Solutions to Overcome Integrated Project Delivery Implementation Barriers: A Meta-Synthesis Approach
Main Article Content
Abstract
Construction projects encounter myriad problems, some of which may be connected to the project delivery model. Integrated project delivery (IPD) is an approach that removes the gap between the planning and the construction stages of a project. Various barriers to implementation exist within the construction industry and these can be resolved by effective solutions. Identifying and classifying these solutions is considered essential for successful project delivery. In this context, this study aims to illustrate and classify the solutions that have been proposed since the introduction of IPD as a new approach for the implementation of construction projects. In this study, a meta-synthesis approach has been used as a qualitative method, and pattern and descriptive coding and analysis have been used to analyse the data. The solutions analysed in the meta-synthesis suggest that all stakeholders— including designers, construction engineers, construction team members and operation and maintenance team members—each have the same responsibility to improve IPD and meet the project goals. This study is significant because it suggests important resolutions to the barriers to IPD implementation and may help construction industry stakeholders better facilitate IPD and enhance clauses of their contracts.
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ahmad, I., Azhar, N. and Chowdhury, A. (2019). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1): 1–12. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000670
AIA (The American Institute of Architects) (2010). Integrated Project Delivery: Case Studies. Minnesota: AIA.
_____. (2007). Integrated Project Delivery: A Guide. Vol. 1. Washington DC: American Institute of Architects. Available at: https://www.aia.org/resources/64146-integrated-project-delivery-a-guide [Accessed on 4 November 2021].
Aslesen, A.R., Nordheim, R., Varegg, B. and Lædre, O. (2018). IPD in Norway. Paper presented at the 26th Annual Conference of the International Group for Lean Construction. Chennai, India, 18–20 July. https://doi.org/10.24928/2018/0284
Atkinson, A.R. and Westall, R. (2010). The relationship between integrated design and construction and safety on construction projects. Construction Management and Economics, 28(9): 1007–1017. https://doi.org/10.1080/01446193.2010.504214
Azhar, N. (2014). Integrated construction project delivery system in the U.S. public sector: An information modeling framework. PhD diss. Florida International University. https://doi.org/10.25148/etd.FI14071158
Azhar, N., Kang, Y. and Ahmad, I.U. (2014). Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective. Procedia Engineering, 77: 213–221. https://doi.org/10.1016/j.proeng.2014.07.019
Basu, R., Little, C. and Millard, C. (2009). Case study: A fresh approach of the balanced scorecard in the Heathrow Terminal 5 project. Measuring Business Excellence, 13(4): 22–33. https://doi.org/10.1108/13683040911006765
Bilbo, D., Bigelow, B.F., Escamilla E. and Lockwood C. (2014). Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1): 40–53. https://doi.org/10.1080/15578771.2013.872734
Brady, T. and Davies, A. (2010). From hero to hubris: Reconsidering the project management of Heathrow’s Terminal 5. International Journal of Project Management, 28(2): 151–157. https://doi.org/10.1016/j.ijproman.2009.11.011
Caldwell, N., Roehrich, J. and Davies, A. (2009). Procuring complex performance in construction: London Heathrow Terminal 5 and a private finance initiative hospital. Journal of Purchasing and Supply Management, 15(3): 178–186. https://doi.org/10.1016/j.pursup.2009.05.006
Campbell, R., Pound, P., Pope, C., Britten, N., Pill, R., Morgan, M. and Donovan J. (2003). Evaluating meta-ethnography: A synthesis of qualitative research on lay experiences of diabetes and diabetes care. Social Science and Medicine, 56(4): 671–684. https://doi.org/10.1016/S0277-9536(02)00064-3
CEC (Commission for Environmental Cooperation) (2015). Improving Green Building Construction in North America: Guide to Integrated Design and Delivery. Montreal, Canada: CEC. Available at: https://www3.cec.org/islandora/en/item/11661-improving-green-building-construction-in-north-america-guideintegrateddesign-en.pdf [Accessed on 4 November 2021].
Chen, L. and MingMak, C. (2021). Integrated impacts of building height and upstream building on pedestrian comfort around ideal lift-up buildings in a weak wind environment. Building and Environment, 200: 107963. https://doi.org/10.1016/j.buildenv.2021.107963
Cheng, J.C.P., Tan, Y., Song, Y., Mei, Z., Gan, V.J.L. and Wang, X. (2018). Developing an evacuation evaluation model for offshore oil and gas platforms using BIM and agent-based model. Automation in Construction, 89: 214–224. https://doi.org/10.1016/j.autcon.2018.02.011
Cheng, R. (2012). IPD Case Studies. Minnesota: AIA. Available at: https://hdl.handle.net/11299/201408 [Accessed on 4 November 2021].
W. and Parrish, K. (2014). The need for integrated project delivery in the public sector. Paper presented at the Construction Research Congress. Atlanta, Georgia, 19–21 May. https://doi.org/10.1061/9780784413517.074
Durdyev, S., Hosseini, M.R., Martek, I., Ismail S. and Arashpour M. (2019). Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1): 186–204.
https://doi.org/10.1108/ECAM-12-2018-0535
Ebrahimi, G. and Dowlatabadi, H. (2018). Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. and Canada for a path forward. International Journal of Construction Education and Research, 15(4): 1–24. https://doi.org/10.1080/15578771.2018.1525446
El Asmar, M., Hanna, A.S. and Loh, W. (2015). Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001015
______. (2013). Quantifying performance for the integrated project delivery (IPD) system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 1–14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000744
Ghassemi, R. and Becerik-Gerber, B. (2011). Transitioning to integrated project delivery: Potential barriers and lessons learned. Lean Construction Journal, 2011: 32–52.
Glass, G.V. (1976). Primary, secondary, and meta-analysis of research. Educational Researcher, 5(10): 3–8. https://doi.org/10.3102/0013189X005010003
Govender, K., Nyagwachi, J., Smallwood, J.J. and Allen, C.J. (2018). The awareness of integrated project delivery and building information modelling: Facilitating construction projects. International Journal of Sustainable Development and Planning, 13(1): 121–129. https://doi.org/10.2495/SDP-V13-N1-121-129
Gu, J. and Tang, X. (2005). Meta-synthesis approach to complex system modeling. European Journal of Operational Research, 166(3): 597–614. https://doi.org/10.1016/j.ejor.2004.03.036
Hall, D.M. and Scott, W.R. (2019). Early stages in the institutionalization of integrated project delivery. Project Management Journal, 50(2): 1–16. https://doi.org/10.1177/8756972818819915
Hamzeh, F., Rached, F., Hraoui, Y., Karam, A.J., Malaeb, Z., El Asmar, M. and Abbas, Y. (2019). Integrated project delivery as an enabler for collaboration: A Middle East perspective. Built Environment Project and Asset Management, 9(3): 334–347. https://doi.org/10.1108/BEPAM-05-2018-0084
Jadidoleslami, S., Saghatforoush, E., Heravi, A. and Preece, C. (2019). A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7): 1225–1239. https://doi.org/10.1080/15623599.2019.1686834
Kahvandi, Z., Saghatforoush, E., Alinezhad, M. and Noghli, F. (2017). Integrated project delivery (IPD) research trends. Journal of Engineering, Project, and Production Management, 7(2): 99–114. https://doi.org/10.32738/JEPPM.201707.0006
Kahvandi, Z., Saghatforoush, E., Mahoud, M. and Preece, C. (2019a). Analysis of the barriers to the implementation of integrated project delivery (IPD): A meta-synthesis approach. Journal of Engineering, Project, and Production Management, 9(1): 2–11. https://doi.org/10.2478/jeppm-2019-0002
Kahvandi, Z., Saghatforoush, E., Ravasan, A.Z. and Mansouri, T. (2018). An FCMbased dynamic modelling of integrated project delivery implementation challenges in construction projects. Lean Construction Journal, 2018: 63–87.
Kahvandi, Z., Saghatforoush, E., ZareRavasan, A. and Preece, C. (2019b). Integrated project delivery implementation challenges in the construction industry. Civil Engineering Journal, 5(8): 1672–1683. https://doi.org/10.28991/cej-2019-03091362
Kahvandi, Z., Saghatforoush, E., ZareRavasan, A. and Viana, M.L. (2020). A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2): 1–20. https://doi.org/10.21315/jcdc2020.25.2.9
Kent, D.C. and Becerik-Gerber, B. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8): 815–825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188
Kraatz, J., Sanchez, A. and Hampson, K. (2014). Digital modeling, integrated project delivery and industry transformation: An Australian case study. Buildings, 4(3): 453–466. https://doi.org/10.3390/buildings4030453
Mesa, H.A., Molenaar, K.R. and Alarcón, L.F. (2020). Modeling supply chain integration in an integrated project delivery system. Sustainability, 12(12): 5092. https://doi.org/10.3390/su12125092
_____. (2019). Comparative analysis between integrated project delivery and lean project delivery. International Journal of Project Management, 37(3): 395–409. https://doi.org/10.1016/j.ijproman.2019.01.012
_____. (2016). Exploring performance of the integrated project delivery process on complex building projects. International Journal of Project Management, 34(7): 1089–1101. https://doi.org/10.1016/j.ijproman.2016.05.007
Mihic, M., Sertic, J. and Zavrski, I. (2014). Integrated project delivery as integration between solution development and solution implementation. Procedia – Social and Behavioral Sciences, 119: 557–565. https://doi.org/10.1016/j.sbspro.2014.03.062
Mohamed Salleh, R., Mustaffa, N.E., Abdul Rahiman, N., Tajul Ariffin, H.L. and Othman, N. (2019). The propensity of building information modelling and integrated project delivery in building construction project. International Journal of Built Environment and Sustainability, 6(1–2): 83–90. https://doi.org/10.11113/ijbes.v6.n1-2.386
Nejati, I., Javidruzi, M. and Mohebifar, A.H. (2014). Feasibility of using an integrated project delivery (IPD) in mass housing collaborative projects. Advances in Environmental Biology, 8(25): 211–218.
Noblit, G.W. and Hare, R.D. (1988). Meta-Ethnography: Synthesizing Qualitative Studies. North Carolina: SAGE Publications. https://doi.
org/10.4135/9781412985000
Noghli, F., Saghatforoush, E. and Forghani, Z. (2018). Evaluating the need to use integrated project delivery (IPD) approach as a new alternative implementation system in developing countries. In S. Şahin (ed.), 8th International Conference on Engineering, Project, and Product Management. Cham, Switzerland: Springer, 311–319. https://doi.org/10.1007/978-3-319-74123-9_33
Osman, W.N., Nawi, M.N.M., Anuar, H.S., Radzuan, K. and Osman, N.N. (2015). Readiness assessment for implementation of integrated project delivery (IPD) in industrialised building system (IBS) projects. Jurnal Teknologi, 77(4): 91–95. https://doi.org/10.11113/jt.v77.6046
Paik, J.E., Miller, V., Mollaoglu, S. and Sun, W.A. (2017). Interorganizational projects: Reexamining innovation implementation via IPD cases. Journal of Management in Engineering, 33(5): 1–15. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000524
Piroozfar, P., Farr, E.R.P., Zadeh, A.H.M., Inacio, S.T., Kilgallon, S. and Jin R. (2019). Facilitating building information modelling (BIM) using integrated project delivery (IPD): A UK perspective. Journal of Building Engineering, 26: 100907. https://doi.org/10.1016/j.jobe.2019.100907
Pishdad-Bozorgi, P. (2017). Case studies on the role of integrated project delivery (IPD) approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2): 102–124. https://doi.org/10.1080/15578771.2016.1226213
Pishdad-Bozorgi, P. and Beliveau, Y.J. (2017). A schema of trust building attributes and their corresponding integrated project delivery traits. International Journal of Construction Education and Research, 12(2): 142–160. https://doi.org/10.1080/15578771.2015.1118171
Roy, D., Malsane, S. and Samanta, P.K. (2018). Identification of critical challenges for adoption of integrated project delivery. Lean Construction Journal, 2018: 1–15.
Sandelowski, M. and Barroso, J. (2006). Handbook for Synthesizing Qualitative Research. New York: Springer. Available at: https://parsmodir.com/wpcontent/uploads/2020/03/MetaSynBook.pdf [Accessed on 4 November 2021].
Sommer, A.F., Dukovska-Popovska, I. and Steger-Jensen, K. (2014). Barriers towards integrated product development: Challenges from a holistic project management perspective. International Journal of Project Management, 32(6): 970–982. https://doi.org/10.1016/j.ijproman.2013.10.013
Sun, W., Mollaoglu, S., Miller, V. and Manata, B. (2015). Communication behaviors to implement innovations: How do AEC teams communicate in IPD projects? Project Management Journal, 46(1): 84–96. https://doi.org/10.1002/pmj.21478
Temel, B.A., Başağa, H.B., Uluçay Temel, M., Kamber Yılmaz, G. and Nasery, M.M. (2019). Big room concept in project management and control. Journal of Construction Engineering, Management and Innovation, 2(4): 204–214. https://doi.org/10.31462/jcemi.2019.04204214
Viana, M.L., Hadikusumo, B.H.W., Mohammad, M.Z. and Kahvandi, Z. (2020). Integrated project delivery (IPD): An updated review and analysis case study. Journal of Engineering, Project, and Production Management, 10(2): 147–161.
https://doi.org/10.2478/jeppm-2020-0017
Walsh, D. and Downe, S. (2005). Meta‐synthesis method for qualitative research: A literature review. Journal of Advanced Nursing, 50(2): 204–211. https://doi.org/10.1111/j.1365-2648.2005.03380.x
Weed, M.E. (2006). Sports tourism research 2000–2004: A systematic review of knowledge and a meta-evaluation of methods. Journal of Sport and Tourism, 11(1): 5–30. https://doi.org/10.1080/14775080600985150
Yahyapour, S., Shamizanjani, M. and Mosakhani, M. (2015). The conceptual framework knowledge management benefits of using meta-synthesis. Journal of Knowledge Management, 19(6): 1295–1309. https://doi.org/10.1108/JKM-05-2015-0166
Zuber, S.Z.S., Nawi, N.M. and Nifa, F.A.A. (2019). Construction procurement practice: A review study of integrated project delivery (IPD) in the Malaysian construction projects. International Journal of Supply Chain Management, 8(1): 777–783.