Exploring Individual Functional Competency in Organisational Building Information Modelling Environments: Architects’ Experiences and Perspectives

Main Article Content

Syafizal Shahruddin
Mohd Khairul Amri Ramly
Rahimi A. Rahman
Shakil Ahmed

Abstract

The recent National Building Information Modelling (BIM) Roadmap 2030 in Malaysia repositions BIM as a core organisational capability embedded within existing professional roles, rather than relying on external BIM specialists. Architects, traditionally seen as natural leaders, are now expected to integrate BIM into daily practice, making project success increasingly dependent on internal organisational readiness. However, most studies remain project-focused, overlooking how functional competencies—the application of cognitive and personal skills in practice—are enacted within organisations, particularly from the perspective of individuals experiencing them firsthand. Therefore, this study aims to gain an in-depth understanding of architects’ functional competency in specific BIM-related tasks within organisational settings. This qualitative study employed written account exercises and in-depth, semi-structured interviews to unpack the subjective experiences of architects within such an environment. Thematic analysis revealed five key functional competency themes: business management, process management, people management, technology management and knowledge management. These findings advance the competency literature by providing a grounded understanding of how architects enact functional competencies in organisational BIM environments. They also provide a foundation for developing theoretical frameworks that link individual BIM competencies to broader organisational capabilities. Practically, the findings support organisations in anticipating market trends, designing change management strategies and fostering a culture of continuous BIM improvement. Additionally, the identified themes can inform the development of benchmarking tools to assess and enhance organisational BIM capability.

Article Details

How to Cite
Syafizal Shahruddin, Mohd Khairul Amri Ramly, Rahimi A. Rahman, and Shakil Ahmed. 2025. “Exploring Individual Functional Competency in Organisational Building Information Modelling Environments: Architects’ Experiences and Perspectives”. Journal of Construction in Developing Countries 30 (Supp. 2): 193-216. https://doi.org/10.21315/.
Section
Articles

References

Abbasnejad, B., Nepal, M.P., Ahankoob, A., Nasirian, A. and Drogemuller, R. (2021a). Building information modelling (BIM) adoption and implementation enablers in AEC firms: A systematic literature review. Architectural Engineering and Design Management, 17(5–6): 411–433. https://doi.org/10.1080/17452007.2020.1793721

Abbasnejad, B., Nepal, M.P., Mirhosseini, S.A., Moud, H.I. and Ahankoob, A. (2021b). Modelling the key enablers of organizational building information modelling (BIM) implementation: An interpretive structural modelling (ISM) approach. Journal of Information Technology in Construction, 26: 974–1008. https://doi.org/10.36680/j.itcon.2021.052

Abdirad, H. and Dossick, C.S. (2021). BIM technologies, tools and skills. In M.R. Hosseini, F. Khosrowshahi, A. Aibinu and S. Abrishami (eds.), BIM Teaching and Learning Handbook. 1st Ed. London: Routledge, 23–47. https://doi.org/10.1201/9780367855192-4

Adekunle, S.A., Aigbavboa, C.O. and Ejohwomu, O.A. (2024). Understanding the BIM actor role: A study of employer and employee preference and availability in the construction industry. Engineering, Construction and Architectural Management, 31(13): 160–180. https://doi.org/10.1108/ECAM-08-2021-0714

Ahuja, R., Sawhney, A. and Arif, M. (2018). Developing organizational capabilities to deliver lean and green project outcomes using BIM. Engineering, Construction and Architectural Management, 25(10): 1255–1276. https://doi.org/10.1108/ECAM08-2017-0175

Alieh, L.A., Hosseini, M.R., Martek, I., Wu, W. and Arashpour, M. (2025). Bridging the gap: Assessing the person-organization fit between BIM education and industry expectations in Australia. Engineering, Construction and Architectural Management, 32(6): 3760–3778. https://doi.org/10.1108/ECAM-04-2023-0366

Ataman, C. and Dino, İ.G. (2022). Performative design processes in architectural practices in Turkey: Architects’ perception. Architectural Engineering and Design Management, 18(5): 690–704. https://doi.org/10.1080/17452007.2021.1995315

Badran, D., AlZubaidi, R. and Venkatachalam, S. (2023). Identification of key design phase-related risks in DBB projects in the UAE: Towards developing a BIM solution. Sustainability, 15(8): 6651. https://doi.org/10.3390/su15086651

Berita Arkitek (2021). Clients perception survey. March. Available at: http://www.pam.org.my/images/publications/ba2021/mar/#p=1 [Accessed on 13 October 2025].

Boyatzis, R.E. (1982). The Competent Manager: A Model for Effective Performance. 1st Ed. Hoboken, NJ: John Wiley & Sons, Inc.

Braun, V. and Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2): 77–101. https://doi.org/10.1191/1478088706qp063oa

British Standards Institution (BSI) (2018). BS EN ISO 19650-1: Organization and Digitization of Information About Buildings and Civil Engineering Works, Including Building Information Modelling (BIM) – Information Management Using Building Information Modelling – Part 1: Concepts and Principles. Geneva: BSI.

Cheetham, G. and Chivers, G. (1998). The reflective (and competent) practitioner: A model of professional competence which seeks to harmonise the reflective practitioner and competence-based approaches. Journal of European Industrial Training, 22(7): 267–276. https://doi.org/10.1108/03090599810230678

Chen, G., Chen, J., Tang, Y., Ning, Y. and Li, Q. (2022). Collaboration strategy selection in BIM-enabled construction projects: A perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(7): 2689–2713. https://doi.org/10.1108/ECAM-01-2021-0004

Construction Industry Development Board Malaysia (CIDB) (2020). Construction 4.0 Strategic Plan (2021–2025). Next Revolution of the Malaysian Construction Industry. Kuala Lumpur: CIDB.

Daniotti, B., Pavan, A., Lupica Spagnolo, S., Caffi, V., Pasini, D. and Mirarchi, C. (2020). Standardized guidelines for the creation of BIM objects. In B. Daniotti, A. Pavan, S. Lupica Spagnolo, V. Caffi, D. Pasini and C. Mirarchi (eds.), BIM-based Collaborative Building Process Management. Cham: Springer, 39–70. https://doi.org/10.1007/978-3-030-32889-4_3

Daymond, J., Knight, E., Rumyantseva, M. and Maguire, S. (2023). Managing ecosystem emergence and evolution: Strategies for ecosystem architects. Strategic Management Journal, 44(4): O1–O27. https://doi.org/10.1002/smj.3449

Ferreira, R.C., Rocha, P.N., Pereira, L.M., Codinhoto, R. and Fabricio, M.M. (2022). Learning on the job through collaborative learning: Analysing the appropriation of BIM knowledge in micro-enterprise architectural design companies. IOP Conference Series: Earth and Environmental Science, 1101(3): 032009. https://doi.org/10.1088/1755-1315/1101/3/032009

Frimpong, S. and Dansoh, A. (2018). Marginalization and invasion of architects’ role on house projects: Institutional intervention inadequacy and super wicked problems. Frontiers of Architectural Research, 7(3): 292–303. https://doi.org/10.1016/j.foar.2018.04.001

Godager, B., Onstein, E. and Huang, L. (2021). The concept of enterprise BIM: Current research practice and future trends. IEEE Access, 9: 42265–42290. https://doi.org/10.1109/ACCESS.2021.3065116

Graham, P., Nikolova, N. and Sankaran, S. (2020). Tension between leadership archetypes: Systematic review to inform construction research and practice. Journal of Management in Engineering, 36(1): 3119002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000722

Harzani, E. (2021). Better by design. Heights, 3: 25–30.

Ibrahim, F.S., Esa, M. and Mustafa Kamal, E. (2019). Towards construction 4.0: Empowering BIM skilled talents in Malaysia. International Journal of Scientific and Technology Research, 8(10): 1694–1700.

Implementation Coordination Unit (2024). BIM roadmap report. Paper presented at the Bengkel Pembangunan BIM Roadmap 2025–2030. Selangor, Malaysia, 23 May.

Jabatan Kerja Raya (JKR) (2021). BIM: Garis Panduan JKR. Kuala Lumpur: Cawangan Perancangan Aset Bersepadu, JKR Malaysia.

Khamis, A.A., Ibrahim, S.A., Khateb, M.A., Abdel-Fatah, H. and Barakat, M.A. (2022). Introducing the architecture parametric design procedure: From concept to execution. IOP Conference Series: Earth and Environmental Science, 1056(1): 012004. https://doi.org/10.1088/1755-1315/1056/1/012004

Langdridge, D. (2007). Phenomenological Psychology: Theory, Research and Method. 1st Ed. London: Pearson Education Limited.

Lee, I.-G., Kim, H.-M. and Choi, J.-W. (2022). A study on the derivation of Korean common data environment (CDE) requirements based on ISO 19650 for BIM sharing, collaboration and management. Journal of KIBIM, 12(4): 93–103. https://doi.org/https://doi.org/10.13161/kibim.2022.12.4.093

Lee, J.H., Ostwald, M.J., Arasteh, S. and Oldfield, P. (2023). BIM-enabled design collaboration processes in remote architectural practice and education in Australia. Journal of Architectural Engineering, 29(1). https://doi.org/10.1061/jaeied.aeeng-1505

Lester, S. (2017). Professional competence standards: Guide to concepts and development. Available at: https://devmts.org.uk/pubs.htm [Accessed on 13 October 2025].

Lindseth, A. and Norberg, A. (2004). A phenomenological hermeneutical method for researching lived experience. Scandinavian Journal of Caring Sciences, 18(2): 145–153. https://doi.org/10.1111/j.1471-6712.2004.00258.x

Majzoub, M. and Eweda, A. (2021). Probability of winning the tender when proposing using BIM strategy: A case study in Saudi Arabia. Buildings, 11(7): 306. https://doi.org/10.3390/buildings11070306

Makabate, C.T., Musonda, I., Okoro, C.S. and Chileshe, N. (2022). Scientometric analysis of BIM adoption by SMEs in the architecture, construction and engineering sector. Engineering, Construction and Architectural Management, 29(1): 179–203. https://doi.org/10.1108/ECAM-02-2020-0139

Makhambetova, Z.T. and Magauova, A.S. (2023). Professional competences in the context of inclusive education: A model design. European Journal of Educational Research, 12(1): 201–211. https://doi.org/10.12973/eu-jer.12.1.201

Mansfield, B. and Mitchell, L. (1997). Towards a Competent Workforce. Hampshire, England: Gower Publishing Company Ltd.

Martin, H., Watson, C. and Brooks, T. (2025). Synergizing BIM and RIBA in architectural practice: Technology workflow efficiencies, challenges and insights. Architectural Engineering and Design Management, 21(1): 35–59. https://doi.org/10.1080/17452007.2024.2361284

Matthews, J., Love, P.E.D., Mewburn, J., Stobaus, C. and Ramanayaka, C. (2018). Building information modelling in construction: Insights from collaboration and change management perspectives. Production Planning and Control, 29(3): 202–216. https://doi.org/10.1080/09537287.2017.1407005

Mehrbod, S., Staub-French, S. and Tory, M. (2020). BIM-based building design coordination: Processes, bottlenecks and considerations. Canadian Journal of Civil Engineering, 47(1): 25–36. https://doi.org/10.1139/cjce-2018-0287

Kementerian Ekonomi Malaysia (2025). Rancangan Malaysia Ketiga Belas 2026–2030: Melakar semula pembangunan. Available at: https://rmk13.ekonomi.gov.my/ [Accessed on 13 October 2025].

Kementerian Kewangan Malaysia (2025). Pekeliling baharu PK 1.15: Pelaksanaan building information modelling (BIM). Avilable at: https://ppp.treasury.gov.my/ [Accessed on 13 October 2025].

Mohd Noor, M.Z. (2021). Illustrasi Ringkas Analisa Tematik (AT) Menggunakan Perisian ATLAS.ti 8. 1st Ed. Selangor, Malaysia: Penerbit UPM.

Musarat, M.A., Alaloul, W.S., Zainuddin, S.M., Qureshi, A.H. and Maqsoom, A. (2024). Digitalization in Malaysian construction industry: Awareness, challenges and opportunities. Results in Engineering, 21: 102013. https://doi.org/10.1016/j.rineng.2024.102013

Olatunji, O.A. (2019). Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(7): 1240–1260. https://doi.org/10.1108/ECAM-04-2018-0173

Papadonikolaki, E. (2020). The digital supply chain: Mobilising supply chain management philosophy to reconceptualise digital technologies and building information modelling (BIM). In S. Pryke (ed.), Successful Construction Supply Chain Management. Hoboken, NJ: John Wiley & Sons, Inc., 13–41. https://doi.org/10.1002/9781119450535.ch2

Patacas, J., Dawood, N. and Kassem, M. (2020). BIM for facilities management: A framework and a common data environment using open standards. Automation in Construction, 120: 103366. https://doi.org/10.1016/j.autcon.2020.103366

Phung, Q. and Tong, N. (2021). Developing an organizational readiness framework for BIM implementation in large design companies. International Journal of Sustainable Construction Engineering and Technology, 12(3): 57–67. https://doi.org/10.30880/ijscet.2021.12.03.006

Pimenta, M.L. and Piato, É.L. (2016). Cognitive relationships between automobile attributes and personal values. Asia Pacific Journal of Marketing and Logistics, 28(5): 841–861. https://doi.org/10.1108/APJML-09-2015-0147

Ramly, M.K.A., Mohamad, M.F. and Noor, S.N.A.M. (2023). Building information modelling (BIM) as “disruptive technology”: An insight of construction service provider. AIP Conference Proceedings, 2484(1): 050006. https://doi.org/10.1063/5.0109977

Sampaio, S., Wu, Q., Cormican, K. and Varajão, J. (2022). Reach for the sky: Analysis of behavioral competencies linked to project success. International Journal of Managing Projects in Business, 15(1): 192–215. https://doi.org/10.1108/IJMPB-09-2020-0276

Shahruddin, S., Sonet, U.N., Azmi, A. and Zainordin, N. (2025). Traversing the complexity of digital construction and beyond through soft skills: Experiences of Malaysian architects. Engineering, Construction and Architectural Management, 32(11): 7373–7398. https://doi.org/10.1108/ECAM-01-2024-0147

Shahruddin, S., Zairul, M. and Haron, A.T. (2021). Redefining the territory and competency of architectural practitioners within a BIM-based environment: A systematic review. Architectural Engineering and Design Management, 17(5–6): 376–410.

https://doi.org/10.1080/17452007.2020.1768506

Shahruddin, S., Zairul, M., Haron, A.T. and Fared, M.M. (2022). Performance-based identity in a BIM environment: An architect’s perceptions and experiences. Open House International, 47(4): 710–731. https://doi.org/10.1108/OHI-07-2021-0147

Sinoh, S.S., Othman, F. and Ibrahim, Z. (2020). Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9): 2737–2765. https://doi.org/10.1108/ECAM-09-2019-0475

Spencer, L.M. and Spencer, S.M. (1993). Competence at Work: Models for Superior Performance. 1st Ed. Hoboken, NJ: John Wiley & Sons, Inc.

Trenerry, B., Chng, S., Wang, Y., Suhaila, Z.S., Lim, S.S., Lu, H.Y. and Oh, P.H. (2021). Preparing workplaces for digital transformation: An integrative review and framework of multi-level factors. Frontiers in Psychology, 12: 620766. https://doi.org/10.3389/fpsyg.2021.620766

Van Doorn, J.R. and Raz, C.J. (2023). Leader motivation identification: Relationships with goal-directed values, self-esteem, self-concept clarity and self-regulation. Frontiers in Organizational Psychology, 1: 1241132. https://doi.org/10.3389/forgp.2023.1241132

Waqar, A., Qureshi, A.H. and Alaloul, W.S. (2023). Barriers to building information modeling (BIM) deployment in small construction projects: Malaysian construction industry. Sustainability, 15(3): 2477. https://doi.org/10.3390/su15032477

Wethyavivorn, P. and Teerajetgul, W. (2020). Tacit knowledge capture in Thai design and consulting firms. Journal of Construction in Developing Countries, 25(1): 45–62. https://doi.org/10.21315/jcdc2020.25.1.3

Wu, S., Zhang, N., Xiang, Y., Wu, D., Qiao, D., Luo, X. and Lu, W.Z. (2022). Automated layout design approach of floor tiles: Based on building information modeling (BIM) via parametric design (PD) platform. Buildings, 12(2): 250. https://doi.org/10.3390/buildings12020250

Wu, W., Mayo, G.K., McCuen, T.L., Issa, R.R.A. and Smith, D.K. (2021). Developing BIM Talent: A Guide to the BIM Body of Knowledge with Metrics, KSAs and Learning Outcomes. Hoboken, NJ: John Wiley & Sons, Inc.

Zhang, J., Zhang, Z., Philbin, S.P., Huijser, H., Wang, Q. and Jin, R. (2022). Toward nextgeneration engineering education: A case study of an engineering capstone project based on BIM technology in MEP systems. Computer Applications in Engineering Education, 30(1): 146–162. https://doi.org/10.1002/cae.22448