Critical Success Factors for Adopting Supply Chain Management in Tanzanian Construction Projects
Main Article Content
Abstract
Supply chain management (SCM) has been effective in several industries, such as the manufacturing industry and agriculture. SCM is the active management of supply chain activities to maximise customer value and achieve a sustainable competitive advantage. Therefore, the adoption of SCM by construction businesses can help reduce delays, thereby improving their competitive advantage. The purpose of this study is to discover which critical success factors (CSFs) determine the successful adoption of SCM in the construction projects, with the aim of filling the knowledge gap in the context of a developing country by using a questionnaire. To achieve this, respondents were purposely selected from construction firms registered in Class 1 and 2 by the Contractors Registration Board of Tanzania. Out of 100 questionnaires distributed, 60 were returned filled in fairly well for analysis. The data was analysed using two features of IBM SPSS version 20, which are descriptive statistics frequencies and compare means-one-sample t-test. The findings revealed that the CSFs for adopting SCM by construction projects were providing logistics at a lower cost and on-time delivery to clients, having a centrally coordinated logistics function and top management’s commitment and support. It means that clients, contractors, subcontractors, consultants and suppliers/manufacturers will need to rethink what CSFs determine the performance of the construction projects using SCM, as knowing which ones are critical would lead to improved project delivery. This study contributes to the body of knowledge by providing insights into the CSFs that can be adopted by firms to successfully implement SCM in construction projects for sustainable construction businesses in Tanzania, which has not been explored.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ab Talib, M.S., Abdul Hamid, A.B. and Thoo, A.C. (2015). Critical success factors of supply chain management: A literature survey and Pareto analysis. EuroMed Journal of Business, 10(2): 234–263. https://doi.org/10.1108/EMJB-09-2014-0028
Al-Werikat, G. (2017). Supply chain management in construction: Revealed. International Journal of Scientific and Technology Research, 6(3): 106–110.
Aneesa, M., Gupta, A.K. and Desai, D.B. (2015). Supply chain management: Effective tool in construction industry. International Journal of Novel Research in Engineering and Science, 2(1): 35–40.
Asad, S., Khalfan, M.M.A. and McDermott, P. (2005). Managing knowledge across the construction supply chain. Paper presented at the 2nd International Salford Centre for Research and Innovation (SCRI) Research Symposium: In conjunction with the International Built and Human Environment Research Week. University of Salford, United Kingdom, 12–13 April.
Azfar, K.R.W., Khan, N. and Gabriel, H.F. (2014). Performance measurement: A conceptual framework for supply chain practices. Procedia – Social and Behavioral Sciences, 150: 803–812. https://doi.org/10.1016/j.sbspro.2014.09.089
Aziz, R.F. and Hafez, S.M. (2013). Applying lean thinking in construction and performance improvement. Alexandria Engineering Journal, 52(4): 679–695. https://doi.org/10.1016/j.aej.2013.04.008
Bertel, S., Fenies, P. and Roux, O. (2008). Optimal cash flow and operational planning in a company supply chain. International Journal of Computer Integrated Manufacturing, 21(4): 440–454. https://doi.org/10.1080/09511920701574628
Chau, K.Y., Tang, Y.M., Liu, X., Ip, Y.K. and Tao, Y. (2021). Investigation of critical success factors for improving supply chain quality management in manufacturing. Enterprise Information Systems, 15(10): 1418–1437.
https://doi.org/10.1080/17517575.2021.1880642
Cheng, J.C.P, Law, K.H., Bjornsson, H., Jones, A. and Sriram, R. (2010). A service oriented framework for construction supply chain integration. Automation in Construction, 19(2): 245–260. https://doi.org/10.1016/j.autcon.2009.10.003
Duncan, R. (2001). The Six Rules of Logistic Strategy Implementation. London: PA Consulting Group.
Fawcett, S.E. and Magnan, G.M. (2003). Supply chain barriers, bridges and benefits: Perspectives from the literature. In Proceedings: 34th Annual Meeting of the Decision Sciences Institute. Madison, WI: Omnipress.
Gosling, J., Naim, M. and Towill, D. (2013). Identifying and categorizing the sources of uncertainty in construction supply chains. Journal of Construction Engineering and Management, 139(1): 102–110. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000574
Handfield, R.B. and Nichols, E.L. (2003). Supply Chain Redesign: Transforming Supply Chains into Integrated Value Systems. New York: Financial Times Prentice Hall.
Hariharan, G., Suresh, P. and Sagunthala, C. (2019). Critical success factors for the implementation of supply chain management in SMEs. International Journal of Recent Technology and Engineering, 7(5S3): 540–543.
Hassan, H. (2018). Potentials of supply chain management in building construction projects in Tanzania. Unpublished diss. Ardhi University.
Ireland, P. (2004). Managing appropriately in construction power regimes: Understanding the impact of regularity in the project environment. Supply Chain Management, 9(5): 372–382. https://doi.org/10.1108/13598540410560757
Jagtap, M. and Kamble, S. (2019). An empirical assessment of relational contracting model for supply chain of construction projects. International Journal of Managing Projects in Business, 13(7): 1537–1560. https://doi.org/10.1108/IJMPB-05-2018-0097
Khalfan, M.M.A, McDermott, P. and Kyng, E. (2006). Procurement impacts on construction supply chains: UK experiences. In Proceedings of the Symposium on Sustainability and Value through Construction Procurement. Salford: SCRI University of Salford, 322–331.
Kikwasi, G.J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, Conference Series, 1(2): 52–59. https://doi.org/10.5130/ajceb-cs.v1i2.3166
Kocoglu, I., Imamoglu S.Z., Ince, H. and Keskina, H. (2011). The effect of supply chain integration on information sharing: Enhancing the supply chain performance. Procedia – Social and Behavioral Sciences, 24(3): 1630–1649. https://doi.org/10.1016/j.sbspro.2011.09.016
Koskela, L. and Vrijhoef, R. (2000). The four roles of supply chain management in construction. European Journal of Purchasing and Supply Chain Management, 6(3–4): 169–178. https://doi.org/10.1016/S0969-7012(00)00013-7
Kumar, R., Singh, R.K. and Shankar, R. (2015). Critical success factors for implementation of supply chain management in Indian small and medium enterprises and their impact on performance. IIMB Management Review, 27(2): 78. https://doi.org/10.1016/j.iimb.2015.04.005
McDermott, P. and Khalfan, M.A. (2012). Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2): 44–54. https://doi.org/10.5130/AJCEB.v6i2.2983
Nguyen, P.T., Nguyen, V.N., Pham, L.H., Nguyen, T.A., Nguyen, Q.L.H.T.T. and Huynh, V.D.B. (2018). Application of supply chain management in construction industry. Advances in Science and Technology Research Journal, 12(2): 11–19. https://doi.org/10.12913/22998624/92112
Nguyen, V.N., Pham, L.H., Phong, T.A.N., Nguyen, T., Hoang, Q.L., Nguyen, T.T., Huynh, V.D. (2016). Applying supply chain management to construction industry: A case study of Vietnam. Proceedings of the 3rd International Conference on Finance and Economics. Zlín, Czech Republic: Tomas Bata University in Zlín.
O’Brien, W., London, K. and Vrijhoef, R. (2002). Construction supply chain modeling: A research review and interdisciplinary research agenda. In Proceedings: 10th Annual Conference of the International Group for Lean Construction. Gramado, Brazil: IGLC-10.
Ochieng, E.G. and Price, A.D.F. (2009). Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(6): 527–543. https://doi.org/10.1108/09699980911002557
Papadopoulos, G.A., Zamer, N., Gayialis, S.P. and Tatsiopoulos, I.P. (2016). Supply chain improvement in construction industry. Universal Journal of Management, 4(10): 528–534. https://doi.org/10.13189/ujm.2016.041002
Rao, C., Rao, K.P. and Muniswamy, V.V. (2011). Delivery performance measurement in an integrated supply chain management: Case study in batteries manufacturing firm. Serbian Journal of Management, 6(2): 205–220. https://doi.org/10.5937/sjm1102205M
Remmy, B. (2018). A study of supply chain management in construction industry. Unpublished diss. Ardhi University.
Saunders, M., Lewis, P. and Thornhill, A. (2016). Research Methods for Business Students. 7th Ed. Harlow, UK: Pearson.
Segerstedt, A. and Olofsson, T. (2010). Supply chains in the construction industry. Supply Chain Management, 15(5): 347–353. https://doi.
org/10.1108/13598541011068260
Singh, A.S. and Masuku, M.B. (2014). Sampling techniques and determination of sample size in applied statistics research: An overview. International Journal of Economics, Commerce and Management, 2(11): 1–22.
Sospeter, N.G., Rwelamila, P.D. and Gimbi, J. (2020). Project management challenges for post-disaster reconstruction projects in Angola: A public sector perspective. International Journal of Managing Projects in Business, 14(3): 767–787. https://doi.org/10.1108/IJMPB-03-2020-0087
Sospeter, N.G., Rwelamila, P.D. and Matiku, J.P. (2019). Challenges for improving integrated construction supply chain in Tanzanian construction projects: The case of competent entities, towards industrialized Africa; Opportunities and challenges. Paper presented at the IAABD Conference. Dar es Salaam, Tanzania, 8–11 May.
Tan, K.C. (2001). A framework of supply chain management literature. European Journal of Publishing and Supply Management, 7(1): 39–48. https://doi.org/10.1016/S0969-7012(00)00020-4
Tucker, S.N., Mohamed, S., Johnston, D.R., McFarlan, S.L. and Hampson, K.D. (2001). Building and Construction Industries Supply Chain Project (Domestic). Canberra: Commonwealth Scientific and Industrial Research Organisation (CSIRO).
Vidalakis, C., Tookey, J.C. and Sommerville, J. (2011). The logistics of construction supply chains: The builders’ merchant perspective. Engineering, Construction and Architectural Management, 18(1): 66–81. https://doi.org/10.1108/09699981111098694
Vrijhoef, R. and Voordijk, H. (2003). Improving supply chain management in construction: What can be learned from the food and grocery sector? Paper presented at the CIB Joint International Symposium on Knowledge Construction. Singapore, 22–24 October.
Yamane, T. (1967). Statistics: An Introductory Analysis. 2nd Ed. New York: Harper and Row.
Ying, F., Tookey, J. and Seadon, J. (2018). Measuring the invisible: A key performance indicator for managing construction logistics performance. Benchmarking. An International Journal, 25(6): 1921–1934. https://doi.org/10.1108/BIJ-11-2016-0176