A Meta-Analysis of Factors Affecting Construction Labour Productivity in the Middle East

Main Article Content

Oluseyi Julius Adebowale
Justus Ngala Agumba

Abstract

Despite the importance of the construction sector for economic development, labour productivity in construction is lower than the productivity of other sectors. Construction productivity has been declining continuously for decades, especially in developing countries. The challenges of low productivity in construction are considered chronic problems. This has raised concerns among construction stakeholders to address the myriad of challenges that are undermining labour productivity growth. This study performed a metadata analysis of factors affecting construction labour productivity (CLP) growth in the Middle East. A systematic review of existing studies on labour productivity in construction was presented. Ten studies from the Middle East were selected for metadata analysis. The key factors affecting CLP in the region were identified and quantitative data from the selected studies were synthesised. Effect summaries derived from the analysis revealed that delays in responding to requests for information, inadequate workers’ supervision, a shortage of skilled labour, the extent of change orders and clarity of technical specifications are the major factors affecting construction productivity. The study is limited to journal articles published in the Scopus database between 2000 and 2020. Middle East contractors can adopt the study’s interventions to develop productivity improvement strategies for their organisations. 

Article Details

How to Cite
Oluseyi Julius Adebowale, and Justus Ngala Agumba. 2023. “A Meta-Analysis of Factors Affecting Construction Labour Productivity in the Middle East”. Journal of Construction in Developing Countries 28 (1): 193-220. https://doi.org/10.21315/jcdc-12-21-0192.
Section
Articles

References

Abdul Kadir, M.R., Lee, W.P., Jaafar, M.S., Sapuan, S.M. and Ali, A.A.A. (2005). Factors affecting construction labour productivity for Malaysian residential projects. Structural Survey, 23(1): 42–54. https://doi.org/10.1108/02630800510586907

Adebowale, O.J. and Agumba, J.N. (2022). A scientometric analysis and review of construction labour productivity research. International Journal of Productivity and Performance Management, Forthcoming. https://doi.org/10.1108/IJPPM-09-2021-0505

Adebowale, O.J. and Smallwood, J.J. (2020). Qualitative model of factors influencing construction labour productivity in South Africa. Journal of Construction, 13(1):19–30.

Afolabi, A.O., Ojelabi, R.A., Omuh, I.O., Tunji-Olayeni, P. and Adeyemi, M. (2018). Critical success factors influencing productivity of construction artisans in the building industry. International Journal of Mechanical Engineering and Technology, 9(8): 858–867.

Alaghbari, W., Al-Sakkaf, A.A. and Sultan, B. (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1): 79–91. https://doi.org/10.1080/15623599.2017.1382091

Alaloul, W.S., Alzubi, K.M., Malkawi, A.B., Al Salaheen, M. and Musarat, M.A. (2021). Productivity monitoring in building construction projects: A systematic review. Engineering, Construction and Architectural Management, 29(7): 2760–2785. https://doi.org/10.1108/ECAM-03-2021-0211

Almathami, K.Y., Trigunarsyah, B. and Coffey, V. (2017). Factors influencing productivity in construction. Proceedings of the Ninth International Structural Engineering and Construction Conference. Valencia, Spain: ISEC Press, 1246–1251. https://doi.org/10.14455/ISEC.res.2017.23

Alruqi, W.M., Hallowell, M.R. and Techera, U. (2018). Safety climate dimensions and their relationship to construction safety performance: A meta-analytic review. Safety Science, 109: 165–173. https://doi.org/10.1016/j.ssci.2018.05.019

Alinaitwe, H.M., Mwakali, J.A. and Hansson, B. (2007). Factors affecting the productivity of building craftsmen: Studies of Uganda. Journal of Civil Engineering and Management, 13(3): 169–176. https://doi.org/10.3846/13923730.2007.9636434

Al-Rubaye, Z.R.A. and Mahjoob, A.M.R. (2020). Identify the main factors affecting labor productivity within different organizational structures in the Iraqi construction sector. IOP Conference Series: Materials Science and Engineering, 745: 012146. https://doi.org/10.1088/1757-899X/745/1/012146

Attar, A.A., Gupta, A.K. and Desai, D.B. (2012). A study of various factors affecting labour productivity and methods to improve it. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 1(3): 11–14.

Borenstein, M., Hedges, L.V., Higgins, J.P.T. and Rothstein, H.R. (2009). Introduction to Meta-Analysis. West Sussex, England: John Wiley & Sons Ltd. https://doi.org/10.1002/9780470743386

Borg, L. and Song, H.S. (2015). Quality change and implications for productivity development: Housing construction in Sweden 1990–2010. Journal of Construction Engineering and Management, 141(1): 05014014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000928

Chan, P.W. and Kaka, A. (2007). Productivity improvements: Understand the workforce perceptions of productivity first. Personnel Review, 36(4): 564–584. https://doi.org/10.1108/00483480710752803

Dai, J. and Goodrum, P.M. (2011). Differences in perspectives regarding labor productivity between Spanish- and English-speaking craft workers. Journal of Construction Engineering and Management, 137(9): 689–697. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000329

Dai, J., Goodrum, P.M. and Maloney, W.F. (2009). Construction craft workers’ perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3): 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217)

_____. (2007). Analysis of craft workers’ and foremen’s perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11): 1139–1152. https://doi.org/10.1080/01446190701598681

Dey, S., Prabhu, S.M. and Subramani, G.S. (2017). Identification and mitigation of factors affecting human resource productivity in construction. International Journal of Civil Engineering and Technology, 8(1): 123–131.

Durdyev, S. and Mbachu, J. (2011). On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3): 18–33.

El-Gohary, K.M. and Aziz, R.F. (2014). Factors influencing construction labor productivity in Egypt. Journal of Management in Engineering, 30(1): 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168

Enshassi, A., Mohamed, S., Mustafa, Z.A. and Mayer, P.E. (2007). Factors affecting labour productivity in building projects in the Gaza Strip. Journal of Civil Engineering and Management, 13(4): 245–254. https://doi.org/10.3846/13923730.2007.9636444

Fadejeva, L. and Melihovs, A. (2010). Measuring total factor productivity and variable factor utilization. Eastern European Economics, 48(5): 63–101. https://doi.org/10.2753/EEE0012-8775480504

Fellows, R. and Liu, A. (2003). Research Methods for Construction. 2nd Ed. Oxford: Blackwell Science.

Ghoddousi, P. and Hosseini, M.R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy, 18(1): 99–116. https://doi.org/10.3846/20294913.2012.661203

Ghoddousi, P., Poorafshar, O., Chileshe, N. and Hosseini, M.R. (2015). Labour productivity in Iranian construction projects: Perceptions of chief executive officers. International Journal of Productivity and Performance Management, 64(6): 811–830. https://doi.org/10.1108/IJPPM-10-2013-0169

Hafez, S.M., Aziz, R.F., Morgan, E.S., Abdullah, M.M. and Ahmed, E.K. (2014). Critical factors affecting construction labor productivity in Egypt. American Journal of Civil Engineering, 2(2): 35–40. https://doi.org/10.11648/j.ajce.20140202.14

Hai, D.T. and Van Tam, N. (2019). Analysis of affected factors on construction productivity in Vietnam. International Journal of Civil Engineering and Technology, 10(2): 854–864.

Hanna, A.S. and Heale, D.G. (1994). Factors affecting construction productivity: Newfoundland versus rest of Canada. Canadian Journal of Civil Engineering, 21(4): 663–673. https://doi.org/10.1139/l94-066

Hari, P., Panday, M. and Gupta, R. (2016). Effect of time delay in construction projects. International Journal of Engineering Development and Research, 4(2): 1127–1129.

Hasan, A., Baroudi, B., Elmualim, A. and Rameezdeen, R. (2018). Factors affecting construction productivity: A 30 year systematic review. Engineering, Construction and Architectural Management, 25(7): 916–937. https://doi.org/10.1108/ECAM-02-2017-0035

Hiyassat, M.A., Hiyari, M.A. and Sweis, G.J. (2016). Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2): 138–149. https://doi.org/10.1080/15623599.2016.1142266

Hosseini, M.R., Martek, I., Zavadskas, E.K., Aibinu, A.A., Arashpour, M. and Chileshe, N. (2018). Critical evaluation of off-site construction research: A scientometric analysis. Automation in Construction, 87: 235–247. https://doi.org/10.1016/j.autcon.2017.12.002

Hwang, B.G., Zhu, L. and Ming, J.T.T. (2017). Factors affecting productivity in green building construction projects: The case of Singapore. Journal of Management in Engineering, 33(3): 04016052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000499

Jalal, M.P. and Shoar, S. (2019). A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3): 630–654. https://doi.org/10.1108/JFMPC-10-2018-0061

Jarkas, A.M. (2015). Factors influencing labour productivity in Bahrain’s construction industry. International Journal of Construction Management, 15(1): 94–108. https://doi.org/10.1080/15623599.2015.1012143

Jarkas, A.M. and Bitar, C.G. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management, 138(7): 811–820. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501

Jarkas, A.M., Kadri, C.Y. and Younes, J.H. (2012). A survey of factors influencing the productivity of construction operatives in the State of Qatar. International Journal of Construction Management, 12(3): 1–23. https://doi.org/10.1080/15623599.2012.10773192

Jarkas, A.M., Radosavljevic, M. and Wuyi, L. (2014). Prominent demotivational factors influencing the productivity of construction project managers in Qatar. International Journal of Productivity and Performance Management, 63(8): 1070–1090. https://doi.org/10.1108/IJPPM-11-2013-0187

Jarkas, A.M., Al Balushi, R.A. and Raveendranath, P.K. (2015). Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4): 332–344. https://doi.org/10.1080/15623599.2015.1094849

Kaming, P.F., Olomolaiye, P.O., Holt, G.D. and Harris, F.C. (1997). Factors influencing craftsmen’s productivity in Indonesia. International Journal of Project Management, 15(1): 21–30. https://doi.org/10.1016/S0263-7863(96)00019-1

Kazaz, A. and Ulubeyli, S. (2007). Drivers of productivity among construction workers: A study in a developing country. Building and Environment, 42(5): 2132–2140. https://doi.org/10.1016/j.buildenv.2006.04.020

Kazaz, A., Manisali, E. and Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal of Civil Engineering and Management, 14(2): 95–106. https://doi.org/10.3846/1392-3730.2008.14.4

Loosemore, M. (2014). Improving construction productivity: A subcontractor’s perspective. Engineering, Construction and Architectural Management, 21(3): 245–260. https://doi.org/10.1108/ECAM-05-2013-0043

Mahamid, I. (2013). Contractors perspective toward factors affecting labour productivity in building construction. Engineering, Construction and Architectural Management, 20(5): 446–460. https://doi.org/10.1108/ECAM08-2011-0074

Makulsawatudom, A., Emsley, M. and Sinthawanarong, K. (2004). Critical factors influencing construction productivity in Thailand. The Journal of KMITNB, 14(3): 1–6.

Mojahed, S. and Aghazadeh, F. (2008). Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA. International Journal of Project Management, 26(2): 195–202. https://doi.org/10.1016/j.ijproman.2007.06.003

Nasir, H., Ahmed, H., Haas, C. and Goodrum, P.M. (2014). An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6): 595–607. https://doi.org/10.1080/01446193.2013.848995

Naoum, S.G. (2016). Factors influencing labour productivity on construction sites: A state-of-the-art literature review and a survey. International Journal of Productivity and Performance Management, 65(3): 401–421. https://doi.org/10.1108/IJPPM-03-2015-0045

Neve, H.H., Wandahl, S., Lindhard, S., Teizer, J. and Lerche, J. (2020). Determining the relationship between direct work and construction labour productivity in North America: Four decades of insights. Journal of Construction Engineering and Management, 146(9): 04020110. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001887

Neyeloff, J.L., Fuchs, S.C. and Moreira, L.B. (2012). Meta-analyses and Forest plots using a Microsoft Excel spreadsheet: Step-by-step guide focusing on descriptive data analysis. BMC Research Notes, 5(1): 52–57. https://doi.org/10.1186/1756-0500-5-52

Noor, B.A. and Yi, S. (2018). Review of BIM literature in construction industry and transportation: Meta-analysis. Construction Innovation, 18(4): 433–452. https://doi.org/10.1108/CI-05-2017-0040

Odesola, I.A. and Idoro, G.I. (2014). Influence of labour-related factors on construction labour productivity in the south-south geo-political zone of Nigeria. Journal of Construction in Developing Countries, 19(1): 93–107.

Olawumi, T.O., Chan, D.W.M. and Wong, J.K.W. (2018). Evolution in the intellectual structure of BIM research: A bibliometric analysis. Journal of Civil Engineering and Management, 23(8): 1060–1081. https://doi.org/10.3846/13923730.2017.1374301

Olomolaiye, P.O., Wahab, K.A. and Price, A.D.F. (1987). Problems influencing craftsmen’s productivity in Nigeria. Building and Environment, 22(4): 317–323. https://doi.org/10.1016/0360-1323(87)90024-2

Ouga, A.D., Alinaitwe, H.M. and Mwesige, G. (2020). Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1): 109–128. https://doi.org/10.21315/jcdc2020.25.1.6

Rad, K.G. and Kim, S.Y. (2018). Factors affecting construction labour productivity: Iran case study. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 42(2): 165–180. https://doi.org/10.1007/s40996-018-0095-2

Rivas, R.A., Borcherding, J.D., González, V. and Alarcón, L.F. (2011). Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4): 312–320. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000274

Robles, G., Stifi, A., Ponz-Tienda, J.L. and Gentes, S. (2014). Labour productivity in the construction industry: Factors influencing the Spanish construction labour productivity. International Journal of Civil and Environmental Engineering, 8(10): 1061–1070. https://doi.org/10.5281/zenodo.1096495

Sangole, A. and Ranit, A. (2013). Identifying factors affecting construction labour productivity in Amravati. International Journal of Science and Research, 4(5): 1585–1588.

Sanni-Anibire, M.O., Mohamad Zin, R. and Olatunji, S.O. (2020). Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8): 1395–1407. https://doi.org/10.1080/15623599.2020.1716132

Shan, Y., Zhai, D., Goodrum, P.M., Haas, C.T. and Caldas, C.H. (2016). Statistical analysis of the effectiveness of management programs in improving construction labour productivity on large industrial projects. Journal of Management Engineering, 32(1): 04015018. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000375

Thomas, A.V. and Sudhakumar, J. (2013). Critical analysis of the key factors affecting construction labour productivity: An Indian perspective. International Journal of Construction Management, 13(4): 103–125. https://doi.org/10.1080/15623599.2013.10878231

Toan, N.Q., Van Tam, N., Hai, D.T. and Quy, N.L.D. (2020). Critical factors affecting labour productivity within construction project implementation: A project manager’s perspective. Entrepreneurship and Sustainability Issues, 8(2): 751–763. https://doi.org/10.9770/jesi.2020.8.2(45)

Valverde-Gascueña, N., Navarro-Astor, E., Fuentes-Del-Burgo, J. and Ruiz-Fernandez, J.P. (2010). Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In C. Egbu and E.C.W. Lou (eds.), Proceedings: 27th Annual ARCOM Conference. Bristol, UK: Association of Researchers in Construction Management, 879–888.

Vigneshkumar, C. and Salve, U.R. (2020). A scientometric analysis and review of fall from height research in construction. Construction Economics and Building, 20(1): 17–35. https://doi.org/10.5130/AJCEB.v20i1.6802

Vogl, B. and Abdel-Wahab, M. (2015). Measuring the construction industry’s productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000944

Yap, J.B.H., Chow, I.N. and Shavarebi, K. (2019). Criticality of construction industry problems in developing countries: Analyzing Malaysian projects. Journal of Management in Engineering, 35(5): 04019020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000709

Yi, W. and Chan, A.P. (2014). Critical review of labour productivity research in construction journals. Journal of Management in Engineering, 30(2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194

Zhao, T. and Dungan, J.M (2014). Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000800