Cost Overrun Prediction Model for Petrochemical Projects in Iran
Main Article Content
Abstract
Cost overrun classification is a critical aspect of project management in Iran’s petrochemical industry, demanding accurate predictive models to inform decision-making and mitigate risks effectively. This article focuses on developing a decision tree-based predictive model specifically tailored to classify cost overrun levels as high, moderate and low. Machine learning techniques extract transparent and interpretable rules for cost overrun classification using a rule-based approach within the decision tree framework. The process involves meticulously extracting rules from the decision tree model to provide actionable guidelines based on locally relevant risk factors. The results demonstrate the model’s effectiveness in systematically assessing risk factors and accurately predicting cost overrun classifications. Thirteen rules are extracted, each constituting a unique combination of conditions leading to a specific classification outcome, enhancing the model’s validity and reliability. The successful completion of this phase delivers a valuable predictive tool for project managers and stakeholders in Iran’s petrochemical industry. The developed decision tree model allows stakeholders to navigate cost overrun challenges effectively and optimise project outcomes by enabling informed decision-making and proactive risk management.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abbasi, O., Noorzai, E., Jafari, K.G. and Golabchi, M. (2020). Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran. Journal of Architectural Engineering, 26(3): 05020008. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431
Abusafiya, H.A.M. and Suliman, S.M.A. (2017). Causes and effects of cost overrun on construction project in Bahrain: Part I (ranking of cost overrun factors and risk mapping). Modern Applied Science, 11(7): 20. https://doi.org/10.5539/mas.v11n7p20
Ahady, S., Gupta, S. and Malik, R.K. (2017). A critical review of the causes of cost overrun in construction industries in developing countries. International Research Journal of Engineering and Technology, 4(3): 2550–2558.
Akhund, M.A., Khoso, A.R., Khan, J.S., Imad, H.U. and Memon, K.M. (2019). Prompting cost overrun factors during PCP in construction projects. Indian Journal of Science and Technology, 12(4). https://doi.org/10.17485/ijst/2019/v12i4/140936
Alemu, S.K. (2022). Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5): 2183–2206. https://doi.org/10.1108/ECAM-11-2020-0975
Allahaim, F. and Liu, L. (2015). Causes of cost overruns on infrastructure projects in Saudi Arabia. International Journal of Collaborative Enterprise, 5(1/2): 32–57. https://doi.org/10.1504/IJCENT.2015.073176
Amini, S., Rezvani, A. and Tabasi, M. (2021). Identification and ranking significant factors causing cost overrun in the design and construction process of buildings using the BWM method (case study: City of Mashhad). Urban Management Studies, 12(44): 67–83.
Amini, S., Rezvani, A., Tabassi, M. and Sadati, S.S.M. (2023). Causes of cost overruns in building construction projects in Asian countries: Iran as a case study. Engineering, Construction and Architectural Management, 30(7): 2739–2766. https://doi.org/10.1108/ECAM-05-2021-0445
Ammar, T., Abdel-Monem, M. and El-Dash, K. (2022). Risk factors causing cost overruns in road networks. Ain Shams Engineering Journal, 13(5): 101720. https://doi.org/10.1016/j.asej.2022.101720
Ashtari, M.A., Ansari, R., Hassannayebi, E. and Jeong, J. (2022). Cost overrun risk assessment and prediction in construction projects: A Bayesian network classifier approach. Buildings, 12(10): 1660. https://doi.org/10.3390/buildings12101660
Aung, T., Liana, S.R., Htet, A. and Bhaumik, A. (2023). Using machine learning to predict cost overruns in construction projects. Journal of Technology Innovations and Energy, 2(2): 1–7. https://doi.org/10.56556/jtie.v2i2.511
Balaji, H.V. and Venugopal, P. (2020). Impact of cost overrun factors in constructing apartments in Tamil Nadu. International Journal of Innovative Technology and E”ploring Engineering, 9(3): 456–459. https://doi.org/10.35940/ijitee.C8092.019320
Balali, V., Zalavadia, A. and Heydarian, A. (2020). Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001752
Balta, G.C.K., Dikmen, I. and Birgonul, M.T. (2021). Bayesian network-based decision support for predicting and mitigating delay risk in TBM tunnel projects. Automation in Construction, 129: 103819. https://doi.org/10.1016/j.autcon.2021.103819
Bentil, E., Nana-Addy, R.E., Asare, E.K. and Fokuo-Kusi, A. (2017). The level of existence and impact of cost and time overruns of building construction projects in Ghana. Civil and Environmental Research, 9: 36–46.
Bishnoi, S. and Hooda, B.K. (2022). Decision tree algorithms and their applicability in agriculture for classification. Journal of E”perimental Agriculture International, 44(7): 20–27. https://doi.org/10.9734/jeai/2022/v44i730833
Car-Pušić, D., Tijanić, K., Marović, I. and Mlađen, M. (2020). Predicting buildings construction cost overruns on the basis of cost overruns structure. Scientific Review: Engineering and Environmental Studies, 29(3): 366–376. https://doi.org/10.22630/PNIKS.2020.29.3.31
Creswell, J.W. and Clark, V.L.P. (2017). Designing and Conducting Mi”ed Methods Research. 3rd Ed. Thousand Oaks, CA: SAGE Publications.
Dabirian, S., Khanzadi, M. and Abdollahi, M. (2020). Investigation of the most important factors affecting cost overruns in construction projects using hybrid system dynamic and DEMATEL method. Sharif Journal of Civil Engineering, 36(2): 13–28. https://doi.org/10.24200/j30.2019.51915.2482
Derakhshanalavijeh, R. and Teixeira, J.M.C. (2017). Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study. Journal of Civil Engineering and Management, 23(1): 125–136. https://doi.org/10.3846/13923730.2014.992467
Durdyev, S., Ismail, S. and Abu Bakar, N. (2012). Factors causing cost overruns in construction of residential projects; case study of turkey. International Journal of Science and Management, 1(1): 3–12.
El-Dash, K.M.M., Ramadan, O.M.O. and Youssef, W.M.M.A. (2019). Duration prediction models for construction projects in the Middle East. Engineering, Technology and Applied Science Research, 9(2): 3924–3932. https://doi.org/10.48084/etasr.2531
Eltoukhy, M.G. and Nassar, A.H. (2021). Using support vector machine (SVM) for time and cost overrun analysis in construction projects in Egypt. International Journal of Civil Engineering and Technology, 12(3): 5–22. https://doi.org/10.34218/IJCIET.12.3.2021.002
Esmaeili, I. and Kashani, H. (2022). Managing cost risks in oil and gas construction projects: root causes of cost overruns. ASCE-ASME Journal of Ris½ and Uncertainty in Engineering Systems, Part A: Civil Engineering, 8(1): 04021072. https://doi.org/10.1061/AJRUA6.0001193
Farzanegan, M.R. and Batmanghelidj, E. (2023). Understanding economic sanctions on Iran: A survey. The Economists’ Voice, 20(2): 197–226. https://doi.org/10.1515/ev-2023-0014
Flyvbjerg, B. and Bester, D.W. (2022). How (in)accurate is cost-benefit analysis? Data, explanations and suggestions for reform. In J.A. Gómez-Ibáñez and Z. Liu (eds.), Infrastructure Economics and Policy: International Perspectives. Cambridge, MA: Lincoln Institute of Land Policy, 174–196.
Flyvbjerg, B., Skamris Holm, M.K. and Buhl, S.L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1): 71–88. https://doi.org/10.1080/01441640309904
Gebrehiwet, T. and Luo, H. (2017). Analysis of delay impact on construction project based on RII and correlation coefficient: Empirical study. Procedia Engineering, 196: 366–374. https://doi.org/10.1016/j.proeng.2017.07.212
Ghazal, M.M. and Hammad, A. (2022). Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9): 1632–1646. https://doi.org/10.1080/15623599.2020.1738205
Ghazizade, M.J., Koulivand, H., Safari, E. and Heidari, L. (2021). Petrochemical waste characterization and management at Pars Special Economic Energy Zone in the south of Iran. Waste Management & Research: The Journal for a Sustainable Circular Economy, 39(2): 199–208. https://doi.org/10.1177/0734242X20922585
Gotlur, K., Pujar, G., Nayak, S. and Bh, J.R. (2020). Review on prediction of cost overrun in construction projects using non-traditional methods. International Research Journal of Engineering and Technology, 7(4): 5728–5733.
Gupta, C. and Kumar, C. (2020). Study of factors causing cost and time overrun in construction projects. International Journal of Engineering Research and Technology, 9(10): 202–206.
Heravi, G. and Mohammadian, M. (2021). Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 21(9): 958–968. https://doi.org/10.1080/15623599.2019.1601394
Ibrahim, A.K., Yasin, M.N.B. and Hassan, M.H. (2024). A Study on causative factors of cost overrun in construction projects in Mogadishu, Somalia. Tropical Scientific Journal, 3(1): 1–16.
Ikotun, A.M., Ezugwu, A.E., Abualigah, L., Abuhaija, B. and Heming, J. (2023). K-means clustering algorithms: A comprehensive review, variants analysis, and advances in the era of big data. Information Sciences, 622: 178–210. https://doi.org/10.1016/j.ins.2022.11.139
Jadhav, D., Konnur, B.A. and Patil, S. (2020). Analysis of factors causing cost overruns in residential building construction projects. International Journal of Research in Engineering, Science and Management, 3(7): 308–311.
Johari, Z., Cheraghi, M. and Ardakani, S.S. (2018). Environmental risk assessment of Ilam Petrochemical Company using analytical network analysis and the technique for order of preference by similarity to ideal solution methods in 2016. Journal of Ilam University of Medical Sciences, 26(5): 79–88. https://doi.org/10.29252/sjimu.26.5.79
Johnson, R.M. and Babu, R.I.I. (2018). Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5): 402–411. https://doi.org/10.1080/15623599.2018.1484864
Kamaruddeen, A.M., Chang, F.S. and Wahi, W. (2020). A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Civil Engineering and Architecture, 8(3): 191–199. https://doi.org/10.13189/cea.2020.080301
Keng, T.C., Mansor, N. and Ching, Y.K. (2018). An exploration of cost overrun in building construction projects. Global Business and Management Research: An International Journal, 10(3): 638–646.
Laudati, D. and Pesaran, M.H. (2023). Identifying the effects of sanctions on the Iranian economy using newspaper coverage. Journal of Applied Econometrics, 38(3): 271–294. https://doi.org/10.1002/jae.2947
Leu, S.-S., Liu, Y. and Wu, P.-L. (2023). Project cost overrun risk prediction using hidden Markov chain analysis. Buildings, 13(3): 667. https://doi.org/10.3390/buildings13030667
Li, T., Shen, H., Yuan, Ǫ., Zhang, X. and Zhang, L. (2017). Estimating ground-level PM2.5 by fusing satellite and station observations: A geo-intelligent deep learning approach. Geophysical Research Letters, 44(23): 11985–11993. https://doi.org/10.1002/2017GL075710
Liravinia, B., Modiri, M. and Hafshjani, K.F. (2023). Identification and evaluation of the design risks in Iran’s oil, gas and petrochemical industry. Journal of Information and Organizational Sciences, 47(1): 21–37. https://doi.org/10.31341/jios.47.1.2
Mahamid, I. (2014). Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine. IES Journal Part A: Civil and Structural Engineering, 7(1): 38–50. https://doi.org/10.1080/19373260.2013.854180
Mahdavian, A., Shojaei, A., Salem, M., Yuan, J.S. and Oloufa, A.A. (2021). Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001991
Mittal, M., Sharma, R.K. and Singh, V.P. (2019). Performance evaluation of threshold-based and k-means clustering algorithms using Iris dataset. Recent Patents on Engineering, 13(2): 131–135. https://doi.org/10.2174/1872212112666180510153006
Moghayedi, A. and Windapo, A. (2022). Modelling the uncertainty of cost and time in highway projects. Infrastructure Asset Management, 9(2): 73–88. https://doi.org/10.1680/jinam.21.00004
Monteiro, F.P., Sousa, V., Meireles, I. and Oliveira Cruz, C. (2021). Cost modeling from the contractor perspective: Application to residential and office buildings. Buildings, 11(11): 529. https://doi.org/10.3390/buildings11110529
Mrad, C., Titirla, M.D. and Larbi, W. (2021). Comparison of strengthening solutions with optimized passive energy dissipation systems in symmetric buildings. Applied Sciences, 11(21): 10103. https://doi.org/10.3390/app112110103
Nassar, Y.S. and Erzaij, K.R. (2022). Developing models to predict the effect of crises on construction projects using MLR technique. Periodicals of Engineering and Natural Sciences, 10(2): 455–466. https://doi.org/10.21533/pen.v10i2.2769
Nyimbili, F. and Nyimbili, L. (2024). Types of purposive sampling techniques with their examples and application in qualitative research studies. British Journal of Multidisciplinary and Advanced Studies, 5(1): 90–99. https://doi.org/10.37745/bjmas.2022.0419
Omran, A., Saleh, M.S.H. and Gebril, A.W.O. (2023). Factors causing time and cost overruns of construction projects in Malaysia. Design, Construction, Maintenance, 3: 179–186. https://doi.org/10.37394/232022.2023.3.15
Pencina, M.J., D’Agostino, R.B. and Massaro, J.M. (2013). Understanding increments in model performance metrics. Lifetime Data Analysis, 19(2): 202–218. https://doi.org/10.1007/s10985-012-9238-0
Petrusheva, S., Car-Pušić, D. and Zileska-Pancovska, V. (2019). Support vector machine based hybrid model for prediction of road structures construction costs. IOP Conference Series: Earth and Environmental Science, 222: 012010. https://doi.org/10.1088/1755-1315/222/1/012010
Piryonesi, S.M. and El-Diraby, T.E. (2019). Data analytics in asset management: Cost-effective prediction of the pavement condition index. Journal of Infrastructure Systems, 26(1): 04019036.
Plebankiewicz, E. and Wieczorek, D. (2020). Prediction of cost overrun risk in construction projects. Sustainability, 12(22): 9341. https://doi.org/10.3390/su12229341
Project Management Institute (2017). A Guide to the Proįect Management Body of Knowledge (PMBOK® Guide). 6th Ed. Newtown Square, PA: Project Management Institute.
Ragheb, A.M., Massoud, H.H. and Hamisa, M.T. (2020). Developing an ANN model to predict the contractor’s actual cost overruns for lump sum contract projects in Egypt. Al-Azhar University Civil Engineering Research Magazine, 42(3): 98–126.
Rajput, B. and Agarwal, A. (2020). Selection of construction equipment supplier using analytical hierarchy process. IUP Journal of Management Research, 19(3): 7–15.
Sardroud, A.M., Kameli, M., Hosseinalipour, M., Ahmed, S.M. and Behruyan, M. (2021). Improving maintenance performance by developing an IFC BIM/RFID-based computer system. Journal of Ambient Intelligence and Humanized Computing, 12: 3055–3074.
Senouci, A., Ismail, A. and Eldin, N. (2016). Time delay and cost overrun in Ǫatari public construction projects. Procedia Engineering, 164: 368–375. https://doi.org/10.1016/j.proeng.2016.11.632
Shahidi-Nia, O. (2022). PETZONE petrochemical output seen to hit 19 m tons by late Mar. Tehran Times, 5 March.
Sharma, V., Zaki, M., Jha, K.N. and Krishnan, N.M.A. (2022). Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3): 1241–1257. https://doi.org/10.1108/ECAM-10-2020-0778
Shiha, A., Dorra, E.M. and Nassar, K. (2020). Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001785
Shoar, S., Chileshe, N. and Edwards, J.D. (2022). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression. Journal of Building Engineering, 50: 104102. https://doi.org/10.1016/j.jobe.2022.104102
Sohu, S., Ansari, A.A. and Jhatial, A.A. (2021). Most common factors causing cost overrun with its mitigation measure for Pakistan construction industry. International Journal of Sustainable Construction Engineering and Technology, 11(2): 256–261. https://doi.org/10.30880/ijscet.2021.11.02.032
Srinivasan, N.P., Gowtham, T., Kumar, A.R.R., Baalaji, M. and Kumar, S.N. (2021). A review on feasible cost prediction model in construction projects. Information Technology in Industry, 9(3): 537–543.
Tajziyehchi, N., Moshirpour, M., Jergeas, G. and Sadeghpour, F. (2020). A predictive model of cost growth in construction projects using feature selection. In 2020 IEEE Third International Conference on Artificial Intelligence and Knowledge Engineering (AIKE). New York: IEEE, 142–147. https://doi.org/10.1109/AIKE48582.2020.00029
Tayyab, M., Furkhan, M., Rizwan, M., Jameel, M. and Chadee, A. (2023). A study on factors influencing cost overrun in high-rise building construction across India. Journal of Smart Buildings and Construction Technology, 5(1): 52–83. https://doi.org/10.30564/jsbct.v5i1.5489
Tijaníc, K., Car-Pušić, D. and Šperac, M. (2019). Cost estimation in road construction using artificial neural network. Neural Computing and Applications, 32: 9343–9355.
Xu, J. (2023). Systematic analysis and application prospect of decision tree. Highlights in Science, Engineering and Technology, 71: 163–170. https://doi.org/10.54097/hset.v71i.12687