Off-site construction implementation in Bangladesh: A qualitative study
Main Article Content
Abstract
Off-site construction (OSC) offers significant potential to improve efficiency and quality in the construction industry. However, its adoption remains limited in developing countries like Bangladesh. This study aimed to identify key barriers to OSC implementation in Bangladesh and propose strategies to overcome these obstacles. Semi-structured interviews were conducted with 15 construction professionals, including contractors, consultants and government officials. The data was analysed using thematic analysis. Results indicated that the main barriers included a lack of awareness and understanding among stakeholders, insufficient government support, inadequate skills and training, limited transportation infrastructure, high initial costs, resistance to change, a lack of local manufacturing capacity and insufficient collaboration between industry, government and educational institutions. Key strategies for improvement included comprehensive education and training programmes, supportive government policies and incentives, investment in transportation infrastructure, development of local manufacturing capabilities, promotion of research and innovation, implementation of risk management strategies and streamlining of environmental clearance processes. This study provides valuable insights for policymakers and industry leaders to facilitate the adoption of OSC in Bangladesh’s construction sector.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abd Razak, M.I., Khoiry, M.A., Badaruzzaman, W.H.W. and Hussain, A.H. (2022). DfMA for a better industrialised building system. Buildings, 12(6): 794. https://doi.org/10.3390/BUILDINGS12060794
Abdul Hamid, R.Y.A.R. (2019). An integrated approach for sustainability in the application of Industrialised Building System (IBS). International Journal of GEOMATE, 17(61): 115–121. https://doi.org/10.21660/2019.61.4810
Almashaqbeh, M. and El-Rayes, K. (2022). Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10): 3847–3867. https://doi.org/10.1108/ECAM-11-2020-0969
Arif, M., Bendi, D., Sawhney, A. and Iyer, K.C. (2012a). State of offsite construction in India-drivers and barriers. Journal of Physics: Conference Series, 364: 012109. https://doi.org/10.1088/1742-6596/364/1/012109
Arif, M., Bendi, D., Toma-Sabbagh, T. and Sutrisna, M. (2012b). Construction waste management in India: An exploratory study. Construction Innovation, 12(2): 133–155. https://doi.org/10.1108/14714171211215912/FULL/XML
Assaad, R.H., El-adaway, I.H., Hastak, M. and Needy, K.L. (2022a). Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158. https://doi.org/10.1061/JCEMD4.COENG-12654
. (2022b). The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002314
Beulah, F. (2022). Challenges faced in prefabrication or modular construction. International Journal for Research in Applied Science and Engineering Technology, 10(1): 168–178. https://doi.org/10.22214/ijraset.2022.39789
Blismas, N. and Wakefield, R. (2009). Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1): 72–83. https://doi.org/10.1108/14714170910931552
Charlson, J. and Dimka, N. (2021). Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4): 800–817. https://doi.org/10.1108/ci-10-2019-0108
Chowdhury, R. (2022). Adoption of prefabricated construction in Bangladesh: Prospects adoption of prefabricated construction in Bangladesh. Paper presented at the 3rd International Conference on Research and Innovation in Civil Engineering. Chattogram, Bangladesh, 5–6 January.
Datta, S.D. and Assafi, M.N. (2022). Offsite construction in Bangladesh: Barriers and future. Paper presented at the 6th International Conference on Civil Engineering for Sustainable Development (ICCESD 2022). Khulna, Bangladesh, 10–12 February.
Datta, S.D., Sobuz, Md.H.R., Nafe Assafi, M., Sutan, N.M., Islam, M.N., Mannan, M.B., Akid, A.S.M. and Hasan, N.M.S. (2023). Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3): 482–511. https://doi.org/10.1108/ijbpa-01-2022-0006
Gan, X., Chang, R. and Wen, T. (2018). Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis. Journal of Cleaner Production, 201: 735–747. https://doi.org/10.1016/j.jclepro.2018.07.299
Gan, X., Chang, R., Zuo, J., Wen, T. and Zillante, G. (2018). Barriers to the transition towards off-site construction in China: An interpretive structural modeling approach. Journal of Cleaner Production, 201: 8–18. https://doi.org/10.1016/j.jclepro.2018.06.184
Ginigaddara, B., Perera, S., Feng, Y., Rahnamayiezekavat, P. and Thomson, R. (2023). Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10): 820–839. https://doi.org/10.1080/01446193.2023.2209667
Hwang, B.-G., Shan, M. and Looi, K.-Y. (2018). Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production, 183: 183–193. https://doi.org/10.1016/j.jclepro.2018.02.136
Jaillon, L. and Poon, C.S. (2010). Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10): 1025–1042. https://doi.org/10.1080/01446193.2010.498481
Jalil, M.A. and Mia, M.T. (2021). The role of Padma Multipurpose Bridge in the national sustainable development in Bangladesh. Journal of Asian and African Social Science and Humanities, 7(1): 38–53.
Jang, J., Ahn, S., Cha, S.H., Cho, K., Koo, C. and Kim, T.W. (2021). Toward productivity in future construction: Mapping knowledge and finding insights for achieving successful offsite construction projects. Journal of Computational Design and Engineering, 8(1): 1–14. https://doi.org/10.1093/jcde/qwaa071
Jin, R., Gao, S., Cheshmehzangi, A. and Aboagye-Nimo, E. (2018). A holistic review of off-site construction literature published between 2008 and 2018. Journal of Cleaner Production, 202: 1202–1219. https://doi.org/10.1016/j.jclepro.2018.08.195
Jin, R., Hong, J. and Zuo, J. (2020). Environmental performance of off-site constructed facilities: A critical review. Energy and Buildings, 207: 109567. https://doi.org/10.1016/J.ENBUILD.2019.109567
Jung, S. and Yu, J. (2022). Design for manufacturing and assembly (DfMA) checklists for off-site construction (OSC) projects. Sustainability, 14(19): 11988. https://doi.org/10.3390/su141911988
Kurpinska, M., Grzyl, B. and Kristowski, A. (2019). Cost analysis of prefabricated elements of the ordinary and lightweight concrete walls in residential construction. Materials, 12(21): 3629. https://doi.org/10.3390/MA12213629
Li, Z., Zhang, S. and Meng, Q. (2021). Modeling adoption behavior of prefabricated building with multiagent interaction: System dynamics analysis based on data of Jiangsu Province. Computational Intelligence and Neuroscience, 1: 3652706. https://doi.org/10.1155/2021/3652706
Lu, W., Lee, W.M.W., Xue, F. and Xu, J. (2021). Revisiting the effects of prefabrication on construction waste minimization: A quantitative study using bigger data. Resources, Conservation and Recycling, 170: 105579. https://doi.org/10.1016/j.resconrec.2021.105579
Mao, C., Shen, Q., Asce, M., Pan, W. and Ye, K. (2013). Major barriers to off-site construction: The developer’s perspective in China. Journal of Management in Engineering, 31(3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246
Mohammad, M.F., Baharin, A.S., Musa, M.F. and Yusof, M.R. (2016). The potential application of IBS modular system in the construction of housing scheme in Malaysia. Procedia - Social and Behavioral Sciences, 222: 75–82. https://doi.org/10.1016/J.SBSPRO.2016.05.189
Muhammad, W.M.N.W., Azman, M.A., Othman, M.K.F., Hadi, N.A., Sahimi, S.N.S. and Mohammad, M.F. (2016). The insight of industrialised building system (IBS) by Bumiputera construction players. MATEC Web of Conferences, 47: 04013. https://doi.org/10.1051/matecconf/20164704013
Musa, M.F., Mohammad, M.F., Mahbub, R. and Yusof, M.R. (2018). Adopting modular construction in the Malaysian construction industry. Asian Journal of Environment-Behaviour Studies, 3(10): 1–9. https://doi.org/10.21834/AJE-BS.V3I10.307
Pan, W., Gibb, A.G.F. and Dainty, A.R.J. (2012). Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11): 1331–1340. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544
Rahman, M.M. and Asce, M. (2013). Barriers of implementing modern methods of construction. Journal of Management in Engineering, 30(1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173
Razkenari, M., Fenner, A., Shojaei, A., Hakim, H. and Kibert, C. (2020). Perceptions of offsite construction in the United States: An investigation of current practices. Journal of Building Engineering, 29: 101138. https://doi.org/10.1016/j.jobe.2019.101138
Salama, T., Moselhi, O. and Al-Hussein, M. (2021). Overview of the characteristics of the modular industry and barriers to its increased market share. International Journal of Industrialized Construction, 2(1): 30–53. https://doi.org/10.29173/IJIC249
Shahzad, W.M., Rajakannu, G. and Kordestani Ghalenoei, N. (2022). Potential of modular offsite construction for emergency situations: A New Zealand study. Buildings 2022, 12(11): 1970. https://doi.org/10.3390/BUILDINGS12111970
Sharma, G. (2017). Pros and cons of different sampling techniques. International Journal of Applied Research, 3(7): 749–752.
Song, Y., Wang, J., Guo, F., Lu, J. and Liu, S. (2021). Research on supplier selection of prefabricated building elements from the perspective of sustainable development. Sustainability, 13(11): 6080. https://doi.org/10.3390/su13116080
Sourav, M.M.I., Afnanin, S. and Islam, M.R. (2023). Impact of Padma Bridge on transportation system: A case study for Barisal Division. Journal of Engineering and Applied Science, 70(1): 1–14. https://doi.org/10.1186/S44147-023-00299-1/TABLES/4
Sutrisna, M., Cooper-Cooke, B., Goulding, J. and Ezcan, V. (2019). Investigating the cost of offsite construction housing in Western Australia. International Journal of Housing Markets and Analysis, 12(1): 1753–8270. https://doi.org/10.1108/IJHMA-05-2018-0029
Sutrisna, M., Ramnauth, V. and Zaman, A. (2022). Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders. Architectural Engineering and Design Management, 18(3): 165–183. https://doi.org/10.1080/17452007.2020.1807306
World Bank Group (2021). Country Private Sector Diagnostic: Creating Markets in Bangladesh – Unleashing the Private Sector to Sustain Development Success. Washington, DC: World Bank Group.
Zhang, H. and Yu, L. (2021). Resilience-cost tradeoff supply chain planning for the prefabricated construction project. Journal of Civil Engineering and Management, 27(1): 45–59. https://doi.org/10.3846/JCEM.2021.14114
Zhang, X., Skitmore, M. and Peng, Y. (2014). Exploring the challenges to industrialized residential building in China. Habitat International, 41: 176–184. https://doi.org/10.1016/j.habitatint.2013.08.005