https://doi.org/doi.org/10.5281/zenodo.1329721

Zakaria, Z. (2015). Final account closing framework in construction project. PhD Diss. Universiti Teknologi Malaysia.

Zakaria, Z., Ismail, S. and Yusof, A.M. (2022). An overview of comparison between construction contracts in Malaysia: The roles and responsibilities of contract administrator in achieving final account closing success. International Journal of Applied Mathematics and Informatics, 16: 1–8. https://doi.org/10.46300/91014.2022.16.1

. (2014). Modelling the determinants influencing the need of computer simulation framework in improving the closing of final account in construction projects. Advanced Science Letters, 20(1), 321–325. https://doi.org/10.1166/asl.2014.5289

. (2013a). Causes of final account closing delay: A theoretical framework. International Journal of Social, Human Science and Engineering, 7(10): 1290-1296.

. (2013b). Fundamental variables of final account closing success in construction projects in Malaysia. International Journal of Social, Human Science and Engineering, 7(10): 870–875.

. (2012a). Cause and impact of dispute and delay the closing of final account in malaysia construction industry. Journal of Southeast Asian Research, 2012: 1–12. https://doi.org/10.5171/2012.975385

. (2012b). Achieving sustainability in construction through the success of final account closing. International Conference in Humanities, Social Sciences and Global Business Management, 7(7): 45–52.

Zia, S., Khan, A., Tufail, M.M.B., Ismat, J. and Idrees, A. (2022). Impact of social media marketing on consumer-based brand equity. Journal of Marketing Strategies, 4(1): 120–139. https://doi.org/10.52633/jms.v4i1.188